Effective February 11, 2013, this section of I-5 will be restricted to 12 feet 00 in. in width, and 16 feet 08 in. in height between the hours of 7 PM and 9 AM. No restrictions will be in place between 3 PM Friday and 7 PM Sunday. Estimated date of completion is May 17, 2013.
I-5 MP 66.5 to MP 81.7 NB & SB (north of Grants Pass)
Effective May 19, 2013, this section of I-5 will be restricted to 12 feet 00 in. in width and 16 feet 08 in. in height between the hours of 7 PM & 9 AM. In addition, the following ramps will be intermittently closed during the same time: Exit 71 (Sunny Valley); Exit 76 (Wolf Creek); Exit 78 (Speaker Rd); Exit 80 (Glendale). No restrictions will be in place from 9 AM Friday until 7 PM Sunday. Estimated date of completion is September 30, 2013.
I-5 SB MP 75.5 to MP 69.7 SB (Sunny Valley)
Effective June 17, 2013, this section of I-5 southbound will be restricted to 11 feet 00 in. in width between the hours of 7 PM & 9 AM. No restrictions will be in place from 9 AM Friday until 7 PM Sunday. Estimated date of completion is June 28, 2013.
I-5 MP 79.5 to MP 81.7 NB (Glendale)
Effective May 27, 2013, this section of I-5 northbound will be restricted to 11 feet 00 in. in width between the hours of 7 PM & 9 AM. No restrictions will be in place from 9 AM Friday until 7 PM Sunday. Estimated date of completion is June 14, 2013.
I-5 MP 105.00 to MP 106.51 NB (Myrtle Creek)
Effective June 13, 2013, this section of I-5 northbound will be restricted to 16 feet 00 in. in width between the hours of 8 PM & 2 AM. Estimated date of completion is June 14, 2013.
I-5 NB Exit 106 off-ramp to Weaver Rd (Myrtle Creek)
Effective June 13, 2013, the ramp from I-5 northbound Exit 106 to Weaver Rd will be closed between the hours of 8 PM & 2 AM. Estimated date of completion iss June 14, 2013.
I-5 NB Exit 192 off-ramp (to OR99/OR126 Business) - Eugene
Effective October 3, 2011, the I-5 northbound Exit 192 off-ramp to OR99/OR126 Business will be closed. Estimated date of re-opening is January 1, 2014.
I-5 MP 195.00 to MP 195.46 NB & SB (Eugene)
Effective April 9, 2013, this section of I-5 will be restricted to 17 feet 00 in. in width and 16 feet 03 in. in height on Monday - Thursday nights between the hours of 7 PM & 6:30 AM. Estimated date of completion is November 30, 2014.
I-5 SB Exit 233 off-ramp to US20 (Albany)
Effective April 25, 2013, the ramp from I-5 southbound Exit 233 to US20 will be intermittently closed on Monday - Thursday nights between the hours of 8 PM & 6 AM. Estimated date of completion is June 14, 2013.
I-5 MP 295 to MP 299 SB
Effective May 13, 2011, this section of I-5 will be restricted to 12 feet 00 in. in width and 15 feet 00 in. in height between the hours of 10 PM & 5 AM (NIGHTTIME). In addition, the on-ramp from OR43/Hood St to SB I-5 will be intermittently closed during the same times. Estimated date of completion is December 31, 2013.
I-5 MP 295 to MP 299 NB
Effective May 13, 2011, this section of I-5 will be restricted to 12 feet 00 in. in width and 14 feet 10 in. in height between the hours of 10 PM & 5 AM (NIGHTTIME). In addition, the on-ramps from Multnomah Blvd, Terwilliger Blvd & OR99W/Barbur Blvd to NB I-5 will be intermittently closed during the same times. Estimated date of completion is December 31, 2013.
Effective June 24, 2013, this section of I-5 southbound will be restricted to 15 feet 00 in. in height between the hours of 9 PM & 5:30 AM. Estimated date of completion is June 30, 2013.
I-5 NB Exit 300 to I-84 EB (Portland)
Effective May 28, 2013, the ramp from I-5 northbound Exit 300 to I-84 eastbound will be restricted to 14 feet 00 in. in width between the hours of 8 PM & 5 AM. Estimated date of completion is June 3, 2013.
I-5 SB Exit 300B to Morrison Bridge (Portland)
Effective May 28, 2013, the ramp from I-5 SB Exit 300B to the Morrison Bridge will be closed between the hours of 8 PM & 5 AM. Estimated date of completion is June 3, 2013.
I-5 SB Exit 301 ramp to I-84 EB (Portland)
Effective May 28, 2013, I-5 southbound Exit 301 ramp to I-84 eastbound will be intermittently closed between the hours of 8 PM & 5 AM. Estimated date of completion is June 3, 2013.
I-84 WB ramp to I-5 NB (Portland)
Effective May 28, 2013, the ramp from I-84 westbound to I-5 northbound will be intermittently closed between the hours of 8 PM & 5 AM. Estimated date of completion is June 3, 2013.
I-84 MP 0.01 to MP 5.80 EB & WB (Portland)
Effective March 27, 2013, this section of I-84 will be restricted to 14 feet 00 in. in width between the hours of 10 PM & 5 AM (NIGHTTIME). In addition, the height will be restricted to 15 ft 07 in. in height eastbound, and 14 ft 11 in. in height westbound during the same time. Estimated date of completion is September 30, 2013.
I-84 EB MP 0 to MP 5.80 (Portland)
Effective July 12, 2013 at 10 PM, this section of I-84 eastbound will be closed. Estimated date of re-opening is July 15, 2013 at 5 AM.
I-84 WB MP 5.80 to MP 0 (Portland)
Effective July 19, 2013 at 10 PM, this section of I-84 westbound will be closed. Estimated date of re-opening is July 22, 2013 at 5 AM. In addition, effective August 3, 2013 at 11 PM, this section of I-84 westbound will be closed. Estimated date of re-opening is August 5, 2013 at 5 AM.
I-84 WB ramp to I-5 SB (Portland).
Effective May 28, 2013, the ramp from I-84 westbound to I-5 southbound will be restricted to 14 feet 00 in. in width between the hours of 8 PM & 5 AM. Estimated date of completion is June 3, 2013.
I-84 MP 5.42 to MP 6.60 EB (Portland)
Effective April 29, 2013, this section of I-84 eastbound will be restricted to 12 feet 00 in. in width, and 18 feet 00 in. in height on Sunday - Thursday nights between the hours of 10 PM & 5 AM (NIGHTTIME). In addition, the ramp from I-84 eastbound Exit 7 to Halsey St will be intermittently closed during the same hours. Estimated date of completion is November 5, 2013.
I-84 WB on-ramp from NB 181st Ave (Gresham)
Effective June 23, 2013, the ramp from NB 181st Ave to I-84 westbound will be closed between the hours of 5 AM & 3 PM (DAYTIME). Estimated date of completion is June 23, 2013.
I-84 MP 17.31 to MP 18.20 EB & WB
Effective May 1, 2010, this section of I-84 will be restricted to 16 feet 00 in. in width between the hours of 9 PM & 7 AM. Estimated date of completion is November 30, 2014.
I-84 MP 17.82 EB & WB (Jordan Rd Underpass)
Effective September 1, 2010, the Jordan Rd underpass at Exit 18 will be restricted to 13 feet 00 in. in width. This restriction is NOT on the I-84 mainline. Effective April 15, 2013, the height will be restricted to 14 feet 9 inches crossing under I-84 on Jordan Rd. Estimated date of completion is November 1, 2014.
I-84 MP 36.75 to MP 39 EB & WB
Effective September 6, 2012, this section of I-84 is restricted to 19 feet 00 in. in width Monday-Friday between the hours of 7:30 AM & 5:30 PM. Estimated date of completion is October 1, 2013.
I-84 MP 41 to MP 42 EB (West of Cascade Locks) -- NEW --
Effective April 10, 2013, this section of I-84 eastbound will be restricted to 14 feet 00 in. in width. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 in. in width. Estimated date of completion is May 23, 2013.
I-84 MP 41.5 to MP 42.5 WB (West of Cascade Locks)
Effective April 11, 2013, this section of I-84 westbound will be restricted to 14 feet 00 in. in width. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 in. in width. Estimated date of completion is May 23, 2013.
I-84 MP 95.80 to MP 96.24 EB & WB (Celilo) -- NEW --
Effective May 13, 2013, this section of I-84 will be restricted to 14 feet 00 in. in width between the hours of 6 AM & 7 PM (DAYTIME). Estimated date of completion is May 22, 2013.
I-84 MP 99.60 to MP 100.00 EB & WB (East of Celilo) -- NEW --
Effective May 13, 2013, this section of I-84 will be restricted to 14 feet 00 in. in width between the hours of 6 AM & 7 PM (DAYTIME). Estimated date of completion is May 22, 2013.
I-84 MP 137.92 EB & WB (Arlington)
Effective July 15, 2013, this section of I-84 will be restricted to 12 feet 00 in. in width on Monday - Thursday between the hours of 6 AM & 5 PM (DAYTIME). No restrictions will be in place from 5 PM on Thursday until 6 AM on Monday. Estimated date of completion is July 25, 2013.
I-84 Exit 228 on/off ramps WB (Deadman Pass)
Effective June 13, 2013, the ramps to/from I-84 westbound Exit 228 will be closed between the hours of 6 AM & 5 PM (DAYTIME). Estimated date of completion is June 13, 2013.
I-84 Exit 228 on/off ramps EB (Deadman Pass)
Effective June 12, 2013, the ramps to/from I-84 eastbound Exit 228 will be closed between the hours of 6 AM & 5 PM (DAYTIME). Estimated date of completion is June 12, 2013.
I-84 MP 260.7 to MP 248.0 WB (west of La Grande) -- NEW --
Effective May 20, 2013, this section of I-84 westbound will be restricted to 15 feet 00 in.
in width. Mobile homes with eaves allowed provided the base width does not exceed 15 feet 00 in.
Estimated date of completion is November 1, 2013.
I-84 MP 248.0 to MP 260.7 EB (west of La Grande) -- NEW --
Effective May 20, 2013, this section of I-84 eastbound will be restricted to 13 feet 00 in. in width. Mobile homes with eaves allowed provided the base width does not exceed 13 feet 00 in.
Estimated date of completion is November 1, 2013.
I-84 MP 256.4 EB & WB (west of La Grande)
Effective May 20, 2013, this section of I-84 eastbound and westbound will be restricted to 16 feet 06 in. in height. Estimated date of completion is November 1, 2013.
Effective March 19, 2013, this section of I-84 will be restricted to 12 feet 00 in. in width between the hours of 6 PM & 6 AM. In addition, this section of I-84 will be restricted to 16 feet 00 in. in width between the hours of 6 AM & 6 PM. Estimated date of completion is October 31, 2013.
I-84 MP 371.45 EB & WB crossing under Stanton Blvd (west of Ontario)
Effective March 19, 2013, this section of I-84 will be restricted to 16 feet 09 in. in height. Estimated date of completion is October 31, 2013.
I-84 MP 373.08 EB & WB crossing under Chester Blvd (west of Ontario)
Effective March 19, 2013, this section of I-84 will be restricted to 16 feet 04 in. in height. Estimated date of completion is October 31, 2013.
I-205 MP 20.00 to MP 20.50 NB (Portland)
Effective May 1, 2013, this section of I-205 northbound will be restricted to 19 feet 00 in. in width, and 18 feet 03 in. in height between the hours of 9 PM & 5 AM (NIGHTTIME). Estimated date of completion is June 30, 2013.
I-205 NB on-ramp from Airport Way (Portland)
Effective April 1, 2013, the ramp from Airport Way to I-205 northbound will be restricted to 16 feet 00 in. in width, and 18 feet 03 in. in height between the hours of 7 PM & 2 PM. No restrictions will be in place between 2 PM & 7 PM. Estimated date of completion is December 31, 2013.
I-405 SB on-ramp from SW 5th St (Portland)
Effective June 28, 2013, the ramp from SW 5th St to I-405 southbound will be closed. Estimated date of completion is July 1, 2013.
Effective May 29, 2013, this section of US20 will be restricted to 16 feet 00 in. in width between the hours of 8 PM & 4 AM. Estimated date of completion is May 31, 2013.
US20 MP 13.08 to MP 13.39 EB (Lebanon)
Effective May 31, 2013, this section of US20 eastbound (between Rose St & Maple St) will be closed between the hours of 2:30 PM & 3:30 PM (DAYTIME). Estimated date of completion is May 31, 2013.
US20 MP 13.08 to MP 15.18 EB & WB (Lebanon)
Effective June 1, 2013, this section of US20 will be restricted to 8 feet 06 in. in width (LEGAL WIDTH) between the hours of 10:30 AM & 1 PM (DAYTIME). Estimated date of completion is June 1, 2013.
US26 MP 1.40 to MP 3.81 EB & WB (Portland)
Effective at 8 PM on May 17, 2013, this section of US26 will be restricted to 14 feet 00 in. in width & 15 feet 09 in. in height. Effective at 10 PM on May 17, 2013, the highway will be closed to all traffic between SE 13th Ave & SE 21st Ave. Estimated date of re-opening is 5 AM May 20, 2013.
US26 WB on-ramp from NB 17th Ave - Portland
Effective June 15, 2012, the ramp from northbound SE 17th Ave to US26 westbound will be closed. Estimated date of re-opening is September 1, 2013.
US26 MP 7.8 to MP 9.7 EB & WB (Portland)
Effective June 5, 2013, this section of US26 will be restricted to 14 feet 00 in. in width. Mobile homes with eaves allowed provided the base width does not exceed 14 feet 00 in. Estimated date of completion is July 7, 2013.
US26 MP 19.40 EB & WB (Prineville)
Effective June 3, 2013, this section of US26 will be restricted to 14 feet 00 in. in width between the hours of 6 AM & 5 PM (DAYTIME). Estimated date of completion is June 13, 2013.
Effective June 1, 2013, this section of US26 will be intermittently closed between the hours of 9 PM & 5 AM. When closed, traffic will be directed to take Glencoe Rd Exit 57 and re-enter US26. Estimated date of completion is July 31, 2013.
Effective June 8, 2013, the on- and off-ramps to/from US26 Exit 61 to Helvetia Rd / Brookwood Pkwy will be closed between the hours of 7:30 AM & 1 PM. In addition, Brookwood Pkwy over US26 will be closed during the same time. These closures are NOT on the US26 mainline. Estimated date of completion is June 8, 2013.
US26 MP 70 to MP 74 EB & WB (Portland)
Effective July 5, 2012, this section of US26 will be restricted to 14 feet 00 in. in width between the hours of 10 PM & 5 AM. In addition, the height will be restricted to 17 feet 03. in. going eastbound and 17 feet 07. in. going westbound during the same time. Estimated date of completion is May 31, 2013.
US26 EB on-ramp from Skyline Blvd (Portland)
Effective July 5, 2012, the US26 EB on-ramp from Skyline Blvd will be intermittently closed between the hours of 10 PM & 5 AM. Estimated date of completion is May 31, 2013.
Effective July 5, 2012, the on/off ramps to/from the Zoo/Forestry Center will be intermittently closed between the hours of 10 PM & 5 AM. Estimated date of completion is May 31, 2013.
US26 EB off-ramp to Canyon Rd (Portland)
Effective July 5, 2012, the US26 eastbound off-ramp to Canyon Rd will be intermittently closed between the hours of 10 PM & 5 AM. Estimated date of completion is May 31, 2013.
US26 WB on-ramp from Jefferson St (Portland)
Effective July 5, 2012, the on-ramp from Jefferson St to US26 west will be intermittently closed between the hours of 10 PM & 5 AM. Estimated date of completion is May 31, 2013.
US26 EB off-ramps to I-405 North/South
Effective July 5, 2012, the off ramps from US26 east to I-405 north/south will be intermittently closed between the hours of 10 PM & 5 AM. Estimated date of completion is May 31, 2013.
US26 WB on-ramps from I-405 North/South
Effective July 5, 2012, the US26 westbound on ramps from I-405 north/south will be intermittently closed between the hours of 10 PM & 5 AM. Estimated date of completion is May 31, 2013.
US26 WB on-ramp from Clay St (Portland)
Effective July 5, 2012, the on-ramp from Clay St to US26 west will be intermittently closed between the hours of 10 PM & 5 AM. Estimated date of completion is May 31, 2013.
US26 EB off-ramp to Market St (Portland)
Effective July 5, 2012, the US26 eastbound off-ramp to Market St will be intermittently closed between the hours of 10 PM & 5 AM. Estimated date of completion is May 31, 2013.
US26 MP 85.25 EB & WB (Warm Springs)
Effective June 17, 2013, this section of US26 will be restricted to 16 feet 00 in. in width between the hours of 6 AM & 5 PM (DAYTIME). Estimated date of completion is June 21, 2013.
US26 MP 92.68 EB & WB (Warm Springs)
Effective June 3, 2013, this section of US26 will be restricted to 16 feet 00 in. in width on Monday - Thursday between the hours of 6 AM & 6 PM (DAYTIME). Estimated date of completion is June 13, 2013.
US26 MP 105.26 WB (Warm Springs)
Effective July 29, 2013, this section of US26 westbound will be restricted to 16 feet 00 in. in width between the hours of 6 AM & 5 PM (DAYTIME). Estimated date of completion is August 16, 2013.
US26 MP 116.35 to MP 116.75 EB & WB (Madras)
Effective May 20, 2013, this section of US26 will be restricted to 14 feet 00 in. in width between the hours of 6 AM & 7 PM (DAYTIME). Estimated date of completion is May 24, 2013.
US26 MP 277.89 to MP 277.97 EB & WB (Vale)
Effective May 13, 2013, this section of US26 will be closed. Estimated date of compleion is May 17, 2013.
Effective July 29, 2013, US30 Bypass at the St Johns Bridge will be closed between the hours of 8 PM & 5 AM. Estimated date of completion is August 8, 2013.
US30 MP 48.67 - Rainier-Longview Bridge (State of Washington Jurisdiction)
The bridge is currently restricted to 16 feet 05 in. in height seven days a week at all hours until fall of 2013. Contact the State of Washington at (360) 704-6340 for current information regarding size restrictions for this bridge.
US97 MP 0.39 NB & SB (south of Biggs Jct)
Effective May 20, 2013, this section of US97 will be restricted to 16 feet 00 in. in width between the hours of 6 AM & 5 PM (DAYTIME). Estimated date of completion is May 24, 2013.
US97 Business (3rd St) at railroad crossing south of US20 (Bend)
Effective June 17, 2013, US97 Business (3rd St) at the railroad crossing south of US20 will be closed between the hours of 7 PM & 7 AM. Estimated date of completion is August 31, 2013.
US97 MP 113.94 NB & SB (Terrebonne)
Effective June 3, 2013, this section of US97 will be restricted to 17 feet 00 in. in width on Monday - Thursday between the hours of 6 AM & 5 PM (DAYTIME). Estimated date of completion is June 13, 2013.
US97 NB Exit 135B ramp to Empire Blvd (Bend)
Effective May 28, 2013, the ramp from US97 northbound Exit 135B to Empire Blvd will be closed between the hours of 7 PM & 7 AM. Estimated date of completion is May 29, 2013.
US97 MP 201.9 to MP 202.3 NB & SB (Chemult)
Effective May 27, 2013, this section of US97 will be restricted to 19 feet 00 in. in width between the hours of 6 AM & 7 PM (DAYTIME). Estimated date of completion is May 31, 2013.
US101 MP 339.02 to MP 339.50 NB & SB
Effective December 12, 2012, this section of US101 will be restricted to 17 feet 00 in. in height. Estimated date of completion is December 30, 2013.
US101 MP 339.02 to MP 339.50 NB & SB -- NEW --
Effective December 26, 2012, this section of US101 will be restricted to 16 feet 00 in. in width. Estimated date of completion is June 16, 2013.
US101 MP 339.02 to MP 339.50 NB & SB -- NEW --
Effective August 18, 2013, this section of US101 will be restricted to 14 feet 00 in. in width. Mobile units with eaves are allowed provided the base width does not exceed 14 feet 00 in. in width. Estimated date of completion is December 30, 2013.
US101 MP 339.02 to MP 339.50 NB & SB -- NEW --
Effective June 17, 2013, this section of US101 will be restricted to 11 feet 00 in. in width. Estimated date of completion is August 17, 2013.
US197 MP 0.76 NB & SB (The Dalles)
Effective May 28, 2013, this section of US197 will be restricted to 12 feet 00 in. in width between the hours of 6 AM & 5 PM (DAYTIME). Estimated date of completion is May 31, 2013.
US197 MP 13.35 NB & SB (Dufur)
Effective June 24, 2013, this section of US197 will be restricted to 12 feet 00 in. in width between the hours of 6 AM & 6 PM (DAYTIME). Estimated date of completion is June 28, 2013.
US197 MP 14.46 NB & SB (Dufur)
Effective June 24, 2013, this section of US197 will be restricted to 13 feet 00 in. in width between the hours of 6 AM & 5 PM (DAYTIME). Estimated date of completion is June 28, 2013.
US197 MP 45.84 NB & SB(Deschutes River Bridge - Maupin)
Effective May 13, 2013, this section of US197 will be restricted to 8 feet 06 in. in width (LEGAL WIDTH) between the hours of 7 AM & 5 PM (DAYTIME). Estimated date of completion is May 17, 2013.
OR Routes
OR6 MP 39.00 to MP 51.62 EB & WB (Banks)
Effective April 24, 2013, this section of OR6 will be restricted to 14 feet 00 in. in width between the hours of 7 AM & 7 PM (DAYTIME). Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 in. Estimated date of completion is June 15, 2013.
OR6 MP 48.79 to MP 49.10 WB (Banks)
Effective April 24, 2013, this section of OR6 westbound will be intermittently closed (for up to one day) on Monday - Friday between the hours of 7 AM & 6 PM. In addition, the ramps to and from OR47 will be closed at the same time. OR6 eastbound will remain open during this time. Estimated date of completion is May 1, 2013.
OR6 MP 49.09 to MP 49.40 EB (Banks)
Effective April 24, 2013, this section of OR6 eastbound will be intermittently closed (for up to one day) on Monday - Friday between the hours of 7 AM & 6 PM. In addition, the ramps to and from OR47 will be closed at the same time. OR6 westbound will remain open during this time. Estimated date of completion is May 1, 2013.
OR6 EB ramp to OR47 SB (Banks)
Effective April 24, 2013, the ramp from OR6 eastbound to OR47 southbound will be restricted to 14 feet 08 in. in height on Monday - Friday between the hours of 7 AM & 6 PM (DAYTIME). Estimated date of completion is May 1, 2013.
OR6 WB ramp from US26 EB (Banks)
Effective April 24, 2013, the ramp from US26 eastbound to OR6 westbound will be intermittently closed (for up to two nights) on Monday - Thursday nights between the hours of 7 PM & 5 AM. Estimated date of completion is May 1, 2013.
OR6 EB ramp to US26 EB (Banks)
Effective April 24, 2013, the ramp from OR6 eastbound to US26 eastbound will be intermittently closed (for up to two nights) on Monday - Thursday nights between the hours of 7 PM & 5 AM. Estimated date of completion is May 1, 2013.
OR6 WB ramp from US26 WB (Banks)
Effective April 24, 2013, the ramp from US26 westbound to OR6 westbound will be intermittently closed (for up to two nights) on Monday - Thursday nights between the hours of 7 PM & 5 AM. Estimated date of completion is May 1, 2013.
OR8 MP 11.28 to MP 14.66 EB & WB (Hillsboro)
Effective June 1, 2013, this section of OR8 will be restricted to 10 feet 00 in. in width between the hours of 6 PM & 6 AM, and 14 feet 00 in. in width between the hours of 9 AM & 3 PM. Estimated date of completion is September 30, 2013.
OR18 Business MP 7.31 to MP 7.53 (Sheridan)
Effective June 21, 2013, this section of OR18 Business will be closed between the hours of 5 PM & 7 PM (DAYTIME). Estimated date of completion is June 22, 2013.
OR22 EB MP 1.28 to MP 2.63 (east of Salem)
Effective March 18, 2013, this section of OR22 eastbound will be restricted to 16 feet 00 in. in width, and 14 feet 07 in. in height during the following times: Monday-Thursday from 12:01 AM to 3 PM, and from 6 PM to midnight; Friday from 12:01 AM to 3 PM. Estimated date of completion is November 15, 2013.
OR22 WB MP 2.63 to MP 1.28 (east of Salem)
Effective March 18, 2013, this section of OR22 westbound will be restricted to 16 feet 00 in. in width, and 14 feet 09 in. in height. Estimated date of completion is November 15, 2013.
OR22 WB Exit 2 off-ramp to Lancaster Dr (Salem)
Effective May 20, 2013, the ramp from OR22 westbound Exit 2 to Lancaster Dr will be restricted to 15 feet 00 in. in width. Mobile homes with eaves are allowed, provided the base width does not exceed 15 feet 00 in. Estimated date of completion is June 4, 2013.
OR22 WB Exit 2 off-ramp to Lancaster Dr (Salem) -- NEW --
Effective June 4, 2013, the ramp from OR22 westbound Exit 2 to Lancaster Dr will be closed. Estimated date of completion is June 7, 2013.
OR22 MP 25.96 WB (Marion St Bridge - Salem)
Effective May 28, 2013, this section of OR22 westbound (Marion St Bridge) will be restricted to 10 feet 00 in. in width between the hours of 9:30 PM & 5 AM (NIGHTTIME). Estimated date of completion is May 29, 2013.
OR22 EB ramp to OR22 / OR99E Business EB (Salem)
Effective June 3, 2013, the ramp from OR22 eastbound to OR22 / OR99E Business eastbound will be closed between the hours of 9 PM & 5 AM. Estimated date of completion is June 4, 2013.
OR38 MP 17.79 to MP 18.20 EB & WB (Scottsburg)
Effective May 13, 2013, this section of OR38 will be restricted to 16 feet 00 in. in width. Estimated date of completion is July 1, 2013.
OR47 MP 37.8 to MP 38.1 NB & SB (Carlton)
Effective June 22, 2013, this section of OR47 will be closed between the hours of 10 AM & 11:30 AM (DAYTIME). Estimated date of completion is June 22, 2013.
OR47 NB & SB ramp to OR6 WB (Banks)
Effective April 24, 2013, the ramp from OR47 northbound and southbound to OR6 westbound will be intermittently closed (for up to one day) on Monday - Friday between the hours of 7 AM & 6 PM. Estimated date of completion is May 1, 2013.
OR51 MP 0 to MP 2.35 EB & WB (Monmouth-Independence)
Effective July 4, 2013, this section of OR51 will be closed between the hours of 12 PM & 3 PM (DAYTIME). Estimated date of completion is July 4, 2013.
OR58 MP 56 to MP 59 EB & WB (Salt Creek Tunnel)
Effective April 17, 2013, this section of OR58 at the Salt Creek Tunnel will be CLOSED to all traffic in both directions at night Monday-Thursday nights between the hours of 8 PM & 6 AM. In addition, this section of highway will be restricted to 8 feet 06 in. in width (LEGAL WIDTH) and 14 feet 00 in. in height (LEGAL HEIGHT) at all times (day or night) when the highway is open (including Friday / Saturday / Sunday). Estimated date of completion is October 15, 2013.
OR99W/Naito Parkway NB on-ramp from US26/Kelly Ave
Effective January 14, 2013, the OR99W/Natio Parkway northbound on-ramp from US26/Kelly Ave will be restricted to 10 feet 00 in. in width. Estimated date of completion is September 3, 2013.
OR99E MP 1.2 to MP 1.5 NB & SB (Portland)
Effective June 3, 2013, this section of OR99E will be restricted to 16 feet 00 in. in width between the hours of 9 AM & 3 PM (DAYTIME). In addition, the height will be restricted to 16 feet 03 in. in height northbound during the same time. Estimated date of completion is July 31, 2013.
OR99W MP 3.10 to MP 3.25 NB (Barbur Blvd)
Effective August 24, 2010, this section of OR99W will be restricted to 14 feet 00 in. in width between the hours of 9 AM & 4 PM. Mobile homes with eaves are allowed. In addition, the height will be restricted to 17 feet 00 in. in height at the same time. Estimated date of completion is December 31, 2013.
OR99W MP 12.03 to MP 16.68 NB & SB (Tualatin)
Effective April 15, 2013, this section of OR99W will be restricted to 10 feet 00 in. in width between the hours of 8 PM & 6 AM. Estimated date of completion is September 30, 2013.
OR99W MP 12.20 SB (Tualatin River Bridge - Tualatin)
Effective May 27, 2013, this section of OR99W southbound will be restricted to 9 feet 00 in. in width between the hours of 8 PM & 6 AM. Estimated date of completion is May 31, 2013.
OR99E MP 12.00 to MP 20.63 NB & SB (Oregon City - Canby)
Effective May 20, 2013, this section of OR99E will be restricted to 14 feet 00 in. in width between the hours of 5 AM & 9:30 PM; & 10 feet 00 in. in width between the hours of 9:30 PM and 5 AM. In addition, the height will be restricted to 14 feet 00 in. in height at all hours. Estimated date of completion is July 31, 2013.
OR99E MP 12.00 to MP 20.63 NB & SB (Oregon City - Canby)
Effective May 20, 2013, this section of OR99E will be restricted to 14 feet 00 in. in width between the hours of 5 AM & 9:30 PM; & 10 feet 00 in. in width between the hours of 9:30 PM and 5 AM. In addition, the height will be restricted to 14 feet 00 in. in height at all hours. Estimated date of completion is July 31, 2013.
OR99 MP 14.65 to MP 14.79 SB (Cottage Grove)
Effective April 22, 2013, this section of OR99 southbound will be closed on Monday - Friday nights between the hours of 10 PM & 7 AM. In addition, effective May 6, 2013, this section of OR99 southbound will be closed at all hours. Estimated date of completion is June 30, 2013.
OR99 MP 14.79 to MP 14.65 NB (Cottage Grove)
Effective April 22, 2013, this section of OR99 northbound will be closed. Estimated date of completion is June 30, 2013.
OR99 MP 108.76 to MP 109.76 NB & SB (Junction City)
Effective June 1, 2013, this section of OR99 will be closed between the hours of 4 PM & 11 PM. Estimated date of completion is June 1, 2013.
OR126 Business MP 0.18 to MP 0.19 EB & WB (crossing under I-5 in Eugene)
Effective February 4, 2013, this section of OR126 Business (Franklin Blvd) will be restricted to 16 feet 02 in. in height. Estimated date of completion is July 1, 2013.
OR126 MP 17.8 to MP 18.2 EB & WB (Prineville)
Effective May 20, 2013, this section of OR126 will be restricted to 20 feet 00 in. in width between the hours of 6 AM & 7 PM (DAYTIME). Estimated date of completion is May 24, 2013.
OR194 MP 7.17 to MP 7.56 (Main St in Monmouth)
Effective July 4, 2013, this section of OR194 will be closed between the hours of 12 PM & 3 PM (DAYTIME). Estimated date of completion is July 4, 2013.
OR202 MP 23.65 NB & SB (west of Jewell)
Effective May 20, 2013, this section of OR202 will be restricted to 12 feet 00 in. in width. Estimated date of completion is June 30, 2013.
OR211 MP 4.80 to MP 5.10 EB & WB (Sandy)
Effective April 15, 2013, this section of OR211 will be restricted to 16 feet 00 in. in width from 1/2 hr after sunset to 1/2 hr before sunrise (NIGHTTIME). In addition, effective April 26, 2013, this section of OR211 will be restricted to 19 feet 00 in. in width from 1/2 hr after sunset to 1/2 hr before sunrise (NIGHTTIME). Estimated date of completion is May 15, 2013.
OR213 MP 0 to MP 1.00 NB & SB (Oregon City)
Effective September 23, 2011, this section of OR213 will be restricted to 14 feet 00 in. in width between the hours of 8 PM & 5:30 AM. Mobile homes with eaves are allowed. In addition, OR213 crossing under Holcomb Blvd will be restricted to 19 feet 00 in. in height northbound and 17 feet 00 in. in height southbound during the same times. Estimated date of completion is May 31, 2013.
OR213 MP 23.8 to MP 24.5 NB & SB (north of Silverton)
Effective May 15, 2013, this section of OR213 will be restricted to 14 feet 00 in. in width. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 in. Estimated date of completion is June 29, 2013.
OR216 MP 8.30 EB & WB (Sherar's Bridge)
Effective July 1, 2013, this section of OR216 will be restricted to 12 feet 00 in. in width between the hours of 6 AM & 5 PM (DAYTIME). Estimated date of completion is July 3, 2013.
OR217 MP 0 to MP 7.5 NB & SB
Effective February 25, 2013, OR217 will be restricted to 13 feet 00 in. in width between the hours of 9:30 PM & 5 AM. In addition, the height will be restricted to 15 feet 11 in. going northbound and 15 feet 07 in. going southbound between the hours of 8 PM & 5 AM. Estimated date of completion is December 31, 2013.
OR217 MP 0.00 to MP 1.48 NB & SB (Beaverton)
Effective April 25, 2013, this section of OR217 will be restricted to 16 feet 00 in. in width between the hours of 9:30 PM & 5:30 AM (NIGHTTIME). In addition, the following ramps will be closed during the same time: ramp from Walker Rd to OR217 SB; ramp from Wilshire Rd to OR217 SB; SB OR217 Exit 1 to Walker Rd; ramp from Barnes Rd to OR217 SB; SB OR217 Exit 2A to Canyon Rd (OR8); ramp from Canyon Rd (OR8) to OR217 NB; ramp from Park Way / Baltic Rd to US26 EB; ramp from OR217 NB to Walker Rd; ramp from Walker Rd to OR217 NB; OR217 NB ramp to Wilshire Rd; OR217 NB ramp to Barnes Rd EB. Estimated date of completion is May 31, 2013.
OR217 MP 1.31 to MP 1.99 NB & SB (Beaverton)
Effective May 13, 2013, this section of OR217 will be intermittently closed between the hours of 11 PM & 5 AM (NIGHTTIME). When closed, traffic should take Exit 2A and re-enter OR217. Estimated date of completion is August 30, 2013.
OR224 MP 0 to MP 1.05 EB & WB (Milwaukie)
Effective February 4, 2013, this section of OR224 will be restricted to 14 feet 00 in. in width between the hours of 9 AM and 3 PM (DAYTIME). Estimated date of completion is November 15, 2013.
OR224 MP 2.20 to MP 4.20 EB & WB (Milwaukie)
Effective April 18, 2013, this section of OR224 will be restricted to 16 feet 06 in. in height on Monday - Friday between the hours of 7 PM & 5:30 AM. Estimated date of completion is July 31, 2013.
OR569 EB on-ramp from River Rd (Eugene)
Effective May 17, 2013, the on-ramp from River Rd to OR569 eastbound will be closed between the hours of 8 PM & 6 AM. Estimated date of completion is May 18, 2013.
OR569 WB on-ramp from SB Delta Hwy / WB Green Acres Rd (Eugene)
Effective May 16, 2013, the on-ramp from southbound Delta Hwy / westbound Green Acres Rd to OR569 westbound will be closed between the hours of 8 PM & 6 AM. Estimated date of completion is May 17, 2013.
OR569 MP 12 to MP 13 EB & WB (Eugene)
Effective April 9, 2013, this section of OR569 will be restricted to 14 feet 00 in. in width on Monday - Thursday nights between the hours of 7 PM & 6:30 AM. In addition, the height will be restricted to 19 feet 01 in. in height eastbound, and 18 feet 09 in. in height westbound during the same time. Estimated date of completion is November 30, 2014.
OR569 WB ramp to I-5 SB (Eugene)
Effective May 20, 2013, the ramp from OR569 westbound to I-5 southbound will be intermittently closed on weeknights (Monday-Friday) between the hours of 8 PM & 5:30 AM. Estimated date of completion is November 30, 2014.
OR569 EB ramp to I-5 NB (Eugene)
Effective May 20, 2013, the ramp from OR569 eastbound to I-5 northbound will be intermittently closed on weeknights (Monday-Friday) between the hours of 8 PM & 5:30 AM. Estimated date of completion is November 30, 2014.
Lifted Restrictions
I-5 MP 69.71 to MP 70.41 NB (Sunny Valley)
Effective May 11, 2013, this section of I-5 northbound will be restricted to 14 feet 00 in. in width. Estimated date of completion is May 17, 2013.
I-84 MP 84.50 to MP 85.00 EB & WB (The Dalles)
Effective May 6, 2013, this section of I-84 will be restricted to 16 feet 00 in. in width between the hours of 6 AM & 7 PM (DAYTIME). Estimated date of completion is May 10, 2013.
I-84 MP 87.20 to MP 87.70 EB & WB (The Dalles)
Effective May 6, 2013, this section of I-84 will be restricted to 14 feet 00 in. in width between the hours of 6 AM & 7 PM (DAYTIME). Estimated date of completion is May 10, 2013.
US26 Exit 59 EB & WB on/off ramps to Jackson School Rd (North Plains)
Effective May 11, 2013, the on- and off-ramps to/from US26 Exit 59 to Jackson School Rd will be closed between the hours of 7:30 AM & 1 PM. In addition, Jackson School Rd over US26 will be closed during the same time. These closures are NOT on the US26 mainline. Estimated date of completion is May 11, 2013.
Effective May 10, 2013, this section of US26 will be restricted to 11 feet 00 in. in width between the hours of 9 PM & 5 AM (NIGHTTIME). In addition, the ramp from Market St to US26 westbound will be closed at the same time. Estimated date of completion is May 11, 2013.
US101 MP 189.0 to MP 190.6 NB & SB (Florence)
Effective May 19, 2013, this section of US101 will be restricted to 8 feet 06 in. in width (LEGAL WIDTH) between thr hours of 11 AM & 3 PM (DAYTIME). Estimated date of completion is May 19, 2013.
OR22 / OR99E Business NB ramp to OR22 WB (to Marion St Bridge - Salem)
Effective April 22, 2013, the ramp from OR22 / OR99E Business northbound to OR22 westbound (to Marion St Bridge) will be closed between the hours of 9 PM & 5 AM (NIGHTTIME). Estimated date of completion is May 7, 2013.
OR22 MP 5.67 to MP 6.17 EB & WB (east of Salem)
Effective May 15, 2013, this section of OR22 will be restricted to 16 feet 00 in. in width between the hours of 8 AM & 4 PM (DAYTIME). In addition, the height will be restricted to 15 feet 02 in. in height westbound during the same time. Estimated date of completion is May 17, 2013.
OR214 MP 49.5 to MP 50.4 NB & SB (Silverton)
Effective May 18, 2013, this section of OR214 will be closed between the hours of 9:45 AM & 11 AM (DAYTIME). Estimated date of completion is May 18, 2013.
BRIDGE RESTRICTIONS
Interstate Routes
I-5 MP 104.85 Chadwick Ln crossing over I-5
MP 104.85 Chadwick Lane crossing over I-5 (near Riddle) 20,000 single axle, 34,000 lbs. tandem axle - 80,000 lbs. GVW. Weight Table 1
I-84 MP 17.68 WB (Sandy River Bridge)
I-84 MP 17.68 WB only Sandy River Bridge is restricted to STP's beyond Wt. Table 5.
I-84 Upper Perry Interchange Overcrossing
MP 256.42 Upper Perry Interchange in Perry 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW. Weight Table 2 for Divisible loads 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW. Weight Table 3 for Non-Divisible loads
U.S. Routes
US20 (Corvallis-Newport Hwy) MP 23.38
Effective May 19, 2006 at MP 23.38 Yaquina River Bridge near Eddyville is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW. Weight Table 2 for Divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW. Weight Table 3 for Non-Divisible loads. Vehicles exceeding these weights may cross the bridge if they straddle the centerline, do not exceed 25 MPH and are the only vehicle on the bridge. Certified flaggers are required to stop traffic.
US30 MP 0.03 Historic Columbia River Highway
Historic US30 MP 0.03 Sandy River Bridge is restricted to 30 tons Gross.
US30 (Huntington Hwy) MP 0.46
Effective June 16, 2011, the Burnt River Bridge on US30 at MP 0.46 in Lime just off I-84 is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW. Weight Table 2 for Divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW. Weight Table 3 for Non-Divisible loads.
US30 (Huntington Hwy) MP 2.75
Effective September 11, 2003 at MP 2.75 Burnt River Bridge (2.75 miles south of the I-84)is restricted to 20,000 single axle, 34,000 lbs. tandem axle - 80,000 lbs. GVW. Weight Table 1
US30 MP 13.14 Historic Columbia River Highway
Historic US30 MP13.14 Youngs Creek (Shepperds Dell) Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, Wt. Table 1.
US30 MP 17.68 Historic Columbia River Highway (W Multnomah Falls Bridge)
Historic US30 MP 17.68 West Multnomah Falls Bridge is restricted to 28,000 lbs. for solo vehicles, 44,000 lbs. for 3-2 combinations, and 56,000 lbs. for 3-3 combinations.
US30 MP 20.39 Historic Columbia River Highway
Historic US30 MP 20.39 Horsetail Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, Wt. Table 1.
US30 Historic Columbia River Hwy (Bridge of the Gods)
US30 Historic Columbia River Hwy at MP 30.42 Bridge of the Gods is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 60,000 lbs. GVW; Weight Table 1. Trucks up to 80,000 lbs GVW allowed Monday - Friday between 8 AM & 3PM. This bridge belongs to the Port of Cascade Locks.
US30 OR/WA Border at Rainier (Lewis & Clark Bridge)
This bridge belongs to Washington State. Restricted to 21,500 lbs. per axle. No gross weight restriction.
US101 Business MP 4.78 (Lewis & Clark River Bridge)
Drawbridge crossing Lewis & Clark River (2.5 miles south of Astoria) is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 80,000 lbs. GVW. Weight Table 1.
US101 Business MP 6.89 (Old Youngs Bay Bridge)
MP 6.89. Effective November 10, 2009 the Old Youngs Bay Bridge in Astoria will be restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW Weight Table 2.
Effective November 15, 2004 at MP 40.71 Neahkahnie Mountain Chasm Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW. Weight Table 2 for divisible loads.
US101 MP 141.67 (Yaquina Bay Bridge)
Effective March 1, 2013, the Yaquina Bay Bridge in Newport is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW, Weight Table 2 for Divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW, Weight Table 3 for Non-Divisible loads. Non-divisible loads exceeding these weights (up to Weight Table 5) may cross the bridge if they stop traffic/straddle the centerline and are the only vehicle on the bridge when crossing. Certified flaggers are required to stop both northbound and southbound traffic. The rolling stop method is not allowed.
US101 MP 190.98 Siuslaw River (Florence)
Effective March 17, 2003 at MP 190.98 Siuslaw River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW. Weight Table 2 for Divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW. Weight Table 3 for Non-Divisible loads.
US199 MP 7.0 Applegate River Bridge
MP 7.0 Applegate River Bridge (7 miles west of Grants Pass) is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW. Weight Table 2 for Divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW. Weight Table 3 for Non-Divisible loads.
OR Routes
OR18 MP 51.57 Yamhill River near Dayton
MP 51.57 Yamhill River Bridge near Dayton is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW., Weight Table 2 Divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW., Weight Table 3 Non-Divisible loads
OR22 MP 10.49 Louie Creek Bridge
OR22 Louie Creek Bridge at MP10.49 is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle; Weight Table 3 only.
OR22 MP 10.66 Louie Creek Bridge
OR22 Louie Creek Bridge at MP10.66 is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle; Weight Table 3 only.
OR22 Mill City Bridge (not on main OR22)
Bridge actually on Connector 162AY MP 1C30.29 - 1st Street crossing over the Santiam River is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW., Weight Table 2.
OR27 Irrigation Ditch at MP 1.90
This bridge is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle; Weight Table 4.
OR27 Irrigation Ditch at MP 2.88
This bridge is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle; Weight Table 4.
OR27 Irrigation Ditch at MP 4.59
This bridge is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle; Weight Table 4.
OR27 MP 27.23 Bear Creek
OR27 MP27.23 Bear Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs GVW; Weight Table 2.
Old OR34 Van Buren St Bridge (Corvallis)
MP 0.13 Willamette River (Van Buren Street) in Corvallis is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 80,000 lbs. GVW., Weight Table 1
OR35 OR/WA Border at Hood River
OR35 White Salmon Bridge at Hood River is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 80,000 lbs. GVW; Weight Table 1. Bridge belongs to Port of Hood River.
OR36 MP 19.69 Steinhauer Creek
OR36 Steinhauer Creek Bridge at MP19.69 is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle; Weight Table 4.
OR43 MP 11.43 (Arch Bridge - Oregon City)
The Oregon City Arch Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 80,000 lbs. GVW, Weight Table 1.
OR52 MP 21.30 (Snake River Bridge - near Payette, ID)
Effective March 25, 2013, the Snake River Bridge is restricted to the following weights: all solo trucks restricted to 32,000 lbs; all truck-tractor/semitrailer combinations, including doubles and triples combinations, restricted to 54,000 lbs; all solo truck and trailer combinations restricted to 32,000 lbs on the truck, not to exceed 56,000 lbs for the combination.
OR53 MP 5.98 Jack Horner Creek
OR53 Jack Horner Creek Bridge at MP5.98 is restricted to 20,000 lbs. single axle, 40,000 lbs tandem axle; Weight Table 3.
OR82 MP 17.88 Indian Creek/Grande Ronde River Bridge
MP 17.88 Indian Creek/Grande Ronde River Bridge 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW., Weight Table 2 Divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW., Weight Table 3 Non-Divisible loads. Vehicles exceeding these weights may cross the bridge if they straddle the centerline, do not exceed 25 MPH and are the only vehicle on the bridge. Certified flaggers are required to stop traffic.
OR99W SB MP 12.20 Tualatin River Bridge
MP 12.20 Tualatin River Bridge in King City is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW., Weight Table 2.
Effective April 4, 2011, the Skipanon River Bridge on OR104 Spur (Fort Stevens Spur Hwy) is restricted to 38,000 lbs. for solo trucks; 56,000 lbs. for 3-2 axle truck combinations; 64,000 lbs. for 3-3 axle (or more) truck combinations.
OR120 MP 0.38 Columbia Slough Bridge (Swift Hwy in Portland)
This bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW. Weight Table 2 for divisible loads.
OR126 Business WB MP 1.34 (Main St. Springfield)
MP 1.34 Willamette River Bridge (1 mile east of I-5 in Springfield) is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW., Weight Table 2 Divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW., Weight Table 3 Non-Divisible loads
OR130 MP 3.23 Panther Creek
MP 3.23 Panther Creek 3.23 miles east of US101 is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW., Weight Table 2
OR130 MP 3.60 Squaw Creek
MP 3.60 Squaw Creek 3.60 miles east of US101 is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW., Weight Table 2
OR130 MP 3.82 Austin Creek
MP 3.82 Austin Creek 3.82 miles east of US101 is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW., Weight Table 2
OR130 MP 4.15 Little Nestucca
MP 4.15 Little Nestucca River 4.15 miles east of US101 is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW., Weight Table 2
OR130 MP 4.76 Bear Creek
MP 4.76 Bear Creek 4.76 miles east of US101 is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW., Weight Table 2
OR153 MP 5.88 Bellvue-Hopewell Hwy
OR153 MP 5.88 Salt Creek Bridge (Ash Swale) just west of Amity is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, Wt. Table 3
OR164 (Jefferson Hwy) MP 6.24 (Santiam River Bridge) - Jefferson
OR164 at MP 6.24 crossing the Santiam River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW. Weight Table 2 for Divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW. Weight Table 3 for Non-Divisible loads.
OR206 MP 2.92 Deschutes River
MP 2.92 crossing over the Deschutes River (1.2 miles south of I-84) 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW., Weight Table 2
OR207 MP 11.86
MP11.86 (5.5 miles south of Hermiston) is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs GVW, Wt. Table 2 Divisible Load; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW, Wt. Table 3 Non-divisible Load.
OR219 MP 23.46 Willamette River near Newberg
MP 23.46 Willamette River Bridge near Newberg is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW., Weight Table 2 Divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW., Weight Table 3 Non-Divisible loads
OR234 MP 0.04 - Rogue River Bridge - Gold Hill
OR234 Rogue River Bridge at MP 0.04 is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW, Weight Table 2 Divisible Loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW, Weight Table 3 Non-Divisible Loads.
OR241 MP 0.51 (Isthmus Slough)
MP 0.51 Isthmus Slough (1/2 mile from US101) is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 80,000 lbs. GVW., Weight Table 1
OR339/Freewater Hwy MP 2.76 West Crockett Branch
OR339 MP 2.76 West Crockett Bridge is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle; Wt. Table 4.
OR339/Freewater Hwy MP 3.16 East Fork Little Walla Walla River
OR339 MP 3.16 Little Walla Walla River Bridge is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle; Wt. Table 4.
OR339/Freewater Hwy MP 3.31 West Fork Little Walla Walla River
OR339 MP 3.31 Little Walla Walla River Bridge is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle; Wt. Table 4.
Other Jurisdictions
Old OR99 (DC388) Old Winchester Bridge (Roseburg)
Old Winchester Bridge on DC388 (Old 99) at MP12.21 is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW.- Weight Table 2 Divisible Loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW.- Weight Table 3 Non- Divisible Loads.