Road Restrictions 8/22/2017

Print Road & Bridge Restrictions     Print Road Restrictions Only

ROAD RESTRICTIONS

Interstate Routes

I-5 NB Exit 11 to OR99 (Ashland)

Effective September 6, 2017, the ramp from I-5 northbound Exit 11 to OR99 will be closed between the hours of 6 AM & 6 PM. Estimated date of completion is September 6, 2017.

I-5 MP 14.96 NB (Ashland)

Effective April 3, 2017, this section of I-5 northbound will be restricted to 15 feet 00 in. in width between the hours of 7 PM & 7 AM. Mobile homes with eaves are allowed, provided the base width does not exceed 15 feet 00 in. in width. Loads wider than 15 feet 00 in. in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is August 31, 2017.

I-5 NB Exit 30 ramp to OR62 (Medford)

Effective August 15, 2017, the ramp from I-5 northbound Exit 30 to OR62 will be intermittently closed between the hours of 7 PM & 7 AM. Estimated date of completion is August 31, 2017.

I-5 MP 57.06 NB & SB (Grants Pass)

Effective April 3, 2017, this section of I-5 will be restricted to 15 feet 00 in. in width between the hours of 7 PM & 7 AM. Mobile homes with eaves are allowed, provided the base width does not exceed 15 feet 00 in. in width. Loads wider than 15 feet 00 in. in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is August 31, 2017.

I-5 SB Exit 78 ramp to Speaker Rd (Glendale)

Effective August 13, 2017, the ramp from I-5 southbound Exit 78 to Speaker Rd will be closed between the hours of 7 AM & 7 PM. Estimated date of completion is August 23, 2017.

I-5 MP 101.54 NB & SB (Myrtle Creek)

Effective April 3, 2017, this section of I-5 will be restricted to 15 feet 00 in. in width between the hours of 7 PM & 7 AM. Mobile homes with eaves are allowed, provided the base width does not exceed 15 feet 00 in. in width. Loads wider than 15 feet 00 in. in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is August 31, 2017.

I-5 MP 128.92 NB & SB (N Umpqua River Bridge - Roseburg)

Effective July 19, 2017, this section of I-5 will be restricted to 17 feet 00 in. in width between the hours of 8 PM & 6 AM. Estimated date of completion is August 25, 2017.

I-5 MP 150 to MP 152 NB (Yoncalla)

Effective July 30, 2017, this section of I-5 northbound will be restricted to 11 feet 00 in. in width between the hours of 7 PM & 7 AM. Estimated date of completion is August 15, 2017.

I-5 MP 150.79 SB (Yoncalla)

Effective April 3, 2017, this section of I-5 southbound will be restricted to 15 feet 00 in. in width between the hours of 7 PM & 7 AM. Mobile homes with eaves are allowed, provided the base width does not exceed 15 feet 00 in. in width. Loads wider than 15 feet 00 in. in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is August 31, 2017.

I-5 MP 154 to MP 163 NB & SB (Anlauf)

Effective September 5, 2017, this section of I-5 will be restricted to 16 feet 00 in. in width on Sunday to Thursday nights between the hours of 7 PM & 7 AM. Loads wider than 16 feet 00 in. in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is October 6, 2017.

I-5 MP 156.50 to MP 157.50 NB (Yoncalla) -- NEW --

Effective September 5, 2017, this section of I-5 will be restricted to 12 feet 00 in. in width Sunday through Thursday nights between the hours of 7 PM & 7 AM. Estimated date of completion is October 6, 2017.

I-5 MP 156.65 NB & SB (crossing under Cox Rd - Anlauf)

Effective September 5, 2017, this section of I-5 will be restricted to 16 feet 07 in. in height on Sunday to Thursday nights between the hours of 7 PM & 7 AM. Estimated date of completion is October 6, 2017.

I-5 NB Exit 161 ramp to Anlauf/Lorane

Effective September 5, 2017, the ramp from I-5 northbound Exit 161 to Anlauf/Lorane will be intermittently closed. Estimated date of completion is October 6, 2017.

I-5 MP 163 to MP 164 NB & SB (Curtin)

Effective August 8, 2017, this section of I-5 will be restricted to 12 feet 00 in. in width between the hours of 7 PM & 7 AM. Estimated date of completion is August 22, 2017.

I-5 MP 164 to MP 165 NB & SB (Anlauf)

Effective August 1, 2017, this section of I-5 will be restricted to 14 feet 00 in. in width between the hours of 7 PM & 7 AM. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Estimated date of completion is August 15, 2017.

I-5 MP 216 to MP 222 NB & SB (Halsey)

Effective June 19, 2017 this section of I-5 will be restricted to 16 feet 00 in. in width between the hours of 9 PM & 5:30 AM. Estimated date of completion is September 15, 2017.

I-5 MP 234.0 to MP 245.5 SB (north of Albany)

Effective August 13, 2017, this section of I-5 southbound will be restricted to 15 feet 10 in. in height between the hours of 9 PM & 5:30 AM. Estimated date of completion is October 31, 2017.

I-5 MP 234.0 to MP 245.5 NB & SB (north of Albany)

Effective August 13, 2017, this section of I-5 will be restricted to 12 feet 00 in. in width between the hours of 9 PM & 5:30 AM. Estimated date of completion is October 31, 2017.

I-5 NB & SB Exits 234-248 on- and off-ramps (Albany to Salem)

Effective August 20, 2017, the following on- and off-ramps to/from I-5 northbound and southbound will be intermittently closed on Sunday to Thursday nights between the hours of 9 PM & 5:30 AM: Exits 234, 235, 237, 238, 239, 242, 243, 244, 248. Estimated date of completion is October 15, 2017.

I-5 MP 256 to MP 258 NB & SB (Salem)

Effective June 19, 2017, this section I-5 will be restricted to 20 feet 00 in. in width between the hours of 9 PM & 5 AM. Estimated date of completion is September 15, 2017.

I-5 MP 270.50 to MP 283.01 NB & SB (Woodburn to Wilsonville)

Effective July 5, 2017, this section of I-5 will be restricted to 15 feet 00 in. in width on Sunday to Thursday nights between the hours of 9 PM & 5 AM. Estimated date of completion is October 13, 2017.

I-5 MP 270.50 to MP 283.01 NB & SB (Woodburn to Wilsonville)

Effective July 5, 2017, this section of I-5 will be restricted to 17 feet 01 in. in height southbound, and 16 feet 09 in. in height northbound, on Sunday to Thursday nights between the hours of 9 PM & 5 AM. Estimated date of completion is October 13, 2017.

I-5 SB Exit 271 ramp to OR214 and OR219 (Woodburn)

Effective July 16, 2017, the ramp from I-5 southbound Exit 271 to OR214 and OR219 will be intermittently closed on Sunday to Thursday nights between the hours of 9 PM & 5 AM. Estimated date of completion is July 21, 2017.

I-5 SB Exit 278 on- and off-ramps to/from Ehlen Rd (Aurora)

Effective June 25, 2017, the I-5 southbound Exit 278 on- and off-ramps to/from Ehlen Rd will be intermittently closed between the hours of 9 PM & 5 AM. Estimated date of completion is June 30, 2017.

I-5 NB & SB on and off-ramps to/from French Prairie Rest Area (south of Wilsonville)

Effective August 9, 2017, the I-5 northbound and southbound on- and off-ramps to/from French Prairie Rest Area will be intermittently closed between the hours of 9 PM & 5 AM. Estimated date of completion is October 13, 2017.

I-5 SB Exit 282B on- and off-ramps to/from Charbonneau District (south of Wilsonville)

Effective August 9, 2017, the ramps from I-5 southbound Exit 282B to/from Charbonneau District will be intermittently closed between the hours of 9 PM & 5 AM. Estimated date of completion is October 13, 2017.

I-5 NB Exit 282 ramp to Canby (south of Wilsonville)

Effective August 9, 2017, the ramp from I-5 northbound Exit 282 to Canby will be intermittently closed between the hours of 9 PM & 5 AM. Estimated date of completion is October 13, 2017.

I-5 NB Exit 289 off-ramp to Nyberg Rd (Tualatin)

Effective August 7, 2017, the ramp from I-5 northbound Exit 289 to Nyberg Rd will be intermittently closed between the hours of 10 PM & 5:30 AM. Estimated date of completion is August 11, 2017.

I-5 NB on-ramp from Nyberg Rd EB (Tualatin)

Effective August 7, 2017, the ramp from Nyberg Rd eastbound to I-5 northbound will be intermittently closed between the hours of 10 PM & 5:30 AM. Estimated date of completion is August 11, 2017.

Carman Dr crossing over I-5 (Tualatin)

Effective August 7, 2017, Carman Dr crossing over I-5 will be intermittently closed between the hours of 10 PM & 5:30 AM. This closure is NOT on the I-5 mainline. Estimated date of completion is August 11, 2017.

I-5 NB Truck Ramp (Portland)

Effective August 5, 2017, the I-5 northbound Truck Ramp will be intermittently closed between the hours of 7 PM & 9 AM. All traffic will be directed to stay on the I-5 mainline. Estimated date of completion is August 17, 2017.

I-5 MP 294.23 to MP 293.80 SB (Portland)

Effective August 12, 2017, this section of I-5 southbound will be restricted to 13 feet 00 in. in width, per the following schedule: Sunday to Friday nights between the hours of 9 PM & 5 AM; Saturday nights between the hours of 9 PM & 8 AM. Estimated date of completion is August 17, 2017.

I-5 SB Exit 294 ramp to OR99W (Portland)

Effective August 12, 2017, the ramp from I-5 southbound Exit 294 to OR99W will be intermittently closed between the hours of 7 PM & 9 AM. Estimated date of completion is August 17, 2017.

I-5 NB on-ramp from Barbur Blvd (near Exit 294 - Portland)

Effective August 5, 2017, the ramp from Barbur Blvd to I-5 northbound near Exit 294 will be intermittently closed between the hours of 7 PM & 9 AM. Estimated date of completion is August 17, 2017.

I-5 NB Exit 297 ramp to Terwilliger Blvd (Portland)

Effective August 7, 2017, the ramp from I-5 northbound Exit 297 to Terwilliger Blvd will be intermittently closed between the hours of 10 PM & 5:30 AM. Estimated date of completion is August 11, 2017.

I-5 NB on-ramp from Barbur Blvd (near Exit 297 - Portland)

Effective August 7, 2017, the ramp from Barbur Blvd to I-5 northbound near Exit 297 will be intermittently closed between the hours of 10 PM & 5:30 AM. Estimated date of completion is August 11, 2017.

I-5 MP 301 to MP 302 NB & SB (Portland)

Effective June 8, 2017, this section of I-5 will be restricted to 14 feet 00 in. in width between the hours of 10 PM & 5 AM. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Estimated date of completion is October 27, 2017.

I-5 MP 301 to MP 302 NB & SB (Portland)

Effective June 8, 2017, this section of I-5 will be restricted to 14 feet 06 in. in height southbound, and 16 feet 01 in. in height northbound, between the hours of 10 PM & 5 AM. Estimated date of completion is October 27, 2017.

I-5 NB on-ramp from the Morrison Bridge (Portland)

Effective June 8, 2017, the ramp from the Morrison Bridge to I-5 northbound will be intermittently closed per the following schedule: Sunday to Thursday nights between the hours of 10 PM & 5 AM; Friday and Saturday nights between the hours of 11 PM & 8 AM. Estimated date of completion is October 27, 2017.

I-5 SB Exit 300B ramp to OR99E/Oregon City/OMSI (Portland)

Effective June 8, 2017, the ramp from I-5 southbound Exit 300B to OR99E/Oregon City/OMSI will be intermittently closed per the following schedule: Sunday to Thursday nights between the hours of 10 PM & 5 AM; Friday and Saturday nights between the hours of 11 PM & 8 AM. Estimated date of completion is October 27, 2017.

I-5 SB on-ramp from Wheeler St (Portland)

Effective June 8, 2017, the ramp from Wheeler St to I-5 southbound will be intermittently closed per the following schedule: Sunday to Thursday nights between the hours of 10 PM & 5 AM; Friday and Saturday nights between the hours of 11 PM & 8 AM. Estimated date of completion is October 27, 2017.

I-5 NB Exit 302C ramp to Greeley Ave/Swan Island (Portland)

Effective August 7, 2017, the ramp from I-5 northbound Exit 302C to Greeley Ave/Swan Island will be intermittently closed between the hours of 10 PM & 5:30 AM. Estimated date of completion is August 11, 2017.

I-5 MP 306.6 to MP 307.6 NB (Portland)

Effective August 7, 2017, this section of I-5 northbound will be restricted to 14 feet 00 in. in width between the hours of 10 PM & 5:30 AM. Estimated date of completion is August 11, 2017.

I-5 MP 306.6 to MP 307.6 NB (Portland)

Effective August 7, 2017, this section of I-5 northbound will be restricted to 18 feet 04 in. in height between the hours of 10 PM & 5:30 AM. Estimated date of completion is August 11, 2017.

I-5 NB Exit 307 ramp to OR99E (Portland)

Effective August 7, 2017, the ramp from I-5 northbound Exit 307 to OR99E will be intermittently closed between the hours of 10 PM & 5:30 AM. Estimated date of completion is August 11, 2017.

I-82 MP 0.00 NB & SB (Columbia River Bridge - Umatilla)

Effective August 7, 2017, this section of I-82 will be restricted to 14 feet 00 in. in width. Load wider than 14 feet 00 in. in width may be accommodated on a case-by-case basis. Contact Washington DOT at 360-704-6340 for additional information. Estimated date of completion is September 28, 2018.

I-84 MP 0 to MP 2 EB (Portland)

Effective June 1, 2017, this section of I-84 eastbound will be restricted to 13 feet 00 in. in width on Sunday to Thursday nights between the hours of 10 PM & 5 AM. Estimated date of completion is October 31, 2017.

I-84 MP 0 to MP 2 EB (Portland)

Effective June 1, 2017, this section of I-84 eastbound will be restricted to 15 feet 07 in. in height on Sunday to Thursday nights between the hours of 10 PM & 5 AM. Estimated date of completion is October 31, 2017.

I-84 WB to I-5 NB Ramp

Effective June 26, 2017, the ramp from I-84 westbound to I-5 northbound will be intermittently closed per the following schedule: Sunday through Thursday nights between the hours of 10 PM & 5 AM; Friday & Saturday nights between the hours of 11 PM & 8 AM. Estimated date of completion is October 27, 2017.

I-84 EB on-ramp from the Morrison Bridge (Portland)

Effective June 8, 2017, the ramp from the Morrison Bridge to I-84 eastbound will be intermittently closed per the following schedule: Sunday to Thursday nights between the hours of 10 PM & 5 AM; Friday and Saturday nights between the hours of 11 PM & 8 AM. Estimated date of completion is October 27, 2017.

I-84 MP 5 to MP 1 WB (Portland)

Effective July 12, 2017, this section of I-84 westbound will be restricted to 13 feet 00 in. in width between the hours of 10 PM & 5 AM. Estimated date of completion is October 31, 2017.

I-84 MP 5 to MP 1 WB (Portland)

Effective July 12, 2017, this section of I-84 westbound will be restricted to 15 feet 09 in. in height between the hours of 10 PM & 5 AM. Estimated date of completion is October 31, 2017.

I-84 MP 2 to MP 3 EB (Portland)

Effective June 1, 2017, this section of I-84 eastbound will be restricted to 14 feet 00 in. in width on Sunday to Thursday nights between the hours of 10 PM & 5 AM. Estimated date of completion is October 31, 2017.

I-84 MP 2 to MP 3 EB (Portland)

Effective June 1, 2017, this section of I-84 eastbound will be restricted to 15 feet 07 in. in height on Sunday to Thursday nights between the hours of 10 PM & 5 AM. Estimated date of completion is October 31, 2017.

I-84 MP 3 to MP 4 EB (Portland)

Effective June 1, 2017, this section of I-84 eastbound will be restricted to 13 feet 00 in. in width on Sunday to Thursday nights between the hours of 10 PM & 5 AM. Estimated date of completion is October 1, 2017.

I-84 MP 3 to MP 4 EB (Portland)

Effective June 1, 2017, this section of I-84 eastbound will be restricted to 16 feet 02 in. in height on Sunday to Thursday nights between the hours of 10 PM & 5 AM. Estimated date of completion is October 1, 2017.

I-84 MP 5 to MP 6 EB (Portland)

Effective June 1, 2017, this section of I-84 eastbound will be restricted to 17 feet 00 in. in width on Sunday to Thursday nights between the hours of 10 PM & 5 AM. Estimated date of completion is October 31, 2017.

I-84 MP 5 to MP 6 EB (Portland)

Effective June 1, 2017, this section of I-84 eastbound will be restricted to 16 feet 07 in. in height on Sunday to Thursday nights between the hours of 10 PM & 5 AM. Estimated date of completion is October 31, 2017.

I-84 MP 6 to MP 5 WB (Portland)

Effective August 1, 2017, this section of I-84 westbound will be restricted to 19 feet 00 in. in width, per the following schedule: Monday to Thursday nights between the hours of 8 PM & 5 AM; Friday nights between the hours of 8 PM & 7 AM. Estimated date of completion is October 31, 2017.

I-84 MP 17.5 to MP 21.0 EB & WB (east of Troutdale)

Effective August 9, 2017, this section of I-84 will be restricted to 21 feet 00 in. in width between the hours of 8 PM & 10 AM. Estimated date of completion is September 30, 2017.

I-84 EB & WB Exit 56 on- and off-ramps to/from Viento State Park

Effective August 14, 2017, the I-84 eastbound and westbound Exit 56 on- and off-ramps to/from Viento State Park will be restricted to 19 feet 00 in. in width between the hours of 8 PM & 8 AM. Estimated date of completion is August 25, 2017.

I-84 MP 56.04 EB & WB (Viento State Park)

Effective August 14, 2017, this section of I-84 will be closed between the hours of 8 PM & 8 AM. When closed, all traffic will be directed to take the Exit 56 off-ramp and re-enter I-84. Estimated date of completion is August 25, 2017.

I-84 MP 114.6 EB & WB (east of Rufus)

Effective August 14, 2017, this section of I-84 will be restricted to 16 feet 00 in. in width between the hours of 7 AM & 7 PM. Wider loads may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is October 13, 2017.

I-84 MP 114.6 EB & WB (east of Rufus)

Effective August 14, 2017, this section of I-84 will be restricted to 12 feet 00 in. in width between the hours of 7 PM & 7 AM. Wider loads may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is October 13, 2017.

I-84 MP 165.76 EB (Boardman) -- NEW --

Effective September 14, 2017, this section of I-84 eastbound will be restricted to 16 feet 00 in. in width between the hours of 7 AM & 5 PM. Estimated date of completion is September 16, 2017.

I-84 MP 188.42 EB (Stanfield) -- NEW --

Effective September 13, 2017, this section of I-84 eastbound will be restricted to 16 feet 00 in. in width between the hours of 7 AM & 5 PM. Estimated date of completion is September 15, 2017.

I-84 MP 224.05 WB (east of Pendleton) -- NEW --

Effective September 13, 2017, this section of I-84 westbound will be restricted to 21 feet 00 in. in width between the hours of 7 AM & 5 PM. Estimated date of completion is September 15, 2017.

I-84 MP 256.18 EB (west of La Grande) -- NEW --

Effective September 12, 2017, this section of I-84 eastbound will be restricted to 16 feet 00 in. in width between the hours of 7 AM & 5 PM. Estimated date of completion is September 13, 2017.

I-84 MP 284 to MP 297 EB & WB (west of Baker City)

Effective April 25, 2017, this section of I-84 will be restricted to 18 feet 00 in. in width. Estimated date of completion is October 31, 2017.

I-84 MP 284 to MP 297 EB & WB (west of Baker City)

Effective April 25, 2017, this section of I-84 will be restricted to 17 feet 00 in. in height eastbound, and 16 feet 11 in. in height westbound. Estimated date of completion is October 31, 2017.

I-84 MP 313.0 to MP 318.5 EB & WB (east of Baker City)

Effective April 3, 2017, this section of I-84 will be restricted to 16 feet 00 in. in width. Loads wider than 16 feet 00 in. in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is September 22, 2017.

I-205 MP 0.99 to MP 8.82 NB & SB (Tualatin to West Linn)

Effective July 9, 2017, this section of I-205 will be restricted to 13 feet 00 in. in width at the following times: Sunday to Thursday nights between the hours of 10 PM & 5 AM; Friday nights between the hours of 11 PM & 7 AM; Saturday nights between the hours of 11 PM & 8 AM. Estimated date of completion is October 31, 2017.

I-205 NB & SB Exit 3 on- and off-ramps to/from Stafford Rd (Lake Oswego)

Effective July 23, 2017, the I-205 northbound and southbound Exit 3 on- and off-ramps to/from Stafford Rd will be intermittently closed per the following schedule: Sunday to Thursday nights between the hours of 9 PM & 5 AM; Friday nights between the hours of 9 PM & 7 AM; Saturday nights between the hours of 9 PM & 8 AM. Estimated date of completion is September 30, 2017.

I-205 NB & SB Exit 6 on- and off-ramps to/from 10th St (West Linn)

Effective July 23, 2017, the I-205 northbound and southbound Exit 6 on- and off-ramps to/from 10th St will be intermittently closed per the following schedule: Sunday to Thursday nights between the hours of 9 PM & 5 AM; Friday nights between the hours of 9 PM & 7 AM; Saturday nights between the hours of 9 PM & 8 AM. Estimated date of completion is September 30, 2017.

I-205 NB & SB Exit 8 on- and off-ramps to/from OR43 (West Linn)

Effective July 23, 2017, the I-205 northbound and southbound Exit 8 on- and off-ramps to/from OR43 will be intermittently closed per the following schedule: Sunday to Thursday nights between the hours of 9 PM & 5 AM; Friday nights between the hours of 9 PM & 7 AM; Saturday nights between the hours of 9 PM & 8 AM. Estimated date of completion is September 30, 2017.

I-205 MP 13.0 to MP 16.3 NB & SB (Clackamas)

Effective February 13, 2017, this section of I-205 will be restricted to 17 feet 00 in. in height at the following times: Sunday to Thursday nights between the hours of 8 PM & 5:30 AM; Friday nights between the hours of 8 PM & 8 AM. Estimated date of completion is September 30, 2017.

I-205 SB Exit 21B to I-84 WB (Portland)

Effective August 3, 2017, the ramp from I-205 southbound Exit 21B to I-84 westbound will be intermittently closed, per the following schedule: Monday to Thursday nights between the hours of 8 PM & 5 AM; Friday nights between the hours of 8 PM & 7 AM. Estimated date of completion is August 12, 2017.

I-405 MP 0.00 to MP 2.35 NB & SB (Portland)

Effective August 25, 2017, this section of I-405 will be restricted to 13 feet 00 in. in width between the hours of 9 PM & 5 AM. Estimated date of completion is August 27, 2017.

I-405 MP 0.00 to MP 2.35 NB & SB (Portland)

Effective August 25, 2017, this section of I-405 will be restricted to 15 feet 01 in. in height northbound, and 15 feet 08 in. in height southbound, between the hours of 9 PM & 5 AM. Estimated date of completion is August 27, 2017.

I-405 NB on-ramp from SW 6th Ave (Portland)

Effective August 25, 2017, the ramp from SW 6th Ave to I-405 northbound will be closed between the hours of 9 PM & 5 AM. Estimated date of completion is August 27, 2017.

I-405 NB Exit 1D ramp to US26 WB (Portland)

Effective August 25, 2017, the ramp from I-405 northbound Exit 1D to US26 westbound will be closed between the hours of 9 PM & 5 AM. Estimated date of completion is August 27, 2017.

I-405 NB Exit 2B ramp to Everett St (Portland)

Effective September 8, 2017, the ramp from I-405 northbound Exit 2B to Everett St will be closed between the hours of 10 PM & 6 AM. Estimated date of completion is September 9, 2017.

U.S. Routes

US20 MP 0.00 to MP 14.96 EB & WB (Sisters to Tumalo)

Effective June 12, 2017, this section of US20 will be restricted to 12 feet 00 in. in width on Sunday to Thursday nights between the hours of 8 PM & 7 AM. Estimated date of completion is September 15, 2017.

US20/US395 MP 131.44 to MP 131.92 EB & WB (Burns) -- NEW --

Effective September 9, 2017, this section of US20/US395 will be closed between the hours of 9 AM & 11 AM for one day only.

US26 MP 0.59 EB & WB (Ross Island Bridge - Portland)

Effective February 28, 2017, this section of US26 will be restricted to 12 feet 00 in. in width between the hours of 9 PM & 5 AM. Estimated date of completion is August 31, 2017.

US26 MP 32.47 to MP 30.43 WB (Cherryville)

Effective August 25, 2017, this section of US26 westbound will be restricted to 12 feet 00 in. in width between the hours of 6 AM & 8 PM for one day only.

US26 MP 53.00 to MP 57.15 EB & WB (North Plains)

Effective May 22, 2017, this section of US26 will be restricted to 11 feet 00 in. in width between the hours of 8 PM & 6 AM. Estimated date of completion is September 15, 2017.

US26 MP 53.00 to MP 57.15 EB & WB (North Plains)

Effective May 22, 2017, this section of US26 will be restricted to 16 feet 07 in. in height between the hours of 8 PM & 6 AM. Estimated date of completion is September 15, 2017.

US26 EB ramp to OR6 WB (Banks)

Effective June 29, 2017, the ramp from US26 eastbound to OR6 westbound will be intermittently closed per the following schedule: Monday through Thursday nights between the hours of 8 PM & 5 AM; Friday nights between the hours of 9 PM & 8 AM; Saturday nights between the hours of 9 PM & 9 AM; Sunday nights between the hours of 9 PM & 5 AM. Estimated date of completion is August 31, 2017.

US26 WB ramp to OR6 WB (Banks)

Effective June 29, 2017, the ramp from US26 westbound to OR6 westbound will be intermittently closed per the following schedule: Monday through Thursday nights between the hours of 8 PM & 5 AM; Friday nights between the hours of 9 PM & 8 AM; Saturday nights between the hours of 9 PM & 9 AM; Sunday nights between the hours of 9 PM & 5 AM. Estimated date of completion is August 31, 2017.

US26 EB & WB Exit 55 on- and off-ramps to/from Dersham Rd (Banks)

Effective June 29, 2017, the US26 eastbound and westbound Exit 55 on- and off-ramps to/from Dersham Rd will be intermittently closed per the following schedule: Monday through Thursday nights between the hours of 8 PM & 5 AM; Friday nights between the hours of 9 PM & 8 AM; Saturday nights between the hours of 9 PM & 9 AM; Sunday nights between the hours of 9 PM & 5 AM. Estimated date of completion is August 31, 2017.

US26 MP 62.02 to MP 65.13 EB & WB (Hillsboro)

Effective October 31, 2016, this section of US26 will be restricted to 10 feet 00 in. in width between the hours of 10 PM & 5 AM. Estimated date of completion is October 31, 2017.

US26 MP 62.02 to MP 65.13 EB & WB (Hillsboro)

Effective October 31, 2016, this section of US26 will be restricted to 14 feet 00 in. in width on Saturdays from 1/2 hr before sunrise until 8 AM, and on Sundays from 1/2 hr before sunrise until 9 AM. Estimated date of completion is October 31, 2017.

US26 WB Exit 62A to Cornelius Pass Rd SB (Hillsboro)

Effective March 3, 2017, the ramp from US26 westbound Exit 62A to Cornelius Pass Rd southbound is closed to all single-trip oversize/overweight permits. Estimated date of completion is December 15, 2017.

US30 Bypass MP 1.32 to MP 1.85 EB & WB (Portland)

Effective June 23, 2017, this section of US30 Bypass will be restricted to 12 feet 00 in. in width. Loads wider than 12 feet 00 in. in width can be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is December 1, 2017.

US30 MP 12.5 to MP 12.7 WB (south of Scappoose)

Effective August 25, 2017 at 4:30 AM, this section of US30 westbound will be restricted to 14 feet 00 in. in width. Estimated date of completion is August 26, 2017 at 5 AM.

US30 MP 5.76 to MP 5.82 EB & WB (Huntington)

Effective September 2, 2017, this section of US30 will be closed between the hours of 7 AM & 5 PM for one day only.

US97 MP 273.5 to MP 279.5 NB & SB (Klamath Falls)

Effective January 18, 2017, this section of US97 will be restricted to 16 feet 07 in. in height northbound, and 19 feet 06 in. in height southbound, between the hours of 8 AM & 4 PM. Estimated date of completion is January 26, 2017.

US101 MP 65.82 to MP 65.68 NB (Tillamook)

Effective August 27, 2017, this section of US101 northbound will be closed between the hours of 9:30 PM & 5:30 AM. Estimated date of completion is September 1, 2017.

US101 MP 67.80 to MP 68 NB & SB (Tillamook) -- NEW --

Effective September 6, 2017 this section of US101 will be restricted to 14 feet 00 in. in width between the hours of 7 AM & 5 PM. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Estimated date of completion is September 6, 2017.

US101 MP 211.21 NB & SB (Umpqua River Bridge - Reedsport)

Effective January 25, 2016, this section of US101 will be restricted to 11 feet 06 in. in width on Monday to Thursday nights between the hours of 7 PM & 7 AM. Estimated date of completion is September 1, 2017.

US101 MP 211.21 NB & SB (Umpqua River Bridge - Reedsport)

Effective January 25, 2016, this section of US101 will be restricted to 14 feet 00 in. in width on Monday to Thursday between the hours of 7 AM & 7 PM. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Loads wider than 14 feet 00 in. in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is September 1, 2017.

US101 MP 233.99 (McCullough Bridge - Coos Bay)

Effective October 15, 2013, this section of US101 will be restricted to 11 feet 00 in. in width between the hours of 9 PM & 5 AM. Estimated date of completion is November 1, 2018.

US101 MP 347.78 NB & SB (north of Brookings)

Effective July 31, 2017, this section of US101 will be restricted to 16 feet 00 in. in width. Estimated date of completion is August 31, 2019.

OR Routes

OR8 MP 3.82 EB & WB (Beaverton)

Effective August 16, 2017, this section of OR8 will be restricted to 14 feet 00 in. in width between the hours of 8 PM & 5 AM. Estimated date of completion is August 18, 2017.

OR38 MP 21 to MP 26 EB & WB (east of Scottsburg)

Effective August 28, 2017, this section of OR38 will be restricted to 14 feet 00 in. in width. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Estimated date of completion is August 15, 2018.

OR38 MP 41 to MP 42 EB & WB (west of Drain)

Effective August 28, 2017, this section of OR38 will be restricted to 14 feet 00 in. in width. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Estimated date of completion is August 15, 2018.

OR47 MP 0.00 to MP 11.89 NB & SB (south of Clatskanie)

Effective July 31, 2017, this section of OR47 will be closed to truck traffic on Monday to Friday between the hours of 6 AM & 7 PM. Estimated date of completion is August 18, 2017.

OR47 MP 88.05 NB & SB (Forest Grove)

Effective September 27, 2016, this section of OR47 is restricted to 14 feet 00 inches in width and 135 feet overall length. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 in. in width. Loads wider than 14 feet or 135 feet overall length may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information.

OR47 MP 90.56 to MP 90.64 NB & SB (Forest Grove)

Effective May 1, 2017, this section of OR47 will be restricted to 16 feet 00 in. in width. Estimated date of completion is August 18, 2017.

OR47 MP 90.64 SB (Forest Grove)

Effective August 14, 2017, this section of OR47 southbound will be closed on Monday to Friday between the hours of 9 AM & 3 PM. Estimated date of completion is August 18, 2017.

OR53 MP 0.58 NB & SB (south of US26)

Effective July 18, 2017, this section of OR53 will be restricted to 14 feet 00 in. in width. Estimated date of completion is August 29, 2017.

OR62 MP 0 to MP 1 EB & WB (Medford)

Effective August 13, 2017, this section of OR62 will be restricted 17 feet 06 in. in width between the hours of 7 PM & 7 AM. Estimated date of completion is August 27, 2017.

OR99E (McLoughlin Blvd) MP 3.07 to MP 4.49 SB (Milwaukie)

Effective July 3, 2017, this section of OR99E southbound will be restricted to 8 feet 06 in. in width per the following schedule: Monday to Thursday nights between the hours of 8 PM & 5 AM; Friday nights at 8 PM until Monday morning at 5 AM. Estimated date of completion is October 15, 2017.

OR99E (McLoughlin Blvd) MP 4.49 to MP 3.07 NB (Milwaukie)

Effective July 3, 2017, this section of OR99E northbound will be restricted to 8 feet 06 in. in width per the following schedule: Sunday to Thursday nights between the hours of 7 PM & 5 AM; Friday nights at 7 PM until Monday morning at 5 AM. Estimated date of completion is October 15, 2017.

OR99E (McLoughlin Blvd) MP 4.78 to MP 3.07 NB (Milwaukie)

Effective July 7, 2017, this section of OR99E northbound will be closed on weekends from Friday at 10 PM until Monday at 5 AM. No closures will take place the weekends of August 11-14, and August 25-28. Estimated date of completion is September 1, 2017.

OR99E (McLoughlin Blvd) MP 3.07 to MP 4.49 NB & SB (Milwaukie)

Effective July 3, 2017, this section of OR99E will be restricted to 17 feet 01 in. in height per the following schedule: Sunday to Thursday nights between the hours of 7 PM & 5 AM; Friday nights at 7 PM until Monday morning at 5 AM. Estimated date of completion is October 15, 2017.

OR99E (McLoughlin Blvd) MP 4.78 to MP 3.07 NB (Milwaukie)

Effective July 24, 2017, this section of OR99E northbound will be restricted to 8 feet 06 in. in width at all hours. Loads wider than 8 feet 06 in. in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is August 21, 2017.

OR99E (McLoughlin Blvd) SB on- and off-ramps to/from Bybee Blvd (Milwaukie)

Effective July 5, 2017, the OR99E southbound ramps to/from Bybee Blvd will be closed at the following times: Monday to Thursday nights between the hours of 8 PM & 5 AM; Friday nights between the hours of 8 PM & 7 AM; Saturday nights between the hours of 7 PM & 8 AM; Sunday nights between the hours of 7 PM & 5 AM. Estimated date of completion is October 15, 2017.

OR99E (McLoughlin Blvd) NB & SB ramps to/from Tacoma St (Milwaukie)

Effective June 19, 2017, the OR99E northbound and southbound ramps to/from Tacoma St will be closed at the following times: Monday to Thursday nights between the hours of 8 PM & 5 AM; Friday nights between the hours of 8 PM & 7 AM; Saturday nights between the hours of 7 PM & 8 AM; Sunday nights between the hours of 7 PM & 5 AM. Estimated date of completion is September 15, 2017.

OR99E SB ramp to OR224 EB (Milwaukie)

Effective July 3, 2017, the ramp from OR99E southbound to OR224 eastbound will be closed per the following schedule: Sunday to Thursday nights between the hours of 9 PM & 5 AM; Friday nights between the hours of 9 PM & 7 AM; Saturday nights between the hours of 9 PM & 10 AM. Estimated date of completion is October 1, 2017.

OR99E SB ramp to OR224 EB (Milwaukie)

Effective June 19, 2017, the ramp from OR99E southbound to OR224 eastbound will be restricted to 14 feet 00 in. in width per the following schedule: Sunday to Thursday nights between the hours of 7 PM & 5:30 AM; Friday nights between the hours of 7 PM & 9 AM; Saturday nights between the hours of 7 PM & 10 AM. Estimated date of completion is October 1, 2017.

OR99E MP 22.03 NB (Molalla River Bridge - Canby)

Effective July 18, 2017, this section of OR99E northbound will be intermittently closed between the hours of 7 PM & 6 AM. Estimated date of completion is July 29, 2017.

OR99W MP 103.68 NB & SB (north of Junction City)

Effective April 24, 2017, this section of OR99W will be restricted to 15 feet 00 in. in width. Mobile homes with eaves are allowed, provided the base width does not exceed 15 feet 00 in. in width. Loads wider than 15 feet 00 in. in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is October 13, 2017.

OR126 Business MP 1.69 to MP 2.46 EB & WB (Springfield)

Effective August 26, 2017, this section of OR126 Business will be closed between the hours of 5 PM & 11 PM for one day only.

OR130 (Little Nestucca Hwy) MP 5 to MP 8 EB & WB (Dolph) -- NEW --

Effective September 7, 2017, this section of OR130 (Little Nestucca Hwy) will be closed between the hours of 6 AM & 6 PM. Estimated date of completion is September 7, 2017.

OR213 (82nd Dr) MP 6.18 to MP 6.24 NB & SB (Portland)

Effective July 31, 2017, this section of OR213 (82nd Dr) will be restricted to 10 feet 00 in. in width between the hours of 8 PM & 5 AM. Estimated date of completion is September 30, 2017.

OR213 MP 9.14 to MP 10.90 SB (Mulino)

Effective July 3, 2017, this section of OR213 southbound will be restricted to 9 feet 00 in. in width. Estimated date of completion is December 31, 2017.

OR213 MP 10.90 to MP 9.14 NB (Mulino)

Effective July 3, 2017, this section of OR213 northbound will be restricted to 12 feet 00 in. in width. Estimated date of completion is December 31, 2017.

Kruse Way EB crossing over I-5 (Tigard)

Effective August 7, 2017, Kruse Way eastbound crossing over I-5 will be closed between the hours of 10 PM & 5:30 AM. Estimated date of completion on August 11, 2017.

Kruse Way WB ramp to I-5 SB (Tigard)

Effective August 7, 2017, the ramp from Kruse Way westbound to I-5 southbound will be closed between the hours of 10 PM & 5:30 AM. Estimated date of completion is August 11, 2017.

OR223 SB (Main St) MP 3.19 to MP 3.40 (Dallas)

Effective August 18, 2017 at 9 AM, this section of OR223 southbound will be closed. The highway is estimated to re-open by 5 PM on August 21, 2017.

OR224 WB ramp to OR99E NB (Milwaukie)

Effective July 3, 2017, the ramp from OR224 westbound to OR99E northbound will be restricted to 13 feet 00 in. in width per the following schedule: Sunday to Thursday nights between the hours of 7 PM & 5:30 AM; Friday nights between the hours of 7 PM & 9 AM; Saturday nights between the hours of 7 PM & 10 AM. Estimated date of completion is October 1, 2017.

OR229 MP 23 to MP 23.20 NB & SB (Fuller River Bridge - Siletz) -- NEW --

Effective September 5, 2017 this section of OR229 will be restricted to 14 feet 00 in. in width between the hours of 7 AM & 12 (noon). Mobile homes with eaves are allowed, provided that the base width does not exceed 14 feet 00 in. in width. Estimated date of completion is September 5, 2017.

OR540 (Cape Arago Hwy) MP 10.19 NB & SB (Charleston)

Effective July 5, 2017, this section of OR540 (Cape Arago Hwy) will be restricted to 12 feet 00 in. in width. Estimated date of completion is September 15, 2017.

BRIDGE RESTRICTIONS

Interstate Routes

I-5 MP 104.85 Chadwick Ln crossing over I-5 (near Riddle)

Chadwick Ln crossing over I-5 is restricted to the following weights: 20,000 single axle, 34,000 lbs. tandem axle - 80,000 lbs. GVW. Weight Table 1.

I-5 MP 151.81 Wilson Rd crossing over I-5 (Yoncalla)

Wilson Rd crossing over I-5 is restricted to the following weights: 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.

I-84 MP 256.42 Upper Perry Interchange crossing over I-84 (Perry)

Upper Perry Interchange crossing over I-84 is restricted to the following weights: 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW, Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.

U.S. Routes

US26 MP 0.59 EB & WB (Ross Island Bridge - Portland)

Effective February 6, 2017, US26 across the Ross Island Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW. Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads. Estimated date of completion is August 31, 2017.

US30 (Historic Columbia River Hwy) MP 0.03 (Sandy River Bridge - Troutdale)

Effective May 3, 2017, US30 (Historic Columbia River Highway) crossing the Sandy River Bridge is restricted to the following weights: 21 tons for Type 3 Vehicles (3-axle single-unit trucks); 19 tons for SU4 Vehicles (4-axle single-unit trucks); 21 tons for SU5, SU6 & SU7 Vehicles (5 to 7 axle single-unit trucks); 26 tons for Type 3S2 (truck tractor/semitrailer) and Type 3-3 (truck and trailer) Vehicles.

US30 (Huntington Hwy) MP 0.46 (Burnt River Bridge - Lime)

Effective June 16, 2011, the Burnt River Bridge near Lime just off I-84 is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.

US30 (Historic Columbia River Hwy) MP 13.14 (Shepperds Dell Bridge)

US30 (Historic Columbia River Hwy) crossing Youngs Creek (Shepperds Dell) Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, Weight Table 1.

US30 (Historic Columbia River Hwy) MP 17.68 (West Multnomah Falls Bridge)

US30 (Historic Columbia River Hwy) crossing West Multnomah Falls Bridge is restricted to 28,000 lbs. for solo vehicles, 44,000 lbs. for 3-2 combinations, and 56,000 lbs. for 3-3 combinations.

US30 (Historic Columbia River Hwy) MP 20.39 (Horsetail Creek Bridge)

US30 (Historic Columbia River Hwy) crossing Horsetail Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, Weight Table 1.

US30 MP 30.42 (Bridge of the Gods - Cascade Locks)

Effective December 24, 2013, the Bridge of the Gods at US30 MP 30.42 is restricted to 80,000 lbs. GVW, Weight Table 1. This bridge belongs to the Port of Cascade Locks.

US30 OR/WA Border at Rainier (Lewis & Clark Bridge)

The Columbia River (Lewis & Clark) Bridge between Rainier, OR and Longview, WA is restricted to 21,500 lbs. per axle, no gross weight restriction. Contact the State of Washington at (360) 704-6340 for current information regarding size restrictions for this bridge.

US101 Business MP 4.78 (Lewis & Clark River Bridge - Astoria)

US101 Business crossing Lewis & Clark River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 80,000 lbs. GVW, Weight Table 1.

US101 Business MP 6.89 (Old Youngs Bay Bridge - Astoria)

Effective November 10, 2009, US101 Business crossing the Old Youngs Bay Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW, Weight Table 2.

US101 MP 40.71 (Neahkahnie Mtn Chasm Bridge - near Manzanita)

Effective November 15, 2004, Neahkahnie Mtn Chasm Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2 for divisible loads.

US101 MP 141.67 (Yaquina Bay Bridge - Newport)

Effective March 1, 2013, the Yaquina Bay Bridge in Newport is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW, Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW, Weight Table 3 for non-divisible loads. Non-divisible loads exceeding these weights (up to Weight Table 5) may cross the bridge if they stop traffic/straddle the centerline and are the only vehicle on the bridge when crossing. Certified flaggers are required to stop both northbound and southbound traffic. The rolling stop method is not allowed.

US101 MP 190.98 (Siuslaw River Bridge - Florence)

Effective March 17, 2003, the Siuslaw River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW. Weight Table 3 for non-divisible loads.

US101 MP 311.40 (Reinhart Creek Bridge - south of Port Orford)

Effective March 1, 2017, US101 crossing the Reinhart Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW, Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW, Weight Table 3 for non-divisible loads. Non-divisible loads exceeding these weights may cross the bridge if they stop oncoming traffic and straddle the centerline. Certified flaggers are required to stop oncoming traffic. Effective May 5, 2017, during construction, on-site certified flaggers may be provided to the carrier at no cost on a case-by-case basis during construction hours. Contact the Over-Dimension Permit Unit for information.

OR Routes

OR18 MP 51.57 (Yamhill River Bridge - Dayton)

OR18 crossing Yamhill River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.

OR22 MP 10.49 (Louie Creek Bridge - Dolph)

OR22 crossing Louie Creek Bridge is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, Weight Table 3 only.

OR22 MP 10.66 (Louie Creek Bridge - Dolph)

OR22 crossing Louie Creek Bridge is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, Weight Table 3 only.

Santiam River Bridge - Mill City (not on OR22 mainline)

1st St crossing Santiam River Bridge in Mill City is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2. This restriction is NOT on the OR22 mainline.

OR27 MP 1.90 (Irrigation Ditch - Prineville)

OR27 crossing Irrigation Ditch at MP 1.90 is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle, Weight Table 4.

OR27 MP 2.88 (Irrigation Ditch - Prineville)

OR27 crossing Irrigation Ditch at MP 2.88 is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle, Weight Table 4.

OR27 MP 4.62 (Irrigation Ditch - Prineville)

OR27 crossing Irrigation Ditch at MP 4.62 is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle, Weight Table 4.

OR27 MP 27.23 (Bear Creek Bridge - south of Prineville)

OR27 crossing Bear Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs GVW, Weight Table 2.

Old OR34 EB MP 0.13 (Willamette River / Van Buren St Bridge - Corvallis)

Old OR34 eastbound crossing Willamette River (Van Buren St) Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 80,000 lbs. GVW., Weight Table 1.

OR35 crossing Columbia River (White Salmon) Bridge - Hood River

OR35 crossing the Columbia River (White Salmon) Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 80,000 lbs. GVW, Weight Table 1. Bridge belongs to Port of Hood River.

OR43 MP 11.43 (Willamette River Arch Bridge - Oregon City)

OR43 crossing the Willamette River Arch Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 80,000 lbs. GVW, Weight Table 1.

OR53 MP 5.98 (Jack Horner Creek Bridge)

OR53 crossing Jack Horner Creek Bridge is restricted to 20,000 lbs. single axle, 40,000 lbs tandem axle, Weight Table 3.

OR86 MP 40.64 (Eagle Creek Bridge - Richland)

Effective October 20, 2016, all single-trip permit holders over continuous trip permit weights must stop all traffic, straddle centerline, and be the only vehicle on bridge when crossing.

OR104 Spur MP 4.62 (Skipanon River Bridge - Warrenton)

Effective April 4, 2011, OR104 Spur crossing the Skipanon River Bridge is restricted to 38,000 lbs. for solo trucks, 56,000 lbs. for 3-2 axle truck combinations, 64,000 lbs. for 3-3 axle (or more) truck combinations.

OR120 (Swift Hwy / Portland Rd) MP 0.38 (Columbia Slough Bridge - Portland)

OR120 (Swift Hwy / Portland Rd) crossing Columbia Slough Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.

OR126 Business MP 1.34 WB (Willamette River / Main St Bridge - Springfield)

OR126 Business westbound crossing Willamette River / Main St Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.

OR130 (Little Nestucca Hwy) MP 3.23 (Panther Creek Bridge)

OR130 (Little Nestucca Hwy) crossing Panther Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.

OR130 (Little Nestucca Hwy) MP 3.60 (Squaw Creek Bridge)

OR130 (Little Nestucca Hwy) crossing Squaw Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.

OR130 (Little Nestucca Hwy) MP 3.82 (Austin Creek Bridge)

OR130 (Little Nestucca Hwy) crossing Austin Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.

OR130 (Little Nestucca Hwy) MP 4.15 (Little Nestucca River Bridge)

OR130 (Little Nestucca Hwy) crossing Little Nestucca River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.

OR130 (Little Nestucca Hwy) MP 4.76 (Bear Creek Bridge)

OR130 (Little Nestucca Hwy) crossing Bear Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.

OR164 (Jefferson Hwy) MP 6.24 (Santiam River Bridge - Jefferson)

OR164 crossing the Santiam River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW. Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.

OR213 MP 9.14 to MP 10.90 NB & SB (Mulino)

Effective March 20, 2017, this section of OR213 is restricted to the following weights: 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2. Estimated date of completion is December 31, 2017.

OR219 MP 23.46 (Willamette River Bridge - south of Newberg)

OR219 crossing Willamette River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle. 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.

OR234 MP 0.04 (Rogue River Bridge - west of Gold Hill)

OR234 crossing Rogue River Bridge west of Gold Hill is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW, Weight Table 2 for divisible Loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW, Weight Table 3 for non-divisible loads.

OR241 MP 0.51 (Isthmus Slough)

MP 0.51 Isthmus Slough (1/2 mile from US101) is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 80,000 lbs. GVW., Weight Table 1

OR339 (Freewater Hwy) MP 2.76 (West Crockett Branch Bridge - Milton-Freewater)

OR339 (Freewater Hwy) crossing West Crockett Branch Bridge is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle, Weight Table 4.

OR339 (Freewater Hwy) MP 3.16 (East Fork Little Walla Walla River Bridge - Milton-Freewater)

OR339 (Freewater Hwy) crossing East Fork Little Walla Walla River Bridge is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle, Weight Table 4.

OR339 (Freewater Hwy) MP 3.31 (West Fork Little Walla Walla River Bridge - Milton-Freewater)

OR339 (Freewater Hwy) crossing West Fork Little Walla Walla River Bridge is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle, Weight Table 4.

Other Jurisdictions

Old OR99 (DC388) Old Winchester Bridge (Roseburg)

Old Winchester Bridge on DC388 (Old 99) at MP12.21 is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW.- Weight Table 2 Divisible Loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW.- Weight Table 3 Non- Divisible Loads.

Request email notification when restrictions change.