Road Restrictions 7/25/2017

Print Road & Bridge Restrictions     Print Road Restrictions Only

ROAD RESTRICTIONS

Interstate Routes

I-5 MP 14.96 NB (Ashland)

Effective April 3, 2017, this section of I-5 northbound will be restricted to 15 feet 00 in. in width between the hours of 7 PM & 7 AM. Mobile homes with eaves are allowed, provided the base width does not exceed 15 feet 00 in. in width. Loads wider than 15 feet 00 in. in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is August 31, 2017.

I-5 MP 57.06 NB & SB (Grants Pass)

Effective April 3, 2017, this section of I-5 will be restricted to 15 feet 00 in. in width between the hours of 7 PM & 7 AM. Mobile homes with eaves are allowed, provided the base width does not exceed 15 feet 00 in. in width. Loads wider than 15 feet 00 in. in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is August 31, 2017.

I-5 SB Exit 78 ramp to Speaker Rd (Glendale)

Effective May 15, 2017, the ramp from I-5 southbound Exit 78 to Speaker Rd will be closed between the hours of 7 AM & 7 PM. Estimated date of completion is June 5, 2017.

I-5 MP 101.54 NB & SB (Myrtle Creek)

Effective April 3, 2017, this section of I-5 will be restricted to 15 feet 00 in. in width between the hours of 7 PM & 7 AM. Mobile homes with eaves are allowed, provided the base width does not exceed 15 feet 00 in. in width. Loads wider than 15 feet 00 in. in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is August 31, 2017.

I-5 MP 119 to MP 120 NB (Roseburg)

Effective June 11, 2017, this section of I-5 northbound will be restricted to 16 feet 00 in. in width on Sunday to Thursday nights between the hours of 7 PM & 7 AM. Estimated date of completion is July 28, 2017.

I-5 NB Exit 119 to OR42 (Roseburg)

Effective July 5, 2017, the ramp from I-5 northbound Exit 119 to OR42 will be intermittently closed between the hours of 9 PM & 5 AM. Estimated date of completion is July 14, 2017.

I-5 NB Exit 120 off-ramp to Old Hwy 99 (Roseburg)

Effective July 9, 2017, the I-5 northbound off-ramp to Old Hwy 99 will be intermittently closed between the hours of 6 PM & 7 AM. Estimated date of completion is July 28, 2017.

I-5 MP 128.92 NB & SB (N Umpqua River Bridge - Roseburg)

Effective July 19, 2017, this section of I-5 will be restricted to 17 feet 00 in. in width between the hours of 8 PM & 6 AM. Estimated date of completion is August 25, 2017.

I-5 MP 150 to MP 152 NB (Yoncalla)

Effective April 28, 2017, this section of I-5 northbound will be restricted to 11 feet 00 in. in width between the hours of 7 PM & 7 AM. Estimated date of completion is June 20, 2017.

I-5 MP 150.79 SB (Yoncalla)

Effective April 3, 2017, this section of I-5 southbound will be restricted to 15 feet 00 in. in width between the hours of 7 PM & 7 AM. Mobile homes with eaves are allowed, provided the base width does not exceed 15 feet 00 in. in width. Loads wider than 15 feet 00 in. in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is August 31, 2017.

I-5 MP 154 to MP 163 NB & SB (Anlauf)

Effective January 2, 2017, this section of I-5 will be restricted to 16 feet 00 in. in width. Loads wider than 16 feet 00 in. in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is November 22, 2017.

I-5 NB on-ramp from Scotts Valley Rd (Anlauf)

Effective May 30, 2017, the ramp from Scotts Valley Rd to I-5 northbound will be intermittently closed between the hours of 5 PM & 10 AM. Estimated date of completion is July 31, 2017.

I-5 MP 156.65 NB & SB (crossing under Cox Rd - Anlauf)

Effective January 2, 2017, this section of I-5 will be restricted to 16 feet 07 in. in height. Estimated date of completion is November 22, 2017.

I-5 NB Exit 160 on- and off-ramp to/from Salt Spring Rd (Anlauf)

Effective May 30, 2017, the I-5 northbound Exit 160 on- and off-ramps to/from Salt Springs Rd will be intermittently closed between the hours of 5 PM & 10 AM. Estimated date of completion is July 31, 2017.

I-5 NB Exit 161 ramp to Anlauf/Lorane -- NEW --

Effective July 16, 2017, the ramp from I-5 northbound Exit 161 to Anlauf/Lorane will be intermittently closed. Estimated date of completion is August 18, 2017.

I-5 SB on-ramp from OR38/OR99 EB (Drain)

Effective May 30, 2017, the ramp from OR38/OR99 eastbound to I-5 southbound will be intermittently closed between the hours of 5 PM & 10 AM. Estimated date of completion is July 31, 2017.

I-5 MP 163 to MP 164 NB & SB (Curtin)

Effective June 15, 2017, this section of I-5 will be restricted to 12 feet 00 in. in width between the hours of 7 PM & 7 AM. Estimated date of completion is June 29, 2017.

I-5 MP 164 to MP 165 NB & SB (Anlauf)

Effective June 1, 2017, this section of I-5 will be restricted to 14 feet 00 in. in width between the hours of 7 PM & 7 AM. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Estimated date of completion is June 29, 2017.

I-5 MP 216 to MP 222 NB & SB (Halsey)

Effective June 19, 2017 this section of I-5 will be restricted to 16 feet 00 in. in width between the hours of 9 PM & 5:30 AM. Estimated date of completion is September 15, 2017.

I-5 MP 239.35 NB (north of Albany)

Effective July 24, 2017, this section of I-5 northbound will be restricted to 17 feet 06 in. in width between the hours of 9 PM & 5:30 AM. Estimated date of completion is July 28, 2017.

I-5 NB & SB Exit 244 off-ramps to Jefferson Hwy (south of Salem)

Effective August 7, 2017, the I-5 northbound and southbound off-ramps to Jefferson Hwy will be closed between the hours of 6 AM & 6 PM. Estimated date of completion is August 7, 2017.

I-5 SB Exit 256 ramp to Market St (Salem) -- NEW --

Effective June 26, 2017, the ramp from I-5 southbound Exit 256 to Market St will be intermittently closed between the hours of 9 PM & 5 AM. Estimated date of completion is July 21, 2017.

I-5 MP 256 to MP 258 NB & SB (Salem)

Effective June 19, 2017, this section I-5 will be restricted to 20 feet 00 in. in width between the hours of 9 PM & 5 AM. Estimated date of completion is September 15, 2017.

I-5 NB on ramp from Market St (Salem) -- NEW --

Effective June 26, 2017, the ramp from Market St to I-5 northbound will be intermittently closed between the hours of 9 PM & 5 AM. Estimated date of completion is July 21, 2017.

I-5 MP 270.50 to MP 283.01 NB & SB (Woodburn to Wilsonville)

Effective July 5, 2017, this section of I-5 will be restricted to 15 feet 00 in. in width on Sunday to Thursday nights between the hours of 9 PM & 5 AM. Estimated date of completion is September 29, 2017.

I-5 MP 270.50 to MP 283.01 NB & SB (Woodburn to Wilsonville)

Effective July 5, 2017, this section of I-5 will be restricted to 17 feet 01 in. in height southbound, and 16 feet 09 in. in height northbound, on Sunday to Thursday nights between the hours of 9 PM & 5 AM. Estimated date of completion is September 29, 2017.

I-5 SB Exit 271 ramp to OR214 and OR219 (Woodburn)

Effective July 16, 2017, the ramp from I-5 southbound Exit 271 to OR214 and OR219 will be intermittently closed on Sunday to Thursday nights between the hours of 9 PM & 5 AM. Estimated date of completion is July 21, 2017.

I-5 SB Exit 278 on- and off-ramps to/from Ehlen Rd (Aurora)

Effective June 25, 2017, the I-5 southbound Exit 278 on- and off-ramps to/from Ehlen Rd will be intermittently closed between the hours of 9 PM & 5 AM. Estimated date of completion is June 30, 2017.

I-5 NB on and off-ramps to/from French Prairie Rest Area (south of Wilsonville)

Effective July 9, 2017, the I-5 northbound on- and off-ramps to/from French Prairie Rest Area will be intermittently closed between the hours of 9 PM & 5 AM. Estimated date of completion is July 15, 2017.

I-5 SB on and off-ramps to/from French Prairie Rest Area (south of Wilsonville)

Effective July 16, 2017, the I-5 southbound on- and off-ramps to/from French Prairie Rest Area will be intermittently closed between the hours of 9 PM & 5 AM. Estimated date of completion is July 22, 2017.

I-5 SB on-ramp from Charbonneau District (south of Wilsonville)

Effective July 16, 2017, the ramp from Charbonneau District to I-5 southbound will be intermittently closed between the hours of 9 PM & 5 AM. Estimated date of completion is July 22, 2017.

I-5 NB Exit 282 ramp to Canby (south of Wilsonville)

Effective July 16, 2017, the ramp from I-5 northbound Exit 282 to Canby will be intermittently closed between the hours of 9 PM & 5 AM. Estimated date of completion is July 22, 2017.

I-5 SB Exit 282B ramp to Charbonneau District (south of Wilsonville)

Effective July 16, 2017, the ramp from I-5 southbound Exit 282B to Charbonneau District will be intermittently closed between the hours of 9 PM & 5 AM. Estimated date of completion is July 22, 2017.

I-5 NB Exit 289 off-ramp to Nyberg Rd (Tualatin)

Effective August 7, 2017, the ramp from I-5 northbound Exit 289 to Nyberg Rd will be intermittently closed between the hours of 10 PM & 5:30 AM. Estimated date of completion is August 11, 2017.

I-5 NB on-ramp from Nyberg Rd EB (Tualatin)

Effective August 7, 2017, the ramp from Nyberg Rd eastbound to I-5 northbound will be intermittently closed between the hours of 10 PM & 5:30 AM. Estimated date of completion is August 11, 2017.

Carman Dr crossing over I-5 (Tualatin)

Effective August 7, 2017, Carman Dr crossing over I-5 will be intermittently closed between the hours of 10 PM & 5:30 AM. This closure is NOT on the I-5 mainline. Estimated date of completion is August 11, 2017.

I-5 NB Truck Ramp (Portland)

Effective August 6, 2017, the I-5 northbound Truck Ramp will be intermittently closed between the hours of 7 PM & 9 AM. All traffic will be directed to stay on the I-5 mainline. Estimated date of completion is August 15, 2017.

I-5 MP 294.23 to MP 293.80 SB (Portland)

Effective August 8, 2017, this section of I-5 southbound will be restricted to 13 feet 00 in. in width, per the following schedule: Sunday to Friday nights between the hours of 9 PM & 5 AM; Saturday nights between the hours of 9 PM & 8 AM. Estimated date of completion is August 15, 2017.

I-5 SB Exit 294 ramp to OR99W (Portland)

Effective August 8, 2017, the ramp from I-5 southbound Exit 294 to OR99W will be intermittently closed between the hours of 7 PM & 9 AM. Estimated date of completion is August 15, 2017.

I-5 NB on-ramp from Barbur Blvd (near Exit 294 - Portland)

Effective August 6, 2017, the ramp from Barbur Blvd to I-5 northbound near Exit 294 will be intermittently closed between the hours of 7 PM & 9 AM. Estimated date of completion is August 15, 2017.

I-5 NB Exit 297 ramp to Terwilliger Blvd (Portland)

Effective August 7, 2017, the ramp from I-5 northbound Exit 297 to Terwilliger Blvd will be intermittently closed between the hours of 10 PM & 5:30 AM. Estimated date of completion is August 11, 2017.

I-5 NB on-ramp from Barbur Blvd (near Exit 297 - Portland) -- NEW --

Effective August 7, 2017, the ramp from Barbur Blvd to I-5 northbound near Exit 297 will be intermittently closed between the hours of 10 PM & 5:30 AM. Estimated date of completion is August 11, 2017.

I-5 MP 301 to MP 302 NB & SB (Portland)

Effective June 8, 2017, this section of I-5 will be restricted to 14 feet 00 in. in width between the hours of 10 PM & 5 AM. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Estimated date of completion is October 27, 2017.

I-5 MP 301 to MP 302 NB & SB (Portland)

Effective June 8, 2017, this section of I-5 will be restricted to 14 feet 06 in. in height southbound, and 16 feet 01 in. in height northbound, between the hours of 10 PM & 5 AM. Estimated date of completion is October 27, 2017.

I-5 NB on-ramp from the Morrison Bridge (Portland)

Effective June 8, 2017, the ramp from the Morrison Bridge to I-5 northbound will be intermittently closed per the following schedule: Sunday to Thursday nights between the hours of 10 PM & 5 AM; Friday and Saturday nights between the hours of 11 PM & 8 AM. Estimated date of completion is October 27, 2017.

I-5 SB Exit 300B ramp to OR99E/Oregon City/OMSI (Portland)

Effective June 8, 2017, the ramp from I-5 southbound Exit 300B to OR99E/Oregon City/OMSI will be intermittently closed per the following schedule: Sunday to Thursday nights between the hours of 10 PM & 5 AM; Friday and Saturday nights between the hours of 11 PM & 8 AM. Estimated date of completion is October 27, 2017.

I-5 SB on-ramp from Wheeler St (Portland)

Effective June 8, 2017, the ramp from Wheeler St to I-5 southbound will be intermittently closed per the following schedule: Sunday to Thursday nights between the hours of 10 PM & 5 AM; Friday and Saturday nights between the hours of 11 PM & 8 AM. Estimated date of completion is October 27, 2017.

I-5 NB Exit 302C ramp to Greeley Ave/Swan Island (Portland)

Effective August 7, 2017, the ramp from I-5 northbound Exit 302C to Greeley Ave/Swan Island will be intermittently closed between the hours of 10 PM & 5:30 AM. Estimated date of completion is August 11, 2017.

I-5 MP 306.6 to MP 307.6 NB (Portland)

Effective August 7, 2017, this section of I-5 northbound will be restricted to 14 feet 00 in. in width between the hours of 10 PM & 5:30 AM. Estimated date of completion is August 11, 2017.

I-5 MP 306.6 to MP 307.6 NB (Portland)

Effective August 7, 2017, this section of I-5 northbound will be restricted to 18 feet 04 in. in height between the hours of 10 PM & 5:30 AM. Estimated date of completion is August 11, 2017.

I-5 NB Exit 307 ramp to OR99E (Portland)

Effective August 7, 2017, the ramp from I-5 northbound Exit 307 to OR99E will be intermittently closed between the hours of 10 PM & 5:30 AM. Estimated date of completion is August 11, 2017.

I-82 MP 0.00 NB & SB (Columbia River Bridge - Umatilla)

Effective June 12, 2017, this section of I-82 will be restricted to 16 feet 00 in. in width. Load wider than 16 feet 00 in. in width may be accommodated on a case-by-case basis. Contact Washington DOT at 360-704-3640 for additional information. Estimated date of completion is September 28, 2018.

I-84 MP 0 to MP 2 EB (Portland)

Effective June 1, 2017, this section of I-84 eastbound will be restricted to 13 feet 00 in. in width on Sunday to Thursday nights between the hours of 10 PM & 5 AM. Estimated date of completion is October 31, 2017.

I-84 MP 0 to MP 2 EB (Portland)

Effective June 1, 2017, this section of I-84 eastbound will be restricted to 15 feet 07 in. in height on Sunday to Thursday nights between the hours of 10 PM & 5 AM. Estimated date of completion is October 31, 2017.

I-84 WB to I-5 NB Ramp

Effective June 26, 2017, the ramp from I-84 westbound to I-5 northbound will be intermittently closed per the following schedule: Sunday through Thursday nights between the hours of 10 PM & 5 AM; Friday & Saturday nights between the hours of 11 PM & 8 AM. Estimated date of completion is October 27, 2017.

I-84 EB on-ramp from the Morrison Bridge (Portland)

Effective June 8, 2017, the ramp from the Morrison Bridge to I-84 eastbound will be intermittently closed per the following schedule: Sunday to Thursday nights between the hours of 10 PM & 5 AM; Friday and Saturday nights between the hours of 11 PM & 8 AM. Estimated date of completion is October 27, 2017.

I-84 MP 5 to MP 1 WB (Portland)

Effective July 12, 2017, this section of I-84 westbound will be restricted to 13 feet 00 in. in width between the hours of 10 PM & 5 AM. Estimated date of completion is October 31, 2017.

I-84 MP 5 to MP 1 WB (Portland)

Effective July 12, 2017, this section of I-84 westbound will be restricted to 15 feet 09 in. in height between the hours of 10 PM & 5 AM. Estimated date of completion is October 31, 2017.

I-84 MP 2 to MP 3 EB (Portland)

Effective June 1, 2017, this section of I-84 eastbound will be restricted to 14 feet 00 in. in width on Sunday to Thursday nights between the hours of 10 PM & 5 AM. Estimated date of completion is October 31, 2017.

I-84 MP 2 to MP 3 EB (Portland)

Effective June 1, 2017, this section of I-84 eastbound will be restricted to 15 feet 07 in. in height on Sunday to Thursday nights between the hours of 10 PM & 5 AM. Estimated date of completion is October 31, 2017.

I-84 MP 3 to MP 4 EB (Portland)

Effective June 1, 2017, this section of I-84 eastbound will be restricted to 13 feet 00 in. in width on Sunday to Thursday nights between the hours of 10 PM & 5 AM. Estimated date of completion is October 1, 2017.

I-84 MP 3 to MP 4 EB (Portland)

Effective June 1, 2017, this section of I-84 eastbound will be restricted to 16 feet 02 in. in height on Sunday to Thursday nights between the hours of 10 PM & 5 AM. Estimated date of completion is October 1, 2017.

I-84 MP 5 to MP 6 EB (Portland)

Effective June 1, 2017, this section of I-84 eastbound will be restricted to 17 feet 00 in. in width on Sunday to Thursday nights between the hours of 10 PM & 5 AM. Estimated date of completion is October 31, 2017.

I-84 MP 5 to MP 6 EB (Portland)

Effective June 1, 2017, this section of I-84 eastbound will be restricted to 16 feet 07 in. in height on Sunday to Thursday nights between the hours of 10 PM & 5 AM. Estimated date of completion is October 31, 2017.

I-84 MP 6 to MP 5 WB (Portland)

Effective August 1, 2017, this section of I-84 westbound will be restricted to 19 feet 00 in. in width, per the following schedule: Monday to Thursday nights between the hours of 8 PM & 5 AM; Friday nights between the hours of 8 PM & 7 AM. Estimated date of completion is October 31, 2017.

I-84 EB on-ramp from 181st Ave (Gresham)

Effective June 19, 2017, the I-84 eastbound on-ramp from 181st Ave will be intermittently closed between the hours of 10 PM & 6 AM. Estimated date of completion is July 1, 2017.

I-84 EB Exit 14 ramp to Fairview Parkway (Gresham)

Effective June 19, 2017, the ramp from I-84 eastbound Exit 14 to Fairview Parkway will be intermittently closed between the hours of 10 PM & 6 AM. Estimated date of completion is July 1, 2017.

I-84 MP 17.5 to MP 21.0 EB & WB (east of Troutdale) -- NEW --

Effective August 9, 2017, this section of I-84 will be restricted to 21 feet 00 in. in width between the hours of 8 PM & 10 AM. Estimated date of completion is September 30, 2017.

I-84 MP 41.25 EB (Tooth Rock Tunnel - Cascade Locks)

Effective August 11, 2017, this section of I-84 eastbound will be restricted to 12 feet 00 in. in width between the hours of 9 PM & 5 AM. Estimated date of completion is August 13, 2017.

I-84 MP 41.25 EB (Tooth Rock Tunnel - Cascade Locks)

Effective August 11, 2017, this section of I-84 eastbound will be restricted to 14 feet 08 in. in height between the hours of 9 PM & 5 AM. Estimated date of completion is August 13, 2017.

I-84 EB & WB Exit 56 on- and off-ramps to/from Viento State Park

Effective August 14, 2017, the I-84 eastbound and westbound Exit 56 on- and off-ramps to/from Viento State Park will be restricted to 19 feet 00 in. in width between the hours of 8 PM & 8 AM. Estimated date of completion is August 25, 2017.

I-84 MP 56.04 EB & WB (Viento State Park)

Effective August 14, 2017, this section of I-84 will be closed between the hours of 8 PM & 8 AM. When closed, all traffic will be directed to take the Exit 56 off-ramp and re-enter I-84. Estimated date of completion is August 25, 2017.

I-84 MP 114.6 EB (east of Rufus)

Effective July 31, 2017, this section of I-84 eastbound will be restricted to 15 feet 00 in. in width on Monday to Thursday between the hours of 6 AM & 5 PM. Mobile homes with eaves are allowed, provided the base width does not exceed 15 feet 00 in. in width. Loads wider than 15 feet 00 in. in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is August 10, 2017.

I-84 MP 114.6 EB & WB (east of Rufus) -- NEW --

Effective August 14, 2017, this section of I-84 will be restricted to 16 feet 00 in. in width between the hours of 7 AM & 7 PM. Wider loads may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is October 13, 2017.

I-84 MP 114.6 EB & WB (east of Rufus) -- NEW --

Effective August 14, 2017, this section of I-84 will be restricted to 12 feet 00 in. in width between the hours of 7 PM & 7 AM. Wider loads may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is October 13, 2017.

I-84 MP 260.26 to MP 270.79 EB & WB (La Grande)

Effective July 24, 2017, this section of I-84 will be restricted to 16 feet 00 in. in width between the hours of 8 AM & 5 PM. Loads wider than 16 feet 00 in. in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is July 27, 2017.

I-84 MP 260.26 to MP 270.79 EB & WB (La Grande)

Effective July 24, 2017, this section of I-84 will be restricted to 16 feet 08 in. in height eastbound, and 16 feet 06 in. in height westbound, between the hours of 8 AM & 5 PM. Estimated date of completion is July 27, 2017.

I-84 MP 284 to MP 297 EB & WB (west of Baker City)

Effective April 25, 2017, this section of I-84 will be restricted to 18 feet 00 in. in width. Estimated date of completion is October 31, 2017.

I-84 MP 284 to MP 297 EB & WB (west of Baker City)

Effective April 25, 2017, this section of I-84 will be restricted to 17 feet 00 in. in height eastbound, and 16 feet 11 in. in height westbound. Estimated date of completion is October 31, 2017.

I-84 MP 313.0 to MP 318.5 EB & WB (east of Baker City)

Effective April 3, 2017, this section of I-84 will be restricted to 16 feet 00 in. in width. Loads wider than 16 feet 00 in. in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is September 22, 2017.

I-205 MP 0 to MP 6.42 NB & SB

Effective December 19, 2016, this section of I-205 is restricted to 19 feet 00 in. in width between the hours of 8 PM & 8 AM. Estimated date of completion is August 11, 2017.

I-205 MP 0.99 to MP 8.82 NB & SB (Tualatin to West Linn)

Effective July 9, 2017, this section of I-205 will be restricted to 13 feet 00 in. in width at the following times: Sunday to Thursday nights between the hours of 10 PM & 5 AM; Friday nights between the hours of 11 PM & 7 AM; Saturday nights between the hours of 11 PM & 8 AM. Estimated date of completion is October 31, 2017.

I-205 NB & SB Exit 3 on- and off-ramps to/from Stafford Rd (Lake Oswego) -- NEW --

Effective July 23, 2017, the I-205 northbound and southbound Exit 3 on- and off-ramps to/from Stafford Rd will be intermittently closed per the following schedule: Sunday to Thursday nights between the hours of 9 PM & 5 AM; Friday nights between the hours of 9 PM & 7 AM; Saturday nights between the hours of 9 PM & 8 AM. Estimated date of completion is September 30, 2017.

I-205 NB & SB Exit 6 on- and off-ramps to/from 10th St (West Linn) -- NEW --

Effective July 23, 2017, the I-205 northbound and southbound Exit 6 on- and off-ramps to/from 10th St will be intermittently closed per the following schedule: Sunday to Thursday nights between the hours of 9 PM & 5 AM; Friday nights between the hours of 9 PM & 7 AM; Saturday nights between the hours of 9 PM & 8 AM. Estimated date of completion is September 30, 2017.

I-205 NB & SB Exit 8 on- and off-ramps to/from OR43 (West Linn) -- NEW --

Effective July 23, 2017, the I-205 northbound and southbound Exit 8 on- and off-ramps to/from OR43 will be intermittently closed per the following schedule: Sunday to Thursday nights between the hours of 9 PM & 5 AM; Friday nights between the hours of 9 PM & 7 AM; Saturday nights between the hours of 9 PM & 8 AM. Estimated date of completion is September 30, 2017.

I-205 MP 13.0 to MP 16.3 NB & SB (Clackamas)

Effective February 13, 2017, this section of I-205 will be restricted to 17 feet 00 in. in height at the following times: Sunday to Thursday nights between the hours of 8 PM & 5:30 AM; Friday nights between the hours of 8 PM & 8 AM. Estimated date of completion is September 30, 2017.

I-205 SB Exit 21B to I-84 WB (Portland)

Effective August 3, 2017, the ramp from I-205 southbound Exit 21B to I-84 westbound will be intermittently closed, per the following schedule: Monday to Thursday nights between the hours of 8 PM & 5 AM; Friday nights between the hours of 8 PM & 7 AM. Estimated date of completion is August 10, 2017.

U.S. Routes

US20 MP 13.14 to MP 13.45 EB & WB (Lebanon) -- NEW --

Effective July 28, 2017, this section of US20 will be closed between the hours of 3 PM & 10 PM for one day only.

US20 MP 0.00 to MP 14.96 EB & WB (Sisters to Tumalo)

Effective June 12, 2017, this section of US20 will be restricted to 12 feet 00 in. in width on Sunday to Thursday nights between the hours of 8 PM & 7 AM. Estimated date of completion is September 15, 2017.

US26 MP 0.59 EB & WB (Ross Island Bridge - Portland)

Effective February 28, 2017, this section of US26 will be restricted to 12 feet 00 in. in width between the hours of 9 PM & 5 AM. Estimated date of completion is August 31, 2017.

US26 MP 53.00 to MP 57.15 EB & WB (North Plains)

Effective May 22, 2017, this section of US26 will be restricted to 11 feet 00 in. in width between the hours of 8 PM & 6 AM. Estimated date of completion is September 15, 2017.

US26 MP 53.00 to MP 57.15 EB & WB (North Plains)

Effective May 22, 2017, this section of US26 will be restricted to 16 feet 07 in. in height between the hours of 8 PM & 6 AM. Estimated date of completion is September 15, 2017.

US26 EB ramp to OR6 WB (Banks)

Effective June 29, 2017, the ramp from US26 eastbound to OR6 westbound will be intermittently closed per the following schedule: Monday through Thursday nights between the hours of 8 PM & 5 AM; Friday nights between the hours of 9 PM & 8 AM; Saturday nights between the hours of 9 PM & 9 AM; Sunday nights between the hours of 9 PM & 5 AM. Estimated date of completion is July 21, 2017.

US26 WB ramp to OR6 WB (Banks)

Effective June 29, 2017, the ramp from US26 westbound to OR6 westbound will be intermittently closed per the following schedule: Monday through Thursday nights between the hours of 8 PM & 5 AM; Friday nights between the hours of 9 PM & 8 AM; Saturday nights between the hours of 9 PM & 9 AM; Sunday nights between the hours of 9 PM & 5 AM. Estimated date of completion is July 21, 2017.

US26 WB ramp to OR6 WB (Banks)

Effective July 23, 2017, the ramp from US26 westbound to OR6 westbound will be closed at all hours. Estimated date of completion is July 28, 2017.

US26 EB & WB Exit 55 on- and off-ramps to/from Dersham Rd (Banks)

Effective June 29, 2017, the US26 eastbound and westbound Exit 55 on- and off-ramps to/from Dersham Rd will be intermittently closed per the following schedule: Monday through Thursday nights between the hours of 8 PM & 5 AM; Friday nights between the hours of 9 PM & 8 AM; Saturday nights between the hours of 9 PM & 9 AM; Sunday nights between the hours of 9 PM & 5 AM. Estimated date of completion is July 21, 2017.

US26 MP 62.02 to MP 65.13 EB & WB (Hillsboro)

Effective October 31, 2016, this section of US26 will be restricted to 10 feet 00 in. in width between the hours of 10 PM & 5 AM. Estimated date of completion is October 31, 2017.

US26 MP 62.02 to MP 65.13 EB & WB (Hillsboro)

Effective October 31, 2016, this section of US26 will be restricted to 14 feet 00 in. in width on Saturdays from 1/2 hr before sunrise until 8 AM, and on Sundays from 1/2 hr before sunrise until 9 AM. Estimated date of completion is October 31, 2017.

US26 WB Exit 62A to Cornelius Pass Rd SB (Hillsboro)

Effective March 3, 2017, the ramp from US26 westbound Exit 62A to Cornelius Pass Rd southbound is closed to all single-trip oversize/overweight permits. Estimated date of completion is December 15, 2017.

US26 MP 161.88 to MP 162.36 EB & WB (John Day) -- NEW --

Effective August 12, 2017, this section of US26 will be closed between the hours of 10 AM & 11 AM for one day only.

US30 Bypass MP 1.32 to MP 1.85 EB & WB (Portland)

Effective June 23, 2017, this section of US30 Bypass will be restricted to 12 feet 00 in. in width. Loads wider than 12 feet 00 in. in width can be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is December 1, 2017.

US30 MP 51.56 to MP 51.98 NB & SB (Baker City)

Effective August 5, 2017, this section of US30 will be closed between the hours of 10 AM & 12 noon for one day only.

US30 MP 1.58 to MP 2.10 EB & WB (La Grande)

Effective August 4, 2017, this section of US30 will be closed between the hours of 4 PM & 8 PM for one day only.

US97 MP 273.5 to MP 279.5 NB & SB (Klamath Falls)

Effective January 18, 2017, this section of US97 will be restricted to 16 feet 07 in. in height northbound, and 19 feet 06 in. in height southbound, between the hours of 8 AM & 4 PM. Estimated date of completion is January 26, 2017.

US101 MP 211.21 NB & SB (Umpqua River Bridge - Reedsport)

Effective January 25, 2016, this section of US101 will be restricted to 11 feet 06 in. in width on Monday to Thursday nights between the hours of 7 PM & 7 AM. Estimated date of completion is September 1, 2017.

US101 MP 211.21 NB & SB (Umpqua River Bridge - Reedsport)

Effective January 25, 2016, this section of US101 will be restricted to 14 feet 00 in. in width on Monday to Thursday between the hours of 7 AM & 7 PM. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Loads wider than 14 feet 00 in. in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is September 1, 2017.

US101 MP 233.99 (McCullough Bridge - Coos Bay)

Effective October 15, 2013, this section of US101 will be restricted to 11 feet 00 in. in width between the hours of 9 PM & 5 AM. Estimated date of completion is November 1, 2018.

US101 MP 311.4 NB & SB (south of Port Orford)

Effective April 2, 2017, this section of US101 will be restricted to 14 feet 00 in. in width from Sunday at midnight to Friday at 3 PM. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Estimated date of completion is August 5, 2017.

US101 MP 347.78 NB & SB (north of Brookings)

Effective July 31, 2017, this section of US101 will be restricted to 16 feet 00 in. in width. Estimated date of completion is August 31, 2019.

OR Routes

OR7 MP 0.00 to MP 0.24 EB & WB (Baker City)

Effective August 5, 2017, this section of OR7 will be closed between the hours of 10 AM & 12 noon for one day only.

OR8 MP 3.82 EB & WB (Beaverton) -- NEW --

Effective August 16, 2017, this section of OR8 will be restricted to 14 feet 00 in. in width between the hours of 8 PM & 5 AM. Estimated date of completion is August 18, 2017.

OR22/OR99E Business MP 5.52 to MP 6.20 EB & WB (Salem) -- NEW --

Effective August 12, 2017, this section of OR22/OR99E Business will be closed between the hours of 7:30 AM & 9 AM for one day only.

OR47 MP 88.05 NB & SB (Forest Grove)

Effective September 27, 2016, this section of OR47 is restricted to 14 feet 00 inches in width and 135 feet overall length. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 in. in width. Loads wider than 14 feet or 135 feet overall length may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information.

OR47 MP 90.56 to MP 90.64 NB & SB (Forest Grove)

Effective May 1, 2017, this section of OR47 will be restricted to 16 feet 00 in. in width. Estimated date of completion is August 18, 2017.

OR47 MP 90.64 SB (Forest Grove) -- NEW --

Effective July 24, 2017, this section of OR47 southbound will be closed on Monday to Friday between the hours of 9 AM & 3 PM. Estimated date of completion is July 28, 2017.

OR53 MP 0.58 NB & SB (south of US26)

Effective July 18, 2017, this section of OR53 will be restricted to 14 feet 00 in. in width. Estimated date of completion is August 29, 2017.

OR62 MP 0 to MP 1 EB & WB (Medford)

Effective May 16, 2017, this section of OR62 will be restricted 17 feet 06 in. in width between the hours of 7 PM & 7 AM. Estimated date of completion is June 11, 2017.

OR82 MP 71.28 to MP 71.42 NB & SB (Joseph)

Effective July 28, 2017, this section of OR82 will be closed between the hours of 7 AM and 12 noon for a parade. In addition, effective July 29, 2017, this section of OR82 will be closed between the hours of 7 AM and 12 noon for a parade.

OR99W MP -0.36 NB & SB (Steel Bridge - Portland) -- NEW --

Effective August 11, 2017, the upper deck of the Steel Bridge will be intermittently closed between the hours of 1 AM & 5 AM. Estimated date of completion is August 12, 2017.

OR99E (McLoughlin Blvd) MP 3.07 to MP 4.49 SB (Milwaukie)

Effective July 3, 2017, this section of OR99E southbound will be restricted to 8 feet 06 in. in width per the following schedule: Monday to Thursday nights between the hours of 8 PM & 5 AM; Friday nights at 8 PM until Monday morning at 5 AM. Estimated date of completion is October 15, 2017.

OR99E (McLoughlin Blvd) MP 4.49 to MP 3.07 NB (Milwaukie)

Effective July 3, 2017, this section of OR99E northbound will be restricted to 8 feet 06 in. in width per the following schedule: Sunday to Thursday nights between the hours of 7 PM & 5 AM; Friday nights at 7 PM until Monday morning at 5 AM. Estimated date of completion is October 15, 2017.

OR99E (McLoughlin Blvd) MP 4.78 to MP 3.07 NB (Milwaukie)

Effective July 7, 2017, this section of OR99E northbound will be closed on weekends from Friday at 10 PM until Monday at 5 AM. No closures will take place the weekends of August 11-14, and August 25-28. Estimated date of completion is September 1, 2017.

OR99E (McLoughlin Blvd) MP 3.07 to MP 4.49 NB & SB (Milwaukie)

Effective July 3, 2017, this section of OR99E will be restricted to 17 feet 01 in. in height per the following schedule: Sunday to Thursday nights between the hours of 7 PM & 5 AM; Friday nights at 7 PM until Monday morning at 5 AM. Estimated date of completion is October 15, 2017.

OR99E (McLoughlin Blvd) MP 4.78 to MP 3.07 NB (Milwaukie)

Effective July 24, 2017, this section of OR99E northbound will be restricted to 8 feet 06 in. in width at all hours. Loads wider than 8 feet 06 in. in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is August 4, 2017.

OR99E (McLoughlin Blvd) SB on- and off-ramps to/from Bybee Blvd (Milwaukie)

Effective July 5, 2017, the OR99E southbound ramps to/from Bybee Blvd will be closed at the following times: Monday to Thursday nights between the hours of 8 PM & 5 AM; Friday nights between the hours of 8 PM & 7 AM; Saturday nights between the hours of 7 PM & 8 AM; Sunday nights between the hours of 7 PM & 5 AM. Estimated date of completion is October 15, 2017.

OR99E (McLoughlin Blvd) NB & SB ramps to/from Tacoma St (Milwaukie)

Effective June 19, 2017, the OR99E northbound and southbound ramps to/from Tacoma St will be closed at the following times: Monday to Thursday nights between the hours of 8 PM & 5 AM; Friday nights between the hours of 8 PM & 7 AM; Saturday nights between the hours of 7 PM & 8 AM; Sunday nights between the hours of 7 PM & 5 AM. Estimated date of completion is July 15, 2017.

OR99E SB ramp to OR224 EB (Milwaukie)

Effective June 19, 2017, the ramp from OR99E southbound to OR224 eastbound will be restricted to 14 feet 00 in. in width per the following schedule: Sunday to Thursday nights between the hours of 7 PM & 5:30 AM; Friday nights between the hours of 7 PM & 9 AM; Saturday nights between the hours of 7 PM & 10 AM. Estimated date of completion is July 22, 2017.

OR99E SB ramp to OR224 EB (Milwaukie)

Effective July 3, 2017, the ramp from OR99E southbound to OR224 eastbound will be closed per the following schedule: Sunday to Thursday nights between the hours of 9 PM & 5 AM; Friday nights between the hours of 9 PM & 7 AM; Saturday nights between the hours of 9 PM & 10 AM. Estimated date of completion is July 22, 2017.

OR99E MP 22.03 NB (Molalla River Bridge - Canby)

Effective July 18, 2017, this section of OR99E northbound will be intermittently closed between the hours of 7 PM & 6 AM. Estimated date of completion is July 29, 2017.

OR99W MP 103.68 NB & SB (north of Junction City)

Effective April 24, 2017, this section of OR99W will be restricted to 15 feet 00 in. in width. Mobile homes with eaves are allowed, provided the base width does not exceed 15 feet 00 in. in width. Loads wider than 15 feet 00 in. in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is October 13, 2017.

OR138 MP 3.5 to MP 4.5 NB & SB (south of Elkton)

Effective April 28, 2017, this section of OR138 will be restricted to 12 feet 00 in. in width between the hours of 7 PM & 7 AM. Estimated date of completion is June 20, 2017.

OR138 MP 5.5 to MP 7.0 NB & SB (south of Elkton)

Effective April 28, 2017, this section of OR138 will be restricted to 9 feet 00 in. in width between the hours of 7 PM & 7 AM. Estimated date of completion is June 20, 2017.

OR140 MP 3.37 to MP 3.87 EB & WB (Klamath Falls)

Effective July 25, 2017 at 5 AM, this section of OR140 will be closed. Estimated date of completion is July 27, 2017 at 7 PM.

OR155 (Ferry St) MP 8.58 to MP 9.19 EB & WB (Dayton) -- NEW --

Effective July 28, 2017, this section of OR155 (Ferry St) will be closed between the hours of 5:45 PM & 7:15 PM for one day only.

OR203/OR237 MP 16.32 to MP 16.71 NB & SB (Union) -- NEW --

Effective August 12, 2017, this section of OR203/OR237 will be closed between the hours of 7 AM & 10:30 PM for one day only.

OR213 (82nd Dr) MP 6.18 to MP 6.24 NB & SB (Portland)

Effective July 31, 2017, this section of OR213 (82nd Dr) will be restricted to 10 feet 00 in. in width between the hours of 8 PM & 5 AM. Estimated date of completion is September 30, 2017.

OR213 (82nd Ave) MP 7.23 to MP 8.23 NB & SB (Clackamas)

Effective March 30, 2017, this section of OR213 (82nd Ave) will be restricted to 14 feet 00 in. in width on Monday to Friday between the hours of 9 AM & 3 PM, and between the hours of 9 PM & 5 AM. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Loads wider than 14 feet 00 in. in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is July 30, 2017.

OR213 MP 9.14 to MP 10.90 SB (Mulino)

Effective July 3, 2017, this section of OR213 southbound will be restricted to 9 feet 00 in. in width. Estimated date of completion is December 31, 2017.

OR213 MP 10.90 to MP 9.14 NB (Mulino)

Effective July 3, 2017, this section of OR213 northbound will be restricted to 12 feet 00 in. in width. Estimated date of completion is December 31, 2017.

OR214 WB ramp to I-5 NB (Woodburn)

Effective July 23, 2017, the ramp from OR214 westbound to I-5 northbound will be intermittently closed on Sunday to Thursday nights between the hours of 9 PM & 5 AM. Estimated date of completion is July 28, 2017.

Kruse Way EB crossing over I-5 (Tigard)

Effective August 7, 2017, Kruse Way eastbound crossing over I-5 will be closed between the hours of 10 PM & 5:30 AM. Estimated date of completion on August 11, 2017.

Kruse Way WB ramp to I-5 SB (Tigard)

Effective August 7, 2017, the ramp from Kruse Way westbound to I-5 southbound will be closed between the hours of 10 PM & 5:30 AM. Estimated date of completion is August 11, 2017.

OR219 EB ramp to I-5 NB (Woodburn)

Effective July 23, 2017, the ramp from OR219 eastbound to I-5 northbound will be intermittently closed on Sunday to Thursday nights between the hours of 9 PM & 5 AM. Estimated date of completion is July 28, 2017.

OR221 (3rd St) MP 0.34 to MP 0.48 NB & SB (Dayton) -- NEW --

Effective July 28, 2017, this section of OR221 (3rd St) will be closed between the hours of 5:45 PM & 7:15 PM for one day only.

OR223 MP 2.91 to MP 3.56 NB & SB (Dallas) -- NEW --

Effective July 29, 2017, this section of OR223 will be closed between the hours of 8 AM & 2 PM for one day only.

OR224 WB ramp to OR99E NB (Milwaukie)

Effective July 3, 2017, the ramp from OR224 westbound to OR99E northbound will be restricted to 13 feet 00 in. in width per the following schedule: Sunday to Thursday nights between the hours of 7 PM & 5:30 AM; Friday nights between the hours of 7 PM & 9 AM; Saturday nights between the hours of 7 PM & 10 AM. Estimated date of completion is July 22, 2017.

OR229 MP 23.79 to MP 23.93 NB & SB (Siletz) -- NEW --

Effective August 12, 2017, this section of OR229 will be closed between the hours of 10 AM & 11 AM for one day only.

OR351 MP 0.00 to MP 0.47 NB & SB (Joseph)

Effective July 28, 2017, this section of OR351 will be closed between the hours of 7 AM and 12 noon for a parade. In addition, effective July 29, 2017, this section of OR351 will be closed between the hours of 7 AM and 12 noon for a parade.

OR540 (Cape Arago Hwy) MP 10.19 NB & SB (Charleston)

Effective July 5, 2017, this section of OR540 (Cape Arago Hwy) will be restricted to 12 feet 00 in. in width. Estimated date of completion is September 15, 2017.

OR569 MP 3.10 to MP 12.25 EB & WB (Eugene) -- NEW --

Effective August 6, 2017, this section of OR569 will be restricted to 15 feet 07 in. in height eastbound, and 15 feet 06 in. in height westbound, between the hours of 8 PM & 5 AM. Estimated date of completion is August 11, 2017.

OR569 MP 3.10 to MP 12.25 EB & WB (Eugene) -- NEW --

Effective August 6, 2017, this section of OR569 will be restricted to 16 feet 00 in. in width between the hours of 8 PM & 5 AM. Estimated date of completion is August 11, 2017.

Lifted Restrictions

I-5 NB Exit 30 ramp to OR62 (Medford)

Effective April 28, 2017, the ramp from I-5 northbound Exit 30 to OR62 will be intermittently closed between the hours of 7 PM & 7 AM. Estimated date of completion is June 20, 2017.

I-5 MP 249.00 to MP 249.80 NB (Salem)

Effective July 16, 2017, this section of I-5 northbound will be intermittently closed between the hours of 9 PM & 5 AM. All traffic will be directed to take Exit 249 and re-enter I-5 northbound. Estimated date of completion is July 21, 2017.

I-5 NB Exit 292A ramp to OR217 NB (Tigard)

Effective July 22, 2017 at 9 PM, the ramp from I-5 northbound Exit 292A to OR217 northbound will be closed. The ramp is estimated to re-open by 5 AM on July 23, 2017.

US20 MP 18.80 to MP 20.99 EB & WB (Bend)

Effective July 17, 2017, this section of US20 will be restricted to 16 feet 00 in. in width between the hours of 9 PM & 3 AM. Estimated date of completion is July 20, 2017.

US26 MP 111 to MP 117 EB & WB (Madras)

Effective April 27, 2017, this section of US26 will be restricted to 12 feet 00 in. in width on Monday to Thursday nights between the hours of 8 PM & 8 AM. Estimated date of completion is July 31, 2017.

OR39 MP 3 to MP 4 NB & SB (south of Klamath Falls)

Effective July 10, 2017, this section of OR39 will be closed. Estimated date of completion is July 22, 2017.

OR229 MP 30.63 NB & SB (Toledo)

Effective July 23, 2017, this section of OR229 will be restricted to 12 feet 00 in. in width between the hours of 5 AM & 7 AM. Estimated date of completion is July 23, 2017.

BRIDGE RESTRICTIONS

Interstate Routes

I-5 MP 104.85 Chadwick Ln crossing over I-5 (near Riddle)

Chadwick Ln crossing over I-5 is restricted to the following weights: 20,000 single axle, 34,000 lbs. tandem axle - 80,000 lbs. GVW. Weight Table 1.

I-5 MP 151.81 Wilson Rd crossing over I-5 (Yoncalla)

Wilson Rd crossing over I-5 is restricted to the following weights: 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.

I-84 MP 256.42 Upper Perry Interchange crossing over I-84 (Perry)

Upper Perry Interchange crossing over I-84 is restricted to the following weights: 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW, Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.

U.S. Routes

US26 MP 0.59 EB & WB (Ross Island Bridge - Portland)

Effective February 6, 2017, US26 across the Ross Island Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW. Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads. Estimated date of completion is August 31, 2017.

US30 (Historic Columbia River Hwy) MP 0.03 (Sandy River Bridge - Troutdale)

Effective May 3, 2017, US30 (Historic Columbia River Highway) crossing the Sandy River Bridge is restricted to the following weights: 21 tons for Type 3 Vehicles (3-axle single-unit trucks); 19 tons for SU4 Vehicles (4-axle single-unit trucks); 21 tons for SU5, SU6 & SU7 Vehicles (5 to 7 axle single-unit trucks); 26 tons for Type 3S2 (truck tractor/semitrailer) and Type 3-3 (truck and trailer) Vehicles.

US30 (Huntington Hwy) MP 0.46 (Burnt River Bridge - Lime)

Effective June 16, 2011, the Burnt River Bridge near Lime just off I-84 is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.

US30 (Historic Columbia River Hwy) MP 13.14 (Shepperds Dell Bridge)

US30 (Historic Columbia River Hwy) crossing Youngs Creek (Shepperds Dell) Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, Weight Table 1.

US30 (Historic Columbia River Hwy) MP 17.68 (West Multnomah Falls Bridge)

US30 (Historic Columbia River Hwy) crossing West Multnomah Falls Bridge is restricted to 28,000 lbs. for solo vehicles, 44,000 lbs. for 3-2 combinations, and 56,000 lbs. for 3-3 combinations.

US30 (Historic Columbia River Hwy) MP 20.39 (Horsetail Creek Bridge)

US30 (Historic Columbia River Hwy) crossing Horsetail Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, Weight Table 1.

US30 MP 30.42 (Bridge of the Gods - Cascade Locks)

Effective December 24, 2013, the Bridge of the Gods at US30 MP 30.42 is restricted to 80,000 lbs. GVW, Weight Table 1. This bridge belongs to the Port of Cascade Locks.

US30 OR/WA Border at Rainier (Lewis & Clark Bridge)

The Columbia River (Lewis & Clark) Bridge between Rainier, OR and Longview, WA is restricted to 21,500 lbs. per axle, no gross weight restriction. Contact the State of Washington at (360) 704-6340 for current information regarding size restrictions for this bridge.

US101 Business MP 4.78 (Lewis & Clark River Bridge - Astoria)

US101 Business crossing Lewis & Clark River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 80,000 lbs. GVW, Weight Table 1.

US101 Business MP 6.89 (Old Youngs Bay Bridge - Astoria)

Effective November 10, 2009, US101 Business crossing the Old Youngs Bay Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW, Weight Table 2.

US101 MP 40.71 (Neahkahnie Mtn Chasm Bridge - near Manzanita)

Effective November 15, 2004, Neahkahnie Mtn Chasm Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2 for divisible loads.

US101 MP 141.67 (Yaquina Bay Bridge - Newport)

Effective March 1, 2013, the Yaquina Bay Bridge in Newport is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW, Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW, Weight Table 3 for non-divisible loads. Non-divisible loads exceeding these weights (up to Weight Table 5) may cross the bridge if they stop traffic/straddle the centerline and are the only vehicle on the bridge when crossing. Certified flaggers are required to stop both northbound and southbound traffic. The rolling stop method is not allowed.

US101 MP 190.98 (Siuslaw River Bridge - Florence)

Effective March 17, 2003, the Siuslaw River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW. Weight Table 3 for non-divisible loads.

US101 MP 311.40 (Reinhart Creek Bridge - south of Port Orford)

Effective March 1, 2017, US101 crossing the Reinhart Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW, Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW, Weight Table 3 for non-divisible loads. Non-divisible loads exceeding these weights may cross the bridge if they stop oncoming traffic and straddle the centerline. Certified flaggers are required to stop oncoming traffic. Effective May 5, 2017, during construction, on-site certified flaggers may be provided to the carrier at no cost on a case-by-case basis during construction hours. Contact the Over-Dimension Permit Unit for information.

OR Routes

OR18 MP 51.57 (Yamhill River Bridge - Dayton)

OR18 crossing Yamhill River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.

OR22 MP 10.49 (Louie Creek Bridge - Dolph)

OR22 crossing Louie Creek Bridge is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, Weight Table 3 only.

OR22 MP 10.66 (Louie Creek Bridge - Dolph)

OR22 crossing Louie Creek Bridge is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, Weight Table 3 only.

Santiam River Bridge - Mill City (not on OR22 mainline)

1st St crossing Santiam River Bridge in Mill City is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2. This restriction is NOT on the OR22 mainline.

OR27 MP 1.90 (Irrigation Ditch - Prineville)

OR27 crossing Irrigation Ditch at MP 1.90 is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle, Weight Table 4.

OR27 MP 2.88 (Irrigation Ditch - Prineville)

OR27 crossing Irrigation Ditch at MP 2.88 is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle, Weight Table 4.

OR27 MP 4.62 (Irrigation Ditch - Prineville)

OR27 crossing Irrigation Ditch at MP 4.62 is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle, Weight Table 4.

OR27 MP 27.23 (Bear Creek Bridge - south of Prineville)

OR27 crossing Bear Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs GVW, Weight Table 2.

Old OR34 EB MP 0.13 (Willamette River / Van Buren St Bridge - Corvallis)

Old OR34 eastbound crossing Willamette River (Van Buren St) Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 80,000 lbs. GVW., Weight Table 1.

OR35 crossing Columbia River (White Salmon) Bridge - Hood River

OR35 crossing the Columbia River (White Salmon) Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 80,000 lbs. GVW, Weight Table 1. Bridge belongs to Port of Hood River.

OR43 MP 11.43 (Willamette River Arch Bridge - Oregon City)

OR43 crossing the Willamette River Arch Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 80,000 lbs. GVW, Weight Table 1.

OR53 MP 5.98 (Jack Horner Creek Bridge)

OR53 crossing Jack Horner Creek Bridge is restricted to 20,000 lbs. single axle, 40,000 lbs tandem axle, Weight Table 3.

OR86 MP 40.64 (Eagle Creek Bridge - Richland)

Effective October 20, 2016, all single-trip permit holders over continuous trip permit weights must stop all traffic, straddle centerline, and be the only vehicle on bridge when crossing.

OR104 Spur MP 4.62 (Skipanon River Bridge - Warrenton)

Effective April 4, 2011, OR104 Spur crossing the Skipanon River Bridge is restricted to 38,000 lbs. for solo trucks, 56,000 lbs. for 3-2 axle truck combinations, 64,000 lbs. for 3-3 axle (or more) truck combinations.

OR120 (Swift Hwy / Portland Rd) MP 0.38 (Columbia Slough Bridge - Portland)

OR120 (Swift Hwy / Portland Rd) crossing Columbia Slough Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.

OR126 Business MP 1.34 WB (Willamette River / Main St Bridge - Springfield)

OR126 Business westbound crossing Willamette River / Main St Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.

OR130 (Little Nestucca Hwy) MP 3.23 (Panther Creek Bridge)

OR130 (Little Nestucca Hwy) crossing Panther Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.

OR130 (Little Nestucca Hwy) MP 3.60 (Squaw Creek Bridge)

OR130 (Little Nestucca Hwy) crossing Squaw Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.

OR130 (Little Nestucca Hwy) MP 3.82 (Austin Creek Bridge)

OR130 (Little Nestucca Hwy) crossing Austin Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.

OR130 (Little Nestucca Hwy) MP 4.15 (Little Nestucca River Bridge)

OR130 (Little Nestucca Hwy) crossing Little Nestucca River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.

OR130 (Little Nestucca Hwy) MP 4.76 (Bear Creek Bridge)

OR130 (Little Nestucca Hwy) crossing Bear Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.

OR164 (Jefferson Hwy) MP 6.24 (Santiam River Bridge - Jefferson)

OR164 crossing the Santiam River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW. Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.

OR213 MP 9.14 to MP 10.90 NB & SB (Mulino)

Effective March 20, 2017, this section of OR213 is restricted to the following weights: 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2. Estimated date of completion is December 31, 2017.

OR219 MP 23.46 (Willamette River Bridge - south of Newberg)

OR219 crossing Willamette River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle. 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.

OR234 MP 0.04 (Rogue River Bridge - west of Gold Hill)

OR234 crossing Rogue River Bridge west of Gold Hill is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW, Weight Table 2 for divisible Loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW, Weight Table 3 for non-divisible loads.

OR241 MP 0.51 (Isthmus Slough)

MP 0.51 Isthmus Slough (1/2 mile from US101) is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 80,000 lbs. GVW., Weight Table 1

OR339 (Freewater Hwy) MP 2.76 (West Crockett Branch Bridge - Milton-Freewater)

OR339 (Freewater Hwy) crossing West Crockett Branch Bridge is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle, Weight Table 4.

OR339 (Freewater Hwy) MP 3.16 (East Fork Little Walla Walla River Bridge - Milton-Freewater)

OR339 (Freewater Hwy) crossing East Fork Little Walla Walla River Bridge is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle, Weight Table 4.

OR339 (Freewater Hwy) MP 3.31 (West Fork Little Walla Walla River Bridge - Milton-Freewater)

OR339 (Freewater Hwy) crossing West Fork Little Walla Walla River Bridge is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle, Weight Table 4.

Other Jurisdictions

Old OR99 (DC388) Old Winchester Bridge (Roseburg)

Old Winchester Bridge on DC388 (Old 99) at MP12.21 is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW.- Weight Table 2 Divisible Loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW.- Weight Table 3 Non- Divisible Loads.

Request email notification when restrictions change.