Road Restrictions 6/19/2018

Print Road & Bridge Restrictions     Print Road Restrictions Only

ROAD RESTRICTIONS

Interstate Routes

I-5 NB Exit 11 (OR99 - Ashland)

Effective June 25, 2018, the I-5 northbound off-ramp to OR99 will be restricted to 13 feet 00 inches in width, Monday through Thursday nights between the hours of 9 PM & 5 AM. Estimated date of completion is June 29, 2018.

I-5 NB & SB MP 12.97 to MP 13.64 (Ashland)

Effective June 14, 2018, this section of I-5 northbound and southbound will be restricted to 17 feet 00 inches in width. Estimated date of completion is June 28, 2018.

I-5 NB & SB MP 12.97 to MP 13.64 (Ashland) -- NEW --

Effective June 29, 2018, this section of I-5 northbound and southbound will be restricted to 16 feet 00 inches in width. Loads wider than 16 feet 00 inches in width may be accommodated on a case by case basis. Contact the OD Permit Unit for information. Estimated date of completion is September 18, 2018.

I-5 NB & SB MP 16.70 (Ashland)

Effective June 26, 2018, this section of I-5 northbound and southbound will be restricted to 14 feet 00 inches in width between the hours of 7 AM & 5 PM. Loads wider than 14 feet 00 inches in width may be accommodated on case by case basis. Contact the OD Permit Unit for information. Estimated date of completion is June 30, 2018.

I-5 NB & SB MP 16.70 (Ashland)

Effective June 26, 2018, this section of I-5 northbound will be restricted to 16 feet 11 inches in height and 16 feet 01 inch in height southbound between the hours of 7 AM & 5 PM. Estimated date of completion is June 30, 2018.

I-5 SB MP 23.07 (Talent)

Effective June 25, 2018, this section of I-5 southbound will be restricted to 14 feet 00 inches in width between the hours of 9 PM & 5 AM. Loads wider than 14 feet 00 inches in width may be accommodated on a case by case basis. Contact the OD Permit Unit for information. Estimated date of completion is June 28, 2018.

I-5 NB & SB MP 27.00 to MP 31.00 (Medford)

Effective June 12, 2018, this section of I-5 northbound and southbound will be restricted to 10 feet 00 inches in width, Sunday through Thursday nights between the hours of 8 PM & 6 AM. Estimated date of completion is July 24, 2018.

I-5 NB & SB MP 27.00 to MP 31.00 (Medford)

Effective June 12, 2018, this section of I-5 northbound will be restricted to 17 feet 11 inches in height and 17 feet 4 inches in height southbound, Sunday through Thursday nights between the hours of 8 PM & 6 AM. Estimated date of completion is July 24, 2018.

I-5 SB MP 45.47 (Rogue River)

Effective June 24, 2018, this section of I-5 southbound will be restricted to 14 feet 00 inches in width between the hours of 9 PM & 5 AM. Loads wider than 14 feet 00 inches in width may be accommodated on a case by case basis. Contact the OD Permit Unit for information. Estimated date of completion is June 27, 2018.

I-5 NB & SB MP 48.50 to MP 57.50 (Grants Pass) -- NEW --

Effective July 1, 2018 , this section of I-5 northbound and southbound will be restricted to 12 feet 00 inches in width Sunday through Thursday nights between 1/2 hour after sunset to 1/2 hour before sunrise. Loads wider than 12 feet 00 inches in width may be accommodated on a case by case basis. Contact the OD Permit Unit for information. Estimated date of completion is September 25, 2018 .

I-5 NB & SB MP 48.50 to MP 57.50 (Grants Pass) -- NEW --

Effective July 1, 2018 , this section of I-5 northbound and southbound will be restricted to 14 feet 00 inches in width Sunday through Thursday nights between the hours of 7 PM to 1/2 hour after sunset and from 1/2 hour before sunrise to 7 AM. Loads wider than 14 feet 00 inches in width may be accommodated on a case by case basis. Contact the OD Permit Unit for information. Estimated date of completion is September 25, 2018 .

I-5 NB on-ramp from Depot St (Exit 48 - Rogue River) -- NEW --

Effective July 1, 2018 , the I-5 northbound on-ramp from Depot St (Exit 48) will be intermittently closed Sunday through Thursday nights between the hours of 7 PM & 7 AM. Estimated date of completion is July 15, 2018 .

I-5 NB Exit 55 (Grants Pass) -- NEW --

Effective July 22 2018 , the I-5 northbound on/off ramps (Exit 55) will be intermittently closed Sunday through Thursday nights between the hours of 7 PM & 7 AM. Estimated date of completion is August 5, 2018 .

I-5 SB Exit 55 (Grants Pass) -- NEW --

Effective July 22, 2018 , the I-5 southbound on/off ramps (Exit 55) will be intermittently closed Sunday through Thursday nights between the hours of 7 PM & 7 AM. Estimated date of completion is August 5, 2018 .

I-5 SB on-ramp from OR99/US199 (Exit 58 - Grants Pass) -- NEW --

Effective July 8, 2018 , the ramp from OR99/US199 to I-5 southbound will be intermittently closed Sunday through Thursday nights between the hours of 7 PM & 7 AM. Estimated date of completion is July 22, 2018 .

I-5 NB Exit 58 (Grant Pass) -- NEW --

Effective July 15, 2018 , the I-5 northbound on/off ramps (Exit 58) will be intermittently closed Sunday through Thursday nights between the hours of 7 PM & 7 AM. Estimated date of completion is July 29, 2018 .

I-5 NB MP 65.74 (Pleasant Valley)

Effective June 22, 2018, this section of I-5 northbound will be restricted to 17 feet 00 inches in width between the hours of 7 AM & 5 PM. Loads wider than 17 feet 00 inches in width may be accommodated on a case by case basis. Contact the OD Permit Unit for information. Estimated date of completion is June 24, 2018.

I-5 SB MP 86.52 (Quines Creek)

Effective June 20, 2018, this section of I-5 southbound will be restricted to 17 feet 00 inches in width between the hours of 7 AM & 5 PM. Loads wider than 17 feet 00 inches in width may be accommodated on a case by case basis. Contact the OD Permit Unit for information. Estimated date of completion is June 21, 2018.

I-5 NB & SB Exit 136 (Sutherlin)

Effective June 17, 2018, the I-5 northbound and southbound on/off ramps (Exit 136) will be intermittently closed Sunday through Thursday nights between the hours of 7 PM & 7 AM. Estimated date of completion is June 22, 2018.

I-5 MP 158 to MP 155 SB (Curtin)

Effective April 23, 2018 , this section of I-5 southbound will be restricted to 17 feet 11 inches in height. Estimated date of completion is April 27, 2018 .

I-5 MP 158 to MP 155 SB & NB (Curtin)

Effective April 23, 2018 , this section of I-5 northbound and southbound will be restricted to 16 feet 00 inches in width. Estimated date of completion is April 27, 2018 .

I-5 SB Exit 235 (Millersburg)

Effective June 6, 2018, the I-5 southbound on/off ramps (Exit 235) will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5:30 AM. Estimated date of completion is July 31, 2018.

I-5 NB Exit 235 (Viewcrest)

Effective June 6, 2018, the I-5 northbound on/off ramps (Exit 235) will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5:30 AM. Estimated date of completion is July 31, 2018.

I-5 SB Exit 237 (Viewcrest)

Effective June 6, 2018, the I-5 southbound on/off ramps (Exit 237) will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5:30 AM. Estimated date of completion is July 31, 2018.

I-5 NB on-ramp from Century Dr (MP 238)

Effective June 6, 2018, the I-5 northbound on ramp from Century Drive (MP 238) will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5:30 AM. Estimated date of completion is July 31, 2018.

I-5 SB Exit 238 (OR164/Jefferson Hwy)

Effective June 27, 2018, the I-5 southbound on/off ramps (Exit 238) will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5:30 AM. Estimated date of completion is July 21, 2018.

I-5 NB Exit 238 (OR164/Jefferson Hwy)

Effective June 27, 2018, the I-5 northbound on/off ramps (Exit 238) will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5:30 AM. Estimated date of completion is July 21, 2018.

I-5 NB Exit 239 (Dever-Conner Rd)

Effective June 6, 2018, the I-5 northbound on/off ramps (Exit 239) will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5:30 AM. Estimated date of completion is July 31, 2018.

I-5 SB Exit 239 (Dever-Conner Rd)

Effective June 6, 2018, the I-5 southbound on/off ramps (Exit 239) will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5:30 AM. Estimated date of completion is July 31, 2018.

I-5 SB Exit 242 (Talbot Rd)

Effective June 6, 2018, the I-5 southbound on/off ramps (Exit 242) will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5:30 AM. Estimated date of completion is July 31, 2018.

I-5 NB Exit 242 (Talbot Rd)

Effective June 6, 2018, the I-5 northbound on/off ramps (Exit 242) will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5:30 AM. Estimated date of completion is July 31, 2018.

I-5 SB Exit 243 (Ankeny Hill Rd)

Effective June 6, 2018, the I-5 southbound on/off ramps (Exit 243) will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5:30 AM. Estimated date of completion is July 31, 2018.

I-5 NB Exit 243 (Ankeny Hill Rd)

Effective June 6, 2018, the I-5 northbound on/off ramps (Exit 243) will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5:30 AM. Estimated date of completion is July 31, 2018.

I-5 SB Exit 244 (OR164/Jefferson Hwy)

Effective June 27, 2018, the I-5 southbound on/off ramps will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5:30 AM. Estimated date of completion is July 21, 2018.

I-5 NB Exit 244 (OR164/Jefferson Hwy)

Effective June 27, 2018, the I-5 northbound on/off ramps will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5:30 AM. Estimated date of completion is July 21, 2018.

I-5 NB & SB Exit 244 (N Jefferson)

Effective July 9, 2018, the I-5 northbound and southbound off-ramps (Exit 244) will be closed between the hours of 6 AM & 6 PM. Estimated date of completion is July 9, 2018.

I-5 SB MP 283.23 to MP 283.30 (Wilsonville)

Effective June 7, 2018, this section of I-5 southbound will be restricted to 17 feet 00 inches in width between the hours of 10 PM & 5 AM. Loads wider than 17 feet 00 inches in width may be accommodated on a case by case basis. Contact the OD Permit Unit for information. Estimated date of completion is August 30, 2018.

I-5 NB & SB MP 287.64 to MP 288.48 (Portland)

Effective June 11, 2018, this section of I-5 will be restricted to 14 feet 00 inches in width Sunday through Thursday nights between the hours of 10 PM & 5 AM; Friday nights between the hours of 11 PM & 7 AM; Saturday nights between the hours of 11 PM & 8 AM. Estimated date of completion of is September 15, 2018.

I-5 SB MP 288.98 to MP 287.93 (Portland)

Effective June 11, 2018, this section of I-5 southbound will be restricted to 16 feet 09 inches in height Sunday through Thursday nights between the hours of 10 PM & 5 AM; Friday nights between the hours of 11 PM & 7 AM; Saturday nights between the hours of 11 PM & 8 AM. Estimated date of completion of is September 15, 2018.

I-5 SB MP 288.00 to MP 290.00 (Tualatin)

Effective February 21, 2018 this section of I-5 southbound will be restricted to 16 feet 9 inches in height Sunday through Thursday nights 8 PM to 5:30 AM; Friday nights 8 PM to 8 AM; and Saturday nights 8 PM to 9 AM. Estimated date of completion is August 30, 2019.

I-5 SB Exit 288 to I-205 NB (Portland)

Effective Friday June 8, 2018 at 11 PM, the I-5 southbound ramp (Exit 288) to I-205 northbound will be restricted to 14 feet 00 inches in width. Estimated date of completion is Monday June 11, 2018 by 5 AM.

I-5 SB on-ramp from Lower Boones Ferry Rd (Tualatin)

Effective March 6, 2018, the I-5 southbound on-ramp from Lower Boones Ferry Rd will be restricted to 14 feet 00 inches in width Sunday through Thursday nights between the hours of 10 PM & 5 AM. Estimated date of completion is June 15, 2018.

I-5 SB Exit 293 to Haines St (Portland) -- NEW --

Effective June 25, 2018 , the I-5 southbound off-ramp (Exit 293) will be closed Monday through Thursday nights between the hours of 10 PM & 5 AM and Friday night between the hours of 11 PM & 7 AM. Estimated date of completion is July 7, 2018 .

I-5 NB MP 293.59 to MP 294.05 (TRUCK LANE- Portland)

Effective June 17, 2018, the I-5 northbound truck lane will be intermittently closed between the hours of 9 PM & 5 AM. When closed, traffic will be directed to stay on the I-5 mainline. Estimated date of completion is July 1, 2018.

I-5 NB on-ramp from Spring Garden Rd (Portland) -- NEW --

Effective June 25, 2018 , the I-5 northbound ramp from Spring Garden Rd will be closed Thursday night between the hours of 10 PM & 5 AM and Friday night between the hours of 11 PM & 7 AM. Estimated date of completion is July 7, 2018 .

I-5 SB Exit 297 to Terwillger Blvd (Portland) -- NEW --

Effective July 2, 2018, the I-5 southbound off-ramp (Exit 297) will be closed Monday through Thursday nights between the hours of 10 PM & 5 AM and Friday nights between the hours of 11 PM & 7 AM. Estimated date of completion is July 14, 2018.

I-5 NB Exit 299B to I-405 NB (Portland)

Effective June 18, 2018, the I-5 northbound ramp (Exit 299B) to I-405 northbound will be restricted to 13 feet 00 inches in width, Monday through Thursday nights between the hours of 10 PM & 5 AM. Estimated date of completion is June 30, 2018.

I-5 NB MP 299.50 to MP 303.40 (Portland) -- NEW --

Effective July 27, 2018 at 10 PM, this section of I-5 northbound will be closed at all hours. In addition, the following ramps to I-5 northbound will be closed: I-84 WB on-ramp; Exit 302A on/off-ramp; Exit 302B off-ramp; SE Morrison St on-ramp; and SE Belmont St on-ramp (access to I-84 EB will remain open). Estimated date of completion is July 30, 2018 by 5 AM.

I-5 NB & SB MP 299.52 to MP 300.50 (Portland)

Effective June 18, 2018, this section of I-5 northbound and southbound will be restricted to 13 feet 00 inches in width Monday through Thursday nights between the hours of 10 PM & 5 AM. Estimated date of completion is June 30, 2018.

I-5 NB & SB MP 299.52 to MP 300.50 (Portland)

Effective June 18, 2018, this section of I-5 northbound will be restricted to 15 feet 11 inches in height, and 15 feet 00 inches in height southbound, Monday through Thursday nights between the hours of 10 PM & 5 AM. Estimated date of completion is June 30, 2018.

I-5 SB Exit to I-405 NB (Portland)

Effective June 18, 2018, the I-5 southbound exit to I-405 northbound will be restricted to 13 feet 00 inches in width, Monday through Thursday nights between the hours of 10 PM & 5 AM. Estimated date of completion is June 30, 2018.

I-5 NB to I-84 EB (Exit 300 - Portland) -- NEW --

Effective June 18, 2018 , the I-5 northbound Exit 300 to I-84 eastbound will be intermittently closed Sunday through Thursday nights between the hours of 10 PM & 5 AM; and Friday nights between the hours of 10 PM & 7 AM. Estimated date of completion is July 7, 2018 .

I-5 NB & SB MP 301.50 to MP 307.97 (Portland)

Effective June 3, 2018, this section of I-5 northbound and southbound will be restricted to 13 feet 00 inches in width from 1/2 hour after sunset to 1/2 hour before sunrise. Loads wider than 13 feet 00 inches in width may be accommodated on a case by case. Contact the OD Permit Unit for information. Estimated date of completion is June 22, 2018.

I-5 NB & SB MP 301.50 to MP 307.97 (Portland)

Effective June 3, 2018, this section of I-5 northbound and southbound will be restricted to 19 feet 00 inches in width Saturday from 1/2 hour before sunrise to 7 AM and Sunday from 1/2 hour before sunrise to 8 AM. Loads wider than 19 feet 00 inches in width may be accommodated on a case by case basis. Contact the OD Permit Unit for information. Estimated date of completion is June 22, 2018.

I-5 NB & SB MP 301.50 to MP 307.97 (Portland)

Effective June 3, 2018, this section of I-5 northbound will be restricted to 15 feet 5 inches in height and 14 feet 7 inches in height southbound; Sunday through Thursday nights from 8 PM to 5:30 AM; Friday nights from 8 PM to 8 AM and Saturday nights from 8 PM to 9 AM. Estimated date of completion is June 22, 2018.

I-5 NB & SB MP 301.50 to MP 307.97 (Portland)

Effective June 20, 2018, the following northbound and southbound ramps will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM; Friday nights between 9 PM & 7 AM; and Saturday nights between 10 PM & 8 AM: I-5 northbound – Exit 303 to Swan Island; on-ramp from N Going St; on-ramp from N Alberta St; Exit 304 to Rosa Parks Way; on-ramp from Rosa Parks Way; Exit 305A to US30 Bypass East; Exit 305B to US30 Bypass West; on-ramp from Victory Blvd/Denver Ave; Exit 307 to OR99E/Marine Dr; and on-ramp from OR99E/Marine Dr. I-5 southbound – On-ramp from OR99E/Marine Dr; Exit 306 to OR99W/Interstate Ave; on-ramps from US30 Bypass (East and West); Exit 304 to Rosa Parks Way; on-ramp from Rosa Parks Way; on-ramp from N Alberta St; Exit 303 to Swan Island. Estimated date of completion if June 30, 2018.

I-5 NB & SB MP 301.50 to MP 307.97 (Portland)

Effective June 20, 2018, this section of I-5 northbound and southbound will be restricted to 15 feet 00 inches in width, Sunday through Thursday nights between the hours of 8 PM & 5 AM; Friday nights between the hours of 10 PM & 7 AM; and Saturday nights between the hours of 10 PM & 8 AM. Loads wider than 15 feet 00 inches in width may be accommodated on a case by case basis. Contact the OD Permit Unit for information. The estimated date of completion is June 30, 2018.

I-5 SB MP 301.50 to MP 303.41 (Portland) -- NEW --

Effective July 13, 2018 at 10 PM, this section of I-5 southbound will be closed at all hours Friday night through Monday morning at 5 AM. In addition, the following ramps to I-5 southbound will be closed during the same time: N Going St on-ramp; Greeley Ave on-ramp; NB I-405 on-ramp; and N Wheeler Ave on-ramp. Estimated date of completion is July 23, 2018.

I-5 SB Exit 301 to I-84 EB (Portland)

Effective July 8, 2018 at 10 PM, the I-5 southbound ramp (Exit 301) to I-84 eastbound will be closed at all hours. The estimated date of completion is July 23, 2018 by 5 AM.

I-5 SB MP 303.00 to MP 304.00 (Portland) -- NEW --

Effective July 23, 2016, this section of I-5 southbound will be restricted to 15 feet 5 inches in height between the hours of 10 PM & 5 AM. Estimated date of completion is July 26, 2018.

I-5 SB MP 303.41 (Portland) -- NEW --

Effective June 23, 2018 , this section of I-5 southbound will be closed between the hours of 10 PM & 6 AM. Estimated date of completion is June 24, 2018 .

I-5 SB MP 303.50 to MP 304.50 (Portland)

Effective July 13, 2018, this section of I-5 southbound will be restricted to 15 feet 5 inches in height, Friday through Sunday nights between the hours of 10 PM & 5 AM. Estimated date of completion is July 23, 2018.

I-5 NB Exit 303 (N Going St - Portland) -- NEW --

Effective July 23, 2018, the I-5 northbound on/off ramps (Exit 303) will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM; Friday nights between the hours of 9 PM & 7 AM; and Saturday nights between the hours of 10 PM & 8 AM. Estimated date of completion is July 27, 2018.

I-5 SB on-ramp from Alberta St (Portland) -- NEW --

Effective July 27, 2018, the I-5 southbound on-ramp from Alberta St will be closed Sunday through Thursday nights between the hours of 9 PM & 5 AM; Friday nights between the hours of 9 PM & 7 AM; and Saturday nights between the hours of 10 PM & 8 AM. Estimated date of completion is August 1, 2018.

I-5 SB Exit 303 to Alberta St (Portland) -- NEW --

Effective July 27, 2018, the I-5 southbound off-ramp (Exit 303) will be closed Sunday through Thursday nights between the hours of 9 PM & 5 AM; Friday nights between the hours of 9 PM & 7 AM; and Saturday nights between the hours of 10 PM & 8 AM. Estimated date of completion is August 1, 2018.

I-5 NB MP 304.50 to MP 305.50 (Portland)

Effective June 5, 2018, this section of I-5 northbound will be restricted to 10 feet 00 inches in width between the hours of 10 PM & 5 AM. Estimated date of completion is June 14, 2018.

I-5 NB MP 304.50 to MP 305.50 (Portland)

Effective June 5, 2018, this section of I-5 northbound will be restricted to 15 feet 9 inches in height between the hours of 10 PM & 5 AM. Estimated date of completion is June 14, 2018.

I-5 NB on-ramp from Alberta St (Portland) -- NEW --

Effective July 27, 2018, the I-5 northbound on-ramp from Alberta St will be closed Sunday through Thursday nights between the hours of 9 PM & 5 AM; Friday nights between the hours of 9 PM & 7 AM; and Saturday nights between the hours of 10 PM & 8 AM. Estimated date of completion is August 1, 2018.

I-5 SB MP 304.50 to MP 305.50 (Portland)

Effective June 4, 2018, this section of I-5 southbound will be restricted to 10 feet 00 inches in width between the hours of 10 PM & 5 AM. Estimated date of completion is June 11, 2018.

I-5 SB MP 304.50 to MP 305.50 (Portland)

Effective June 4, 2018, this section of I-5 southbound will be restricted to 15 feet 11 inches in height between the hours of 10 PM & 5 AM. Estimated date of completion is June 11, 2018.

I-5 NB & SB on/off ramps to US30 Bypass (Portland) -- NEW --

Effective July 17, 2018, the I-5 northbound and southbound on/off ramps to/from US30 Bypass will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM; Friday nights between the hours of 9 PM & 7 AM; and Saturday nights between the hours of 10 PM & 8 AM. Estimated date of completion is July 23, 2018.

I-5 SB MP 307.59 to MP 308.65 (Portland)

Effective June 22, 2018, this section of I-5 southbound will be restricted to 18 feet 00 inches in width Friday and Saturday nights between the hours of 10 PM & 5 AM. Estimated date of completion is July 1, 2018.

I-5 SB on-ramp from Hayden Island (Jantzen Beach)

Effective June 22, 2018, the I-5 southbound on-ramp from Hayden Island will be closed Friday and Saturday nights between the hours of 10 PM & 5 AM. Estimated date of completion is July 1, 2018.

I-82 MP 0.00 NB & SB (Columbia River Bridge - Umatilla)

Effective August 7, 2017 , this section of I-82 will be restricted to 14 feet 00 in. in width . Load wider than 14 feet 00 in. in width may be accommodated on a case-by-case basis. Contact Washington DOT at 360-704-6340 for additional information. Estimated date of completion is September 28, 2018.

I-82 SB MP 0.50 to MP 1.00 (Umatilla)

Effective March 12, 2018, this section of I-82 southbound will be restricted to 19 feet 00 inches in width. Loads wider than 19 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is July 16, 2018.

I-82 NB MP 0.50 to MP 1.00 (Umatilla)

Effective March 12, 2018, this section of I-82 northbound will be restricted to 19 feet 00 inches in width. Loads wider than 19 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is July 16, 2018.

I-84 WB Exit to I-5 NB (Portland) -- NEW --

Effective July 25, 2018 at 10 PM, the I-84 westbound exit to I-5 northbound will be closed. In addition, the following ramps to I-84 westbound will be closed; NE 33rd Ave on-ramp; NE Sandy Blvd on-ramp; Glisan St on-ramp; and Halsey St on-ramp. Estimated date of completion is August 6, 2018 by 5 AM.

I-84 WB Exit to I-5 SB (Portland) -- NEW --

Effective August 17, 2018 at 10 PM, the I-84 westbound exit to I-5 southbound will be closed. In addition, the following ramps to I-84 westbound will be closed; NE 33rd Ave on-ramp; NE Sandy Blvd on-ramp; Glisan St on-ramp; and Halsey St on-ramp. Estimated date of completion is August 27, 2018 by 5 AM.

I-84 WB Exit to I-5 SB (Portland) -- NEW --

Effective July 27, 2018 at 10 PM, the I-84 westbound exit to I-5 southbound will be restricted to 13 feet 00 inches in width. In addition, the following ramps to I-84 westbound will be closed; NE 33rd Ave on-ramp; NE Sandy Blvd on-ramp; Glisan St on-ramp; and Halsey St on-ramp. Estimated date of completion is August 2, 2018 by 5 AM.

I-84 MP 5 to MP 1 WB (Portland) -- NEW --

Effective July 12, 2017, this section of I-84 westbound will be restricted to 13 feet 00 in. in width between the hours of 10 PM & 5 AM. Estimated date of completion is June 29, 2018 .

I-84 MP 5 to MP 1 WB (Portland) -- NEW --

Effective July 12, 2017, this section of I-84 westbound will be restricted to 15 feet 09 in. in height between the hours of 10 PM & 5 AM. Estimated date of completion is June 29, 2018 .

I-84 EB MP 41.25 (Tooth Rock Tunnel - near Cascade Locks)

Effective June 5, 2018, this section of I-84 eastbound will be restricted to 14 feet 08 inches in height between the hours of 6 PM & 7 AM. Estimated date of completion is June 6, 2018.

I-84 EB MP 41.25 (Tooth Rock Tunnel - near Cascade Locks)

Effective June 14, 2018 , this section of I-84 eastbound will be restricted to 12 foot 00 inches in width between the hours of 6 PM & 7 AM. Estimated date of completion is June 15, 2018 .

I-84 MP 47.22 to MP 48.21 EB & WB (Cascade Locks)

Effective February 19, 2018, this section of I-84 eastbound and westbound will be restricted to 13 feet 00 inches in width from 1/2 hour after sunset to 1/2 hour before sunrise. Estimated date of completion is November 15, 2018.

I-84 MP 47.22 to MP 48.21 EB & WB (Cascade Locks)

Effective February 19, 2018, this section of I-84 eastbound and westbound will be restricted to 16 feet 00 inches in width per the following schedule: Monday through Friday from 1/2 hour before sunrise to 12 (noon); Friday nights from 8 PM to 1/2 hour after sunset; Saturday mornings from 1/2 hour before sunrise to 9 AM; Saturday nights from 8 PM to 1/2 hour after sunset; Sunday mornings from 1/2 hour before sunrise to 10 AM. Estimated date of completion is November 15, 2018.

I-84 EB & WB MP 56.04 (Cascade Locks)

Effective June 17, 2018, this section of I-84 eastbound will be closed between the hours of 8 PM & 8 AM. I-84 westbound will be closed Sunday nights between the hours of 10 PM & 6 AM; and Monday through Saturday nights between the hours of 8 PM & 6 AM. When closed, all traffic will be directed to take Exit 56 and re-enter I-84. Estimated date of completion is July 31, 2018.

I-84 EB & WB MP 64.00 to MP 76.00 (Hood River - Rowena)

Effective March 1, 2018, this section of I-84 eastbound and westbound will be restricted to 12 feet 00 inches in width Sunday through Thursday nights between the hours of 7 PM to 7 AM. Estimated date of completion is May 31, 2018.

I-84 EB & WB MP 64.00 to MP 76.00 (Hood River - Rowena)

Effective April 9, 2018, this section of I-84 eastbound and westbound will be restricted to 19 feet 00 inches in width Monday through Thursday 7 AM to 7 PM. Loads wider than 19 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information . Estimated date of completion is May 31, 2018.

I-84 EB & WB Exit 64 (Hood River)

Effective May 20, 2018 , the I-84 eastbound and westbound on/off ramps (Exit 64) will be intermittently closed Sunday through Thursday nights between the hours of 10 PM & 5 AM. Estimated date of completion is May 25, 2018 .

I-84 WB to Koberg State Park (Hood River)

Effective May 20, 2018 , the I-84 westbound ramps to/from Koberg State Park (Rest Area) will be closed Sunday through Thursday nights between the hours of 10 PM & 5 AM. Estimated date of completion is May 25, 2018 .

I-84 EB & WB MP 69.50 to MP 70.50 (Moiser Creek)

Effective August 27, 2018, this section of I-84 eastbound and westbound will be restricted to 16 feet 00 inches in width between the hours of 6 AM & 4 PM. Loads wider than 16 feet 00 inches in width can be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is August 30, 2018.

I-84 EB & WB MP 69.50 to MP 70.50 (Moiser Creek)

Effective August 27, 2018, this section of I-84 eastbound and westbound will be restricted to 16 feet 06 inches in height between the hours of 6 AM and 4 PM. Estimated date of completion is August 30, 2018.

I-84 EB & WB Exit 69 (Mosier)

Effective May 20, 2018 , the I-84 eastbound and westbound on/off ramps (Exit 69) will be intermittently closed Sunday through Thursday nights between the hours of 10 PM & 5 AM. Estimated date of completion is May 25, 2018 .

I-84 EB & WB to Memaloose Rest Area (Rowena)

Effective May 30, 2018 , the I-84 eastbound and westbound the ramps to/from the Memaloose Rest Area will be closed Sunday through Thursday nights between the hours of 10 PM & 5 AM. Estimated date of completion is June 1, 2018 .

I-84 EB & WB MP 83.00 to MP 84.00 (The Dalles)

Effective July 30, 2018, this section of I-84 eastbound and westbound will be restricted to 16 feet 00 inches in width between the hours of 6 AM & 5 PM. Loads wider than 16 feet 00 inches in width can be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is August 2, 2018.

I-84 EB & WB MP 88.00 to MP 89.00 (The Dalles)

Effective July 16, 2018, this section of I-84 eastbound and westbound will be restricted to 16 feet 00 inches in width between the hours of 6 AM & 5 PM. Loads wider than 16 feet 00 inches in width can be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is July 19, 2018.

I-84 WB MP 209.00 to MP 210.00 (Pendleton)

Effective March 12, 2018, this section of I-84 westbound will be restricted to 19 feet 00 inches in width. Loads wider than 19 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is July 16, 2018.

I-84 EB MP 209.00 to MP 210.00 (Pendleton)

Effective March 12, 2018, this section of I-84 eastbound will be restricted to 19 feet 00 inches in width. Loads wider than 19 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is July 16, 2018.

I-84 EB MP 214.00 (Pendleton)

Effective May 29, 2018, this section of I-84 eastbound will be restricted to 19 feet 00 inches in width. Loads wider than 19 feet 00 inches in width may be accommodated on a case by case basis. Contact the OD Permit Unit for information. Estimated date of completion if June 16, 2018.

I-84 EB MP 214.00 (Pendleton)

Effective May 29, 2018, this section of I-84 eastbound will be restricted to 18 feet 10 inches in height. Estimated date of completion is June 16, 2018.

I-84 EB & WB MP 243.30 to MP 244.30 (Meacham)

Effective March 26, 2018, this section of I-84 eastbound and westbound will be restricted to 19 feet 00 inches in width. Loads wider than 19 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is July 16, 2018.

I-84 EB & WB MP 243.30 to MP 244.30 (Meacham)

Effective March 26, 2018, this section of I-84 eastbound will be restricted to 16 feet 09 inches in height and westbound will be restricted to 16 feet 07 inches in height. Estimated date of completion is July 16, 2018.

I-84 WB MP 267.46 (La Grande)

Effective May 29, 2018, this section of I-84 westbound will be restricted to 19 feet 00 inches in width. Loads wider than 19 feet 00 inches in width may be accommodated on a case by case basis. Contact the OD Permit Unit for information. Estimated date of completion if June 16, 2018.

I-84 EB & WB MP 283.50 to MP 285.50 (North Powder)

Effective April 3, 2018, this section of I-84 eastbound and westbound will be restricted to 16 feet 00 inches in width. Estimated date of completion is July 31, 2018.

I-84 EB & WB MP 283.50 to MP 285.50 (North Powder)

Effective April 3, 2018, this section of I-84 eastbound and westbound will be restricted to 16 feet 3 inches in height. Estimated date of completion is July 31, 2018.

I-84 WB MP 303.50 to MP 304.50 (Baker City)

Effective March 26, 2018, this section of I-84 westbound will be restricted to 19 feet 00 inches in width. Loads wider than 19 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is July 16, 2018.

I-84 EB MP 303.50 to MP 304.50 (Baker City)

Effective March 26, 2018, this section of I-84 eastbound will be restricted to 19 feet 00 inches in width. Loads wider than 19 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is July 16, 2018.

I-84 EB & WB MP 313.12 to MP 318.53 (Pleasant Valley)

Effective June 20, 2018, this section of I-84 eastbound and westbound will be restricted to 16 feet 00 inches in width. Loads wider than 16 feet 00 inches in width may be accommodated on a case by case basis. Contact the OD Permit Unit for information. Estimated date if completion is October 31, 2018.

I-84 EB & WB MP 313.12 to MP 318.53 (Pleasant Valley)

Effective May 20, 2018 , this section of I-84 eastbound and westbound will be restricted to 12 feet 00 inches in width from 1/2 hour after sunset to 1/2 hour before sunrise. Loads wider than 12 feet 00 inches in width may be accommodated on a case by case basis. Contact the OD Permit Unit for information. Estimated date of completion is June 19, 2018 .

I-84 EB & WB MP 313.12 to MP 318.53 (Pleasant Valley)

Effective May 20, 2018 , this section of I-84 eastbound and westbound will be restricted to 14 feet 00 inches in width between 7 PM to 1/2 hour after sunset; and from 1/2 hour before sunrise to 7 AM. Loads wider than 14 feet 00 inches in width may be accommodated on a case by case basis. Contact the OD Permit Unit for information. Estimated date of completion is June 19, 2018 .

I-84 EB & WB MP 331.00 to MP 343.00 (Pleasant Valley)

Effective June 11, 2018, this section of I-84 eastbound and westbound will be restricted to 12 feet 00 inches in width from 1/2 hour after sunset to 1/2 hour before sunrise. Loads wider than 12 feet 00 inches in width may be accommodated on a case by case basis. Contact the OD Permit Unit for information. Estimated date of completion is June 30, 2018.

I-84 EB & WB MP 331.00 to MP 343.00 (Pleasant Valley)

Effective June 11, 2018, this section of I-84 eastbound will be restricted to 17 feet 10 inches in height and 17 feet 3 inches in height westbound from 1/2 hour after sunset to 1/2 hour after sunrise. Estimated date of completion is June 30, 2018.

I-205 NB & SB MP 0 to MP 8.82

Effective June 11, 2018, this section of I-205 will be restricted to 14 feet 00 inches in width Sunday through Thursday nights between the hours of 10 PM & 5 AM; Friday nights between the hours of 11 PM & 7 AM; Saturday nights between the hours of 11 PM & 8 AM. Estimated date of completion of is September 15, 2018.

I-205 SB MP 8.82 to MP 0

Effective June 11, 2018, this section of I-205 southbound will be restricted to 16 feet 07 inches in height Sunday through Thursday nights between the hours of 10 PM & 5 AM; Friday nights between the hours of 11 PM & 7 AM; Saturday nights between the hours of 11 PM & 8 AM. Estimated date of completion is September 15, 2018.

I-205 NB MP 0 to MP 8.82

Effective June 11, 2018, this section of I-205 northbound will be restricted to 17 feet 02 inches in height Sunday through Thursday nights between the hours of 10 PM & 5 AM; Friday nights between the hours of 11 PM & 7 AM; Saturday nights between the hours of 11 PM & 8 AM. Estimated date of completion is September 15, 2018.

I-205 NB & SB MP 15.97 to MP 25.70 (Portland)

Effective April 15, 2018, this section of I-205 northbound and southbound will be restricted to 14 feet 00 inches in width Sunday through Thursday nights between the hours of 10 PM & 5 AM; Friday and Saturday nights between the hours of 11 PM to 1/2 hour before sunrise. Loads wider than 14 feet 00 inches in width may be accommodated on a case by case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is November 27, 2019.

I-205 NB & SB MP 15.97 to MP 25.70 (Portland)

Effective April 15, 2018, this section of I-205 northbound and southbound will be restricted to 19 feet 00 inches in width from 1/2 hour before sunrise to 1/2 hour after sunset. Loads wider than 19 feet 00 inches in width may be accommodated on a case by case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is November 27, 2019.

I-205 NB & SB MP 15.97 to MP 25.70 (Portland)

Effective April 15, 2018, this section of I-205 northbound and southbound will be restricted to 16 feet 5 inches in height. Loads higher than 16 feet 5 inches in height may be accommodated on a case by case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is November 27, 2019.

I-205 NB Exit 19 (US26/Division St/Powell Blvd - Portland)

Effective June 17, 2018, the I-205 northbound ramp (Exit 19) will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM. Estimated date of completion is June 24, 2018.

I-205 SB on-ramp from US26/Division St/Powell Blvd (Portland)

Effective May 30, 2018, the I-205 southbound ramp from US26/Division St/Powell Blvd will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM. Estimated date of completion is June 3, 2018.

I-205 NB on-ramp from US26/Division St/Powell Blvd (Portland)

Effective June 17, 2018, the I-205 northbound ramp from US26/Division St/Powell Blvd will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM. Estimated date of completion is June 3, 2018.

I-205 SB Exit 19 (US26/Division St/Powell Blvd - Portland)

Effective May 28, 2018, the I-205 southbound ramp (Exit 19) to US26/Division St/Powell Blvd will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM. Estimated date of completion is June 3, 2018.

I-205 SB on-ramp from I-84 EB (Portland)

Effective May 27, 2018, the I-205 southbound on-ramp from I-84 eastbound will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM. Estimated date of completion is June 3, 2018.

I-205 SB on-ramp from I-84 WB (Portland)

Effective May 24, 2018, the I-205 southbound on-ramp from I-84 westbound will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM. Estimated date of completion is May 29, 2018.

I-205 NB Exit 22 (I-84 EB - Portland)

Effective June 18, 2018, the I-205 northbound ramp (Exit 22) will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM. Estimated date of completion is June 24, 2018.

I-205 NB on-ramp from I-84 EB (Portland)

Effective June 18, 2018, the I-205 northbound on-ramp from I-84 eastbound will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM. Estimated date of completion is June 24, 2018.

I-205 NB on-ramp from I-84 WB (Portland)

Effective June 19, 2018, the I-205 northbound on-ramp from I-84 westbound will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM. Estimated date of completion is June 24, 2018.

I-205 SB Exit 22 (I-84 EB - Portland)

Effective May 24, 2018, the I-205 southbound ramp (Exit 22) will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM. Estimated date of completion is May 29, 2018.

I-205 NB Exit 23A (US30 Bypass East - Portland)

Effective June 19, 2018, I-205 northbound ramp (Exit 23A) will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM. Estimated date of completion is June 24, 2018.

I-205 SB on-ramp from US30 Bypass (Portland)

Effective May 23, 2018, the I-205 southbound on-ramp from US30 Bypass will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM. Estimated date of completion is May 29, 2018.

I-205 NB Exit 23B (US30 Bypass West - Portland)

Effective June 20, 2018, the I-205 northbound ramp (Exit 23B) will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM. Estimated date of completion is June 24, 2018.

I-205 SB Exit 23A (US30 Bypass East - Portland)

Effective May 23, 2018, the I-205 southbound ramp (Exit 23A) will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM. Estimated date of completion is May 29, 2018.

I-205 SB Exit 23B (US30 Bypass West - Portland)

Effective May 22, 2018, the I-205 southbound ramp (Exit 23B) will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM. Estimated date of completion is May 29, 2018.

I-205 NB on-ramp from US30 Bypass (Portland)

Effective June 20, 2018, the I-205 northbound on-ramp from US30 Bypass will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM. Estimated date of completion is June 24, 2018.

I-405 SB MP 0.00 to MP 1.00 (Portland) -- NEW --

Effective July 27, 2018 at 10 PM, this section of I-405 southbound will be restricted to 15 feet 08 inches in height at all hours Friday night through Monday morning at 5 AM. Estimated date of completion is August 6, 2018.

I-405 SB MP 0.00 to MP 1.00 (Portland) -- NEW --

Effective July 27, 2018 at 10 PM, this section of I-405 southbound will be restricted to 12 feet 00 inches in width at all hours Friday night through Monday morning at 5 AM. Estimated date of completion is August 6, 2018.

I-405 SB on-ramp from 5th Ave (Portland) -- NEW --

Effective July 27, 2018 at 10 PM, the I-405 southbound on-ramp from 5th Ave will be closed at all hours. The estimated date of completion is July 30, 2018 at 5 AM.

U.S. Routes

US20 MP 99.94 EB & WB (Sisters)

Effective November 28, 2017, this section of US20 is restricted to 14 feet 00 inches in width and/or 154 feet overall length. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads wider than 14 feet and/or 154 feet overall length may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information.

US20/US395 EB & WB MP 131.44 to MP 131.92 (Burns) -- NEW --

Effective July 4, 2018, this section of US20/US395 will be closed between the hours of 10 AM & 11 AM, for one day only.

US26 EB MP 17.00 to MP 18.00 (Damascus)

Effective May 23, 2018, this section of US26 eastbound will be restricted to 12 feet 00 inches in width from ½ hour after sunset to ½ hour before sunrise. Loads wider than 12 feet 00 inches in width may be accommodated on a case by case basis. Contact the OD permit Unit for information. Estimated date of completion is October 12, 2018.

US26 EB MP 17.00 to MP 18.00 (Damascus)

Effective May 23, 2018, this section of US26 eastbound will be restricted to 14 feet 00 inches in width per the following schedule: Monday through Thursday from 8 PM to ½ hour after sunset and ½ hour before sunrise to 2 PM; Thursday nights from 8 PM to ½ hour after sunset and Friday ½ hour before sunrise to 10 AM; Friday nights from 9 PM to ½ hour after sunset and Saturday ½ hour before sunrise to 9 AM; Saturday nights from 7 PM to ½ hour after sunset and Sunday ½ hour before sunrise to 9 AM; and Sunday nights from 7 PM to ½ hour after sunset. Estimated date of completion is October 12, 2018.

US26 WB MP 17.00 to MP 18.00 (Damascus)

Effective May 23, 2018, this section of US26 westbound will be restricted to 12 feet 00 inches in width from ½ hour after sunset to ½ hour before sunrise. Loads wider than 12 feet 00 inches in width may be accommodated on a case by case basis. Contact the OD permit Unit for information. Estimated date of completion is October 12, 2018.

US26 WB MP 17.00 to MP 18.00 (Damascus)

Effective May 23, 2018, this section of US26 westbound will be restricted to 14 feet 00 inches in width per the following schedule: Monday through Friday 9 AM to 3 PM; Monday through Friday from 7 PM to ½ hour after sunset and ½ hour before sunrise to 6 AM; Friday and Saturday nights between 7 PM to ½ hour after sunset and ½ hour before sunrise to 9 AM; Sunday nights between 7 PM and ½ hour after sunset. Estimated date of completion is October 12, 2018.

US26 EB & WB MP 23.87 to MP 24.61 (Sandy)

Effective July 12, 2018, this section of US26 eastbound and westbound will be restricted to 8 feet 06 inches in width between the hours of 6:30 PM & 9:30 PM, for one day only.

US26 EB (Vista Ridge Tunnel - Portland)

Effective June 15, 2018 , this section of US26 eastbound through the Vista Ridge Tunnel will be restricted to 17 feet 10 inches in height between the hours of 8 PM & 9 AM. Estimated date of completion is June 16, 2018 .

US26 WB (Vista Ridge Tunnel - Portland)

Effective June 16, 2018 , this section of US26 westbound through the Vista Ridge Tunnel will be restricted to 18 feet 00 inches in height between the hours of 8 PM & 10 AM. Estimated date of completion is June 17, 2018 .

US30 NB & SB MP 40.44 to MP 40.73 (Haines) -- NEW --

Effective July 4, 2018, this section of US30 will be closed between the hours of 5 AM & 12 PM, for one day only.

US30 NB & SB MP 49.29 to MP 49.95 (Baker City)

Effective June 30, 2018, this section of US30 will be closed between the hours of 8 AM & noon, for one day only.

US30 NB & SB MP 51.73 to MP 51.79 (Baker City) -- NEW --

Effective July 11, 2018 at 7 AM, this section of US30 will be closed. Estimated date of completion is July 15, 2018 by 9 PM.

US30 NB & SB MP 51.79 to MP 52.04 (Baker City)

Effective June 30, 2018, this section of US30 will be closed between the hours of 9 AM & 8 PM, for one day only.

US30 NB & SB MP 51.79 to MP 52.04 (Baker City) -- NEW --

Effective July 12, 2018 at 10 AM, this section of US30 will be closed. Estimated date of completion is July 15, 2018 at 9 PM.

US97 NB & SB MP 58.00 to MP 59.00 (Shaniko)

Effective Sunday June 17, 2018 at 7 PM, this section of US97 northbound and southbound will be restricted to 13 feet 00 inches in width at all hours. Loads wider than 13 feet 00 inches in width may be accommodated on a case by case basis. Contact the OD Permit Unit for information. Estimated date of completion is Friday June 22, 2018 by 10 AM.

US97 NB & SB MP 74.04 (Madras)

Effective April 16, 2018, this section of US97 northbound and southbound will be restricted to 17 feet 00 inches in width. Loads wider than 17 feet 00 inches in width may be accommodated on a case by case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is October 31, 2018.

US97 NB & SB MP 75.04 (Madras)

Effective April 16, 2018, this section of US97 northbound and southbound will be restricted to 17 feet 08 inches in height. Estimated date of completion is October 31, 2018.

US97 NB & SB MP 103.00 to MP 114.00 (Terrebonne)

Effective June 3, 2018, this section of US97 northbound and southbound will be restricted to 14 feet 00 inches in width Sunday through Thursday nights from 1/2 hour after sunset to 1/2 hour before sunrise. Loads wider than 14 feet 00 inches in width may be accommodated on a case by case basis. Contract the OD Permit Unit for information. Estimated date of completion July 20, 2018.

US97 NB & SB MP 105.00 to MP 113.00 (Terrebonne) -- NEW --

Effective May 15, 2018, this section of US97 northbound and southbound will be restricted to 17 feet 00 inches in width Sunday through Thursday nights from 1/2 hour after sunset to 1/2 hour before sunrise. Loads wider than 17 feet 00 inches in width may be accommodated on a case by case absis. Contact the OD Permit Unit for information. Estimated date of completion June 16, 2018 .

US101 NB & SB MP 4.91 (New Young's Bay Bridge)

Effective June 14, 2018, the New Young's Bay Bridge on US101 northbound and southbound will be closed between 9 PM & 6 AM. Estimated date of completion is June 15, 2018.

US101 Bus EB & WB MP 6.89 (Old Youngs Bay Bridge - Astoria)

Effective June 21, 2018, this section of US101 Bus eastbound and westbound will be closed between the hours of 9 PM & 7 AM. Estimated date of completion is June 22, 2018.

US101 MP 233.99 (McCullough Bridge - Coos Bay)

Effective October 15, 2013, this section of US101 will be restricted to 11 feet 00 in. in width between the hours of 9 PM & 5 AM. Estimated date of completion is November 1, 2018.

US101 MP 244.00 to MP 244.09 NB & SB (Coos Bay) -- NEW --

Effective February 21, 2018, this section of US101 northbound and southbound will be restricted to 17 feet 00 inches in width. Loads wider than 17 feet 00 inches in width may be accommodated on a case by case basis. Contact the OD Permit Unit for information. Estimated date of completion is November 10, 2018 .

US101 MP 347.78 NB & SB (north of Brookings)

Effective July 31, 2017, this section of US101 will be restricted to 16 feet 00 in. in width. Estimated date of completion is August 31, 2019.

OR Routes

OR7 EB & WB MP 0.00 to MP 0.06 (Baker City)

Effective June 30, 2018, this section of OR7 will be closed between the hours of 9 AM & 8 PM, for one day only.

OR7 EB & WB MP 0.00 to MP 0.19 (Baker City) -- NEW --

Effective July 12, 2018 at 10 AM, this section of OR7 will be closed. Estimated date of completion is July 15, 2018 by 9 PM.

OR8 EB & WB MP 4.95 to MP 5.00 (Beaverton) -- NEW --

Effective June 22, 2018, this section of OR8 eastbound and westbound will be restricted to 17 feet 00 inches in width. Loads wider than 17 feet 00 inches in width may be accommodated on a case by case basis. Contact the OD Permit Unit for information. Estimated date of completion is July 22, 2018.

OR22 EB & WB MP 5.16 to MP 11.83 (Stayton)

Effective June 18, 2018, this section of OR22 eastbound and westbound will be restricted to 16 feet 00 inches in width Monday through Thursday between the hours of 9 AM & 4 PM. Estimated date of completion is June 21, 2018.

OR22 EB & WB MP 5.16 to MP 11.83 (Stayton)

Effective June 18, 2018, this section of OR22 eastbound will be restricted to 16 feet 7 inches in height and 17 feet 1 inch in height westbound, Monday through Thursday between the hours of 9 AM & 4 PM. Estimated date of completion is June 22, 2018.

OR22 EB & WB MP 55.00 to MP 81.00 (Idanha) -- NEW --

Effective July 9, 2018, this section of OR22 eastbound and westbound will be restricted to 8 feet 06 inches (LEGAL WIDTH). Loads wider than 8 feet 06 inches in width may be accommodated on a case by case basis. Contact the OD Permit Unit for information. The estimated date of completion is August 30, 2018.

OR34 MP 2.55 to MP 15.78 EB & WB (Corvallis)

Effective January 29, 2018, this section of OR34 eastbound and westbound will be restricted to 17 feet 00 inches in width, between the hours of 7 PM to 6 AM. Estimated date of completion is June 30, 2018.

OR38 MP 21 to MP 26 EB & WB (east of Scottsburg)

Effective August 28, 2017, this section of OR38 will be restricted to 14 feet 00 in. in width. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Estimated date of completion is August 15, 2018.

OR38 MP 41 to MP 42 EB & WB (west of Drain)

Effective August 28, 2017, this section of OR38 will be restricted to 14 feet 00 in. in width. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Estimated date of completion is August 15, 2018.

OR42 MP 25 to MP 26 EB & EB (Myrtle Point)

Effective January 29, 2018 this section of OR42 eastbound and westbound will be restricted to 18 feet 00 in. in width. Estimated date of completion is July 31, 2018.

OR42 MP 29.50 to MP 30.75 EB & WB (Bridge)

Effective February 26, 2018, this section of OR42 eastbound and westbound will be restricted to 18 feet 00 inches in width. Loads wider than 18 feet 00 inches in width can be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is July 30, 2018.

OR43 NB to I-5 NB on-ramp (Portland) -- NEW --

Effective July 27, 2018 at 10 PM, the OR43 northbound on-ramp to I-5 northbound will be closed at all hours. The estimated date of completion for this work is July 30, 2018 by 5 AM.

OR47 NB & SB MP 34.00 to MP 35.00 (Yamhill) -- NEW --

Effective July 21, 2018, this section of OR47 will be closed between the hours of 10 AM & 11 AM, for one day only.

OR47 NB & SB MP 69.72 to MP 69.87 (Beaver Creek Bridge - Vernonia)

Effective May 14, 2018, this section of OR47 northbound and southbound will be restricted to 14 feet 00 inches in width Monday through Friday between the hours of 9 AM & 6 PM. Loads wider than 14 feet 00 inches in width may be accommodated on a case by case basis. Contact the OD Permit Unit for information. Estimated date of completion is June 29, 2018.

OR47 NB & SB MP 69.72 to MP 69.87 (Beaver Creek Bridge - Vernonia)

Effective August 6, 2018 this section of OR47 northbound and southbound will be closed. The estimated date of completion is October 4, 2018 .

OR47 NB & SB MP 69.72 to MP 69.87 (Beaver Creek Bridge - Vernonia) -- NEW --

Effective July 2, 2018, this section of OR47 northbound and southbound will be restricted to 14 feet 00 inches in width Monday through Friday between the hours of 9 AM & 6 PM. Loads wider than 14 feet 00 inches in width may be accommodated on a case by case basis. Contact the OD Permit Unit for information. Estimated date of completion is August 3, 2018.

OR47 MP 88.05 NB & SB (Forest Grove)

Effective September 27, 2016, this section of OR47 is restricted to 14 feet 00 inches in width and 135 feet overall length. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 in. in width. Loads wider than 14 feet or 135 feet overall length may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information.

OR82 EB & WB MP 12.06 to MP 12.40 (Imbler) -- NEW --

Effective July 4, 2018, this section of OR82 will be closed between the hours of 11:30 AM & 1 PM, for one day only.

OR82 EB & WB MP 20.07 to MP 20.13 (Elgin) -- NEW --

Effective July 14, 2018, this section of OR82 will be closed between the hours of 9:30 AM & 11 AM, for one day only.

OR82 EB & WB MP 20.07 to MP 20.30 (Elgin) -- NEW --

Effective July 14, 2018, this section of OR82 will be closed between the hours of 3:30 PM & 5:30 PM, for one day only.

OR82 EB & WB MP 46.78 to MP 47.31 (Wallowa) -- NEW --

Effective July 4, 2018, this section of OR82 will be closed between the hours of 10:30 AM & 12:30 PM, for one day only.

OR86 EB & WB MP 41.23 to MP 42.40 (Richland)

Effective June 16, 2018, this section of OR86 eastbound and westbound will be closed between the hours of 10 AM & 11 AM, for one day only.

OR99W NB MP 4.28 to MP 4.37 (Portland)

Effective Friday June 8, 2018 at 9 PM, the OR99W on-ramp to I-5 northbound will be closed. Estimated date of completion is Monday June 11, 2018 by 5 AM.

OR99E NB & SB MP 12.43 to MP 13.00 (Oregon City)

Effective July 5, 2018, this section of OR99E northbound and southbound will be restricted to 8 feet 06 inches in width (LEGAL WIDTH). Estimated date of completion is August 1, 2018.

OR99E NB & SB MP 12.43 to MP 13.00 (Oregon City)

Effective July 5, 2018, this section of OR99E northbound will be restricted to 14 feet 5 inches in height and 14 feet 6 inches in height southbound. Estimated date of completion is August 1, 2018.

OR99E NB & SB MP 13.13 to MP 13.44 (Oregon City)

Effective June 11, 2018, this section of OR99E northbound and southbound will be restricted to 14 feet 00 inches in width. Loads wider than 14 feet 00 inches in width may be accommodated on a case by case basis. Contact the OD Permit Unit for information. Estimated date of completion is July 2, 2018.

OR99E NB & SB MP 28.59 to MP 28.89 (Harrisburg) -- NEW --

Effective July 4, 2018, this section of OR99E will be closed between the hours of 10:30 AM & 1:00 PM, for one day only.

OR204 EB & WB MP 40.38 to MP 40.73 (Elgin) -- NEW --

Effective July 14, 2018, this section of OR204 will be closed between the hours of 3:30 PM & 5:30 PM, for one day only.

OR213 MP 9.14 to MP 10.90 SB (Mulino)

Effective July 3, 2017, this section of OR213 southbound will be restricted to 9 feet 00 in. in width. Estimated date of completion is December 31, 2017.

OR213 MP 10.90 to MP 9.14 NB (Mulino)

Effective July 3, 2017, this section of OR213 northbound will be restricted to 12 feet 00 in. in width. Estimated date of completion is December 31, 2017.

OR213 MP 12.16 to MP 12.40 NB & SB (Mulino)

Effective March 1, 2018, this section of OR213 northbound and southbound will be restricted to 12 feet 00 inches in width Monday through Thursday between the hours of 7 PM & 6 AM. Estimated date of completion is June 15, 2018.

OR214 NB & SB MP 17 to MP 19 (Sublimity)

Effective June 8, 2018, this section of OR214 northbound and southbound will be restricted to 12 feet 00 inches in width Monday through Friday between the hours of 7 AM & 7 PM. Loads wider than 12 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the OD Permit Unit for information. Estimated date of completion is July 5, 2018.

OR217 NB & SB Exit 3 (Denney Rd - Beaverton)

Effective July 7, 2018, the OR217 northbound and southbound on/off ramps (Exit 3) will be closed between the hours of 6 AM & 1 PM, for one day only.

OR334 EB & WB MP 17.34 to MP 17.42 (Athena)

Effective June 29, 2018, this section of OR334 eastbound and westbound will be closed between the hours of 4 PM & 11PM, for one day only.

OR569 EB & WB MP 4.38 to MP 11.67 (Eugene)

Effective May 29, 2018 , the following eastbound and westbound ramps will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM: Barger Dr Exit; Prairie Rd Exit; Northwest Expressway Exit; River Rd Exit ; Division Ave Exit; Delta Hwy Exit; and Coburg Rd Exit. Estimated date of completion is June 7, 2018 .

OR569 EB & WB MP 4.38 to MP 11.67 (Eugene)

Effective May 29, 2018, this section of OR569 eastbound will be restricted to 15 feet 7 inches in height, and westbound will be restricted to 15 feet 6 inches in height. Estimated date of completion is October 1, 2018.

OR569 EB & WB MP 4.38 to MP 11.67 (Eugene)

Effective May 29, 2018, this section of OR569 eastbound and westbound will be restricted to 11 feet 00 inches in width Sunday through Thursday nights between the hours of 9 PM & 5 AM. Loads wider than 11 feet 00 inches in width may be accommodated on a case by case basis. Contact the OD Permit Unit for information. Estimated date of completion is October 1, 2018.

OR569 WB MP 4.38 to MP 11.67 (Eugene)

Effective May 29, 2018, this section of OR569 westbound will be restricted to 9 feet 00 inches in width Sunday through Thursday nights between the hours of 9 PM & 5 AM. Loads wider than 9 feet 00 inches in width may be accommodated on a case by case basis. Contact the OD Permit Unit for information. Estimated date of completion is June 13, 2018.

OR569 EB & WB MP 4.38 to MP 8.00 (Eugene)

Effective May 16, 2018, this section of OR569 eastbound and westbound will be restricted to 14 feet 00 inches in width Sunday through Thursday nights between the hours of 9 PM & 5 AM. Loads wider than 14 feet 00 inches in width may be accommodated on a case by case basis. Contact the OD Permit Unit for information. Estimated date of completion is October 1, 2018.

OR569 EB & WB MP 4.38 to MP 8.00 (Eugene)

Effective May 16, 2018, this section of OR569 eastbound will be restricted to 16 feet 6 inches in height and westbound will be restricted to 17 feet 00 inches in height, Sunday through Thursday nights between the hours of 9 PM & 5 AM. Estimated date of completion is October 1, 2018.

OR569 EB & WB Exit 6 to OR99 (Eugene)

Effective June 10, 2018 , the OR569 eastbound and westbound on/off ramps (Exit 6) to OR99 will be intermittently closed Sunday through Thursday nights between the hours of 9 PM & 5 AM. Estimated date of completion is June 21, 2018 .

OR569 WB MP 9.80 to MP 10.30 (Eugene)

Effective June 10, 2018, this section of OR569 westbound will be closed Sunday through Thursday nights between the hours of 9 PM & 5 AM. Estimated date of completion is June 22, 2018.

Lifted Restrictions

I-84 EB & WB MP 10.01 to MP 12.20 (Gresham)

Effective May 21, 2018, this section of I-84 eastbound will be restricted to 18 feet 4 inches in height and westbound will be restricted to 19 feet 1 inch between the hours of 10 PM to 5:30 AM. Estimated date of completion is July 20, 2018.

OR217 NB & SB Exit 3 (Denney Rd - Beaverton)

Effective June 3, 2018, the OR217 northbound and southbound on/off ramps (Exit 3) will be closed from 6:30 AM to 1 PM, for one day only.

BRIDGE RESTRICTIONS

Interstate Routes

I-5 MP 104.85 Chadwick Ln crossing over I-5 (near Riddle)

Chadwick Ln crossing over I-5 is restricted to the following weights: 20,000 single axle, 34,000 lbs. tandem axle - 80,000 lbs. GVW. Weight Table 1.

I-5 MP 151.81 Wilson Rd crossing over I-5 (Yoncalla)

Wilson Rd crossing over I-5 is restricted to the following weights: 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.

I-84 MP 256.42 Upper Perry Interchange crossing over I-84 (Perry)

Upper Perry Interchange crossing over I-84 is restricted to the following weights: 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW, Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.

I-84 MP 280.53 McCanse Rd crossing over I-84 (west of Baker City)

Effective March 5, 2018, McCanse Rd crossing over I-84 is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW, Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW, Weight Table 3 for non-divisible loads. Non-divisible loads exceeding these weights may cross the bridge if they stop traffic/straddle the centerline and are the only vehicle on the bridge when crossing. Certified flaggers are required to stop traffic.

I-84 MP 291.65 Charles Green Ln crossing over I-84 (west of Baker City)

Effective March 5, 2018, Charles Green Ln crossing over I-84 is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW, Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW, Weight Table 3 for non-divisible loads. Non-divisible loads exceeding these weights may cross the bridge if they stop traffic/straddle the centerline and are the only vehicle on the bridge when crossing. Certified flaggers are required to stop traffic.

I-84 MP 295.67 Culley Ln crossing over I-84 (west of Baker City)

Effective March 5, 2018, Culley Ln crossing over I-84 is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW, Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW, Weight Table 3 for non-divisible loads. Non-divisible loads exceeding these weights may cross the bridge if they stop traffic/straddle the centerline and are the only vehicle on the bridge when crossing. Certified flaggers are required to stop traffic.

U.S. Routes

US30 (Historic Columbia River Hwy) MP 0.03 (Sandy River Bridge - Troutdale)

Effective May 3, 2017, US30 (Historic Columbia River Highway) crossing the Sandy River Bridge is restricted to the following weights: 21 tons for Type 3 Vehicles (3-axle single-unit trucks); 19 tons for SU4 Vehicles (4-axle single-unit trucks); 21 tons for SU5, SU6 & SU7 Vehicles (5 to 7 axle single-unit trucks); 26 tons for Type 3S2 (truck tractor/semitrailer) and Type 3-3 (truck and trailer) Vehicles.

US30 (Huntington Hwy) MP 0.46 (Burnt River Bridge - Lime)

Effective June 16, 2011, the Burnt River Bridge near Lime just off I-84 is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.

US30 (Historic Columbia River Hwy) MP 13.14 (Shepperds Dell Bridge)

US30 (Historic Columbia River Hwy) crossing Youngs Creek (Shepperds Dell) Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, Weight Table 1.

US30 (Historic Columbia River Hwy) MP 17.68 (West Multnomah Falls Bridge)

US30 (Historic Columbia River Hwy) crossing West Multnomah Falls Bridge is restricted to 28,000 lbs. for solo vehicles, 44,000 lbs. for 3-2 combinations, and 56,000 lbs. for 3-3 combinations.

US30 (Historic Columbia River Hwy) MP 20.39 (Horsetail Creek Bridge)

US30 (Historic Columbia River Hwy) crossing Horsetail Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, Weight Table 1.

US30 MP 30.42 (Bridge of the Gods - Cascade Locks)

Effective December 24, 2013, the Bridge of the Gods at US30 MP 30.42 is restricted to 80,000 lbs. GVW, Weight Table 1. This bridge belongs to the Port of Cascade Locks.

US30 OR/WA Border at Rainier (Lewis & Clark Bridge)

The Columbia River (Lewis & Clark) Bridge between Rainier, OR and Longview, WA is restricted to 21,500 lbs. per axle, no gross weight restriction. Contact the State of Washington at (360) 704-6340 for current information regarding size restrictions for this bridge.

US101 Business MP 4.78 (Lewis & Clark River Bridge - Astoria)

US101 Business crossing Lewis & Clark River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 80,000 lbs. GVW, Weight Table 1.

US101 Business MP 6.89 (Old Youngs Bay Bridge - Astoria)

Effective November 10, 2009, US101 Business crossing the Old Youngs Bay Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW, Weight Table 2.

US101 MP 141.67 (Yaquina Bay Bridge - Newport)

Effective March 1, 2013, the Yaquina Bay Bridge in Newport is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW, Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW, Weight Table 3 for non-divisible loads. Non-divisible loads exceeding these weights (up to Weight Table 5) may cross the bridge if they stop traffic/straddle the centerline and are the only vehicle on the bridge when crossing. Certified flaggers are required to stop both northbound and southbound traffic. The rolling stop method is not allowed.

US101 MP 190.98 (Siuslaw River Bridge - Florence)

Effective March 17, 2003, the Siuslaw River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW. Weight Table 3 for non-divisible loads.

US101 MP 311.40 (Reinhart Creek Bridge - south of Port Orford)

Effective March 1, 2017, US101 crossing the Reinhart Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW, Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW, Weight Table 3 for non-divisible loads. Non-divisible loads exceeding these weights may cross the bridge if they stop oncoming traffic and straddle the centerline. Certified flaggers are required to stop oncoming traffic. Effective May 5, 2017, during construction, on-site certified flaggers may be provided to the carrier at no cost on a case-by-case basis during construction hours. Contact the Over-Dimension Permit Unit for information.

OR Routes

OR18 MP 51.57 (Yamhill River Bridge - Dayton)

OR18 crossing Yamhill River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.

OR22 MP 10.49 (Louie Creek Bridge - Dolph)

OR22 crossing Louie Creek Bridge is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, Weight Table 3 only.

OR22 MP 10.66 (Louie Creek Bridge - Dolph)

OR22 crossing Louie Creek Bridge is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, Weight Table 3 only.

Santiam River Bridge - Mill City (not on OR22 mainline)

1st St crossing Santiam River Bridge in Mill City is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2. This restriction is NOT on the OR22 mainline.

OR27 MP 1.90 (Irrigation Ditch - Prineville)

OR27 crossing Irrigation Ditch at MP 1.90 is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle, Weight Table 4.

OR27 MP 2.88 (Irrigation Ditch - Prineville)

OR27 crossing Irrigation Ditch at MP 2.88 is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle, Weight Table 4.

OR27 MP 4.62 (Irrigation Ditch - Prineville)

OR27 crossing Irrigation Ditch at MP 4.62 is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle, Weight Table 4.

OR27 MP 27.23 (Bear Creek Bridge - south of Prineville)

OR27 crossing Bear Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs GVW, Weight Table 2.

Old OR34 EB MP 0.13 (Willamette River / Van Buren St Bridge - Corvallis)

Old OR34 eastbound crossing Willamette River (Van Buren St) Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 80,000 lbs. GVW., Weight Table 1.

OR35 crossing Columbia River (White Salmon) Bridge - Hood River

OR35 crossing the Columbia River (White Salmon) Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 80,000 lbs. GVW, Weight Table 1. Bridge belongs to Port of Hood River.

OR43 MP 11.43 (Willamette River Arch Bridge - Oregon City)

OR43 crossing the Willamette River Arch Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 80,000 lbs. GVW, Weight Table 1.

OR53 MP 5.98 (Jack Horner Creek Bridge)

OR53 crossing Jack Horner Creek Bridge is restricted to 20,000 lbs. single axle, 40,000 lbs tandem axle, Weight Table 3.

OR86 MP 40.64 (Eagle Creek Bridge - Richland)

Effective October 20, 2016, all single-trip permit holders over continuous trip permit weights must stop all traffic, straddle centerline, and be the only vehicle on bridge when crossing.

OR99W MP -5.5 (Crossing over Victory Blvd - Portland)

Effective March 6, 2018, OR99W crossing Victory Blvd. is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.

OR104 Spur MP 4.62 (Skipanon River Bridge - Warrenton)

Effective April 4, 2011, OR104 Spur crossing the Skipanon River Bridge is restricted to 38,000 lbs. for solo trucks, 56,000 lbs. for 3-2 axle truck combinations, 64,000 lbs. for 3-3 axle (or more) truck combinations.

OR120 (Swift Hwy / Portland Rd) MP 0.38 (Columbia Slough Bridge - Portland)

OR120 (Swift Hwy / Portland Rd) crossing Columbia Slough Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.

OR130 (Little Nestucca Hwy) MP 3.23 (Panther Creek Bridge)

OR130 (Little Nestucca Hwy) crossing Panther Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.

OR130 (Little Nestucca Hwy) MP 3.60 (Squaw Creek Bridge)

OR130 (Little Nestucca Hwy) crossing Squaw Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.

OR130 (Little Nestucca Hwy) MP 3.82 (Austin Creek Bridge)

OR130 (Little Nestucca Hwy) crossing Austin Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.

OR130 (Little Nestucca Hwy) MP 4.15 (Little Nestucca River Bridge)

OR130 (Little Nestucca Hwy) crossing Little Nestucca River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.

OR130 (Little Nestucca Hwy) MP 4.76 (Bear Creek Bridge)

OR130 (Little Nestucca Hwy) crossing Bear Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.

OR164 (Jefferson Hwy) MP 6.24 (Santiam River Bridge - Jefferson)

OR164 crossing the Santiam River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW. Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.

OR213 MP 9.14 to MP 10.97 NB & SB (Mulino)

Effective March 20, 2017, this section of OR213 is restricted to the following weights: 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW., Weight Table 3 for non-divisible loads . Estimated date of completion is December 31, 2018 .

OR219 MP 23.46 (Willamette River Bridge - south of Newberg)

OR219 crossing Willamette River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle. 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.

OR234 MP 0.04 (Rogue River Bridge - west of Gold Hill)

OR234 crossing Rogue River Bridge west of Gold Hill is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW, Weight Table 2 for divisible Loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW, Weight Table 3 for non-divisible loads.

OR241 MP 0.51 (Isthmus Slough)

MP 0.51 Isthmus Slough (1/2 mile from US101) is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 80,000 lbs. GVW., Weight Table 1

OR339 (Freewater Hwy) MP 2.76 (West Crockett Branch Bridge - Milton-Freewater)

OR339 (Freewater Hwy) crossing West Crockett Branch Bridge is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle, Weight Table 4.

OR339 (Freewater Hwy) MP 3.16 (East Fork Little Walla Walla River Bridge - Milton-Freewater)

OR339 (Freewater Hwy) crossing East Fork Little Walla Walla River Bridge is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle, Weight Table 4.

OR339 (Freewater Hwy) MP 3.31 (West Fork Little Walla Walla River Bridge - Milton-Freewater)

OR339 (Freewater Hwy) crossing West Fork Little Walla Walla River Bridge is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle, Weight Table 4.

Other Jurisdictions

Old OR99 (DC388) Old Winchester Bridge (Roseburg)

Old Winchester Bridge on DC388 (Old 99) at MP12.21 is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW.- Weight Table 2 Divisible Loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW.- Weight Table 3 Non- Divisible Loads.

Request email notification when restrictions change.