Road Restrictions 9/4/2015

To find the route from the RD_ID see the Route / Hwy. No. Cross-Reference table.

Print Road & Bridge Restrictions     Print Road Restrictions Only

ROAD RESTRICTIONS

Interstate Routes

I-5 MP 162 to MP 170 NB & SB (south of Cottage Grove)

Effective July 8, 2015, this section of I-5 will be restricted to 16 feet 00 in. in width, and 16 feet 11 in. in height Sunday through Thursday nights between the hours of 7 PM & 7 AM. Estimated date of completion is September 1, 2015.

I-5 MP 216 to MP 233 NB & SB (Halsey to Albany) -- NEW --

Effective September 14, 2015, this section of I-5 will be restricted to 16 feet 00 in. in width between the hours of 9 PM & 5:30 AM. Estimated date of completion is September 24, 2015.

I-5 MP 227.09 NB & SB (crossing under Boston Mill Dr - Halsey) -- NEW --

Effective September 14, 2015, this section of I-5 will be restricted to 16 feet 07 in. in height northbound and southbound, between the hours of 9 PM & 5:30 AM. Estimated date of completion is September 24, 2015.

I-5 MP 227.09 NB & SB (crossing under Tangent Dr - Tangent) -- NEW --

Effective September 14, 2015, this section of I-5 will be restricted to 16 feet 07 in. in height northbound, and 16 feet 05 in. in height southbound, between the hours of 9 PM & 5:30 AM. Estimated date of completion is September 24, 2015.

I-5 NB Exit 235 ramp to Viewcrest (north of Albany)

Effective September 8, 2015, the ramp from I-5 northbound Exit 235 to Viewcrest will be closed between the hours of 9 PM & 5:30 AM. Estimated date of completion is September 9, 2015.

I-5 SB Exit 252 ramp to Kuebler Blvd (Salem)

Effective July 13, 2015, the I-5 SB Exit 252 off-ramp to Kuebler Blvd will be restricted to 14 feet 00 in. in width. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 in. in width. Estimated date of completion is September 30, 2015.

I-5 SB on- and off-ramps to/from Market St (Exit 256 / Salem)

Effective September 7, 2015, the I-5 southbound on- and off-ramps to/from Market St will be intermittently closed between the hours of 8 PM & 5 AM. Estimated date of completion is September 17, 2015.

I-5 NB on-ramp from Market St (Exit 256 / Salem)

Effective September 7, 2015, the I-5 northbound on-ramp from Market St will be intermittently closed between the hours of 8 PM & 5 AM. Estimated date of completion is September 17, 2015.

I-5 SB on-ramps from OR99E (Exit 258 / Salem)

Effective September 7, 2015, the I-5 southbound on-ramps from OR99E will be intermittently closed between the hours of 8 PM & 5 AM. Estimated date of completion is September 17, 2015.

I-5 NB on-ramps from OR99E (Exit 258 / Salem)

Effective September 7, 2015, the I-5 northbound on-ramps from OR99E will be intermittently closed between the hours of 8 PM & 5 AM. Estimated date of completion is September 17, 2015.

I-5 MP 271.35 to MP 276.01 NB & SB (Woodburn)

Effective August 26, 2013, this section of I-5 southbound will be restricted to 17 feet 01 in. in height. Effective November 13, 2014, this section of I-5 northbound will be restricted to 16 feet 09 in. in height. Estimated date of completion is September 30, 2016.

I-5 NB & SB Exit 271 ramps to / from OR214 / OR219 (Woodburn)

Effective November 13, 2014, the on- and off-ramps to/from I-5 northbound and southbound Exit 271 to OR214 and OR219 will be restricted to 16 feet 00 in. in width. Mobile homes with eaves are allowed, provided the base width does not exceed 16 feet 00 in. in width. Estimated date of completion is September 30, 2016.

I-5 MP 293.62 NB (Truck Lane - Portland) -- NEW --

Effective April 22, 2015, the I-5 northbound truck lane will be closed on Monday through Friday between the hours of 8 PM & 5 AM, and on Saturdays between the hours of 8 PM & 8 AM. When closed, truck traffic will be directed to remain on the I-5 northbound mainline. Estimated date of completion is September 30, 2015.

I-5 MP 293.6 to MP 301.0 NB & SB (Portland) -- NEW --

Effective May 14, 2015, this section of I-5 will be restricted to 12 feet 00 in. in width between the hours of 10 PM & 8 AM. In addition, the height will be restricted to 14 feet 10 in. in height northbound, and 15 feet 00 in. in height southbound during the same time. Effective September 19, 2015, these restrictions will be in place Sunday to Thursday nights between the hours of 10 PM & 8 AM, Friday and Saturday nights between the hours of 10 PM & 12 noon. Estimated date of completion is October 30, 2015.

I-5 MP 301 to MP 294 SB ramps (Portland)

Effective June 1, 2015, the following ramps will be intermittently closed between the hours of 8 PM & 9 AM: ramp from Harbor Dr to I-5 SB; I-5 SB Exit 299A to OR43 / Lake Oswego; ramp from Hood Ave to I-5 SB; I-5 SB Exit 297 to Terwilliger Blvd; I-5 SB Exit 296B to Multnomah Blvd; I-5 SB Exit 296A to Barbur Blvd; I-5 SB Exit 295 to Capitol Hwy; ramp from Capitol Hwy to I-5 SB. Estimated date of completion is September 30, 2015.

I-5 MP 294 to MP 301 NB ramps (Portland)

Effective June 1, 2015, the following ramps will be intermittently closed between the hours of 8 PM & 9 AM: ramp from Barbur Blvd to I-5 NB (near Exit 294); I-5 NB Exit 295 to Taylors Ferry Rd; ramp from Capitol Hwy to I-5 NB; ramp from Spring Garden St to I-5 NB; I-5 NB Exit 297 to / from Terwilliger Blvd ; ramp from Multnomah Blvd to I-5 NB; I-5 NB Exit 298 to Corbett Ave; I-5 NB Exit 299A to / from OR43 / Macadam Ave. Estimated date of completion is September 30, 2015.

I-5 MP 298 to MP 306 NB & SB (Portland)

Effective February 9, 2015, this section of I-5 will be restricted to 13 feet 00 in. in width between the hours of 10 PM & 5 AM. Estimated date of completion is October 30, 2015.

I-5 MP 298 to MP 306 NB & SB (Portland)

Effective February 9, 2015, this section of I-5 will be restricted to 15 feet 05 in. in height northbound, and 14 feet 06 in. in height southbound between the hours of 8 PM & 8 AM. Estimated date of completion is October 30, 2015.

I-5 NB Exit 298 ramp to Corbett Ave (Portland)

Effective March 2, 2015, the ramp from I-5 northbound Exit 298 to Corbett Ave will be intermittently closed per the following schedule: Monday through Friday between the hours of 9 PM & 6 AM; Saturday and Sunday between the hours of 9 PM & 7 AM. Estimated date of completion is October 30, 2015.

I-5 NB Exit 299A ramp to Macadam Ave (OR43) NB (Portland)

Effective March 2, 2015, the ramp from I-5 northbound Exit 299A to Macadam Ave (OR43) northbound will be intermittently closed per the following schedule: Monday through Friday between the hours of 9 PM & 6 AM; Saturday and Sunday between the hours of 9 PM & 7 AM. Estimated date of completion is November 30, 2015.

I-5 SB MP 303.08 to MP 299.00 (Portland) -- NEW --

Effective June 1, 2015, this section of I-5 will be intermittently closed between the hours of 10 PM & 8 AM. Estimated date of completion is October 30, 2015.

I-5 SB MP 303.08 to MP 299.00 ramps (Portland) -- NEW --

Effective June 1, 2015, the following ramps will be intermittently closed between the hours of 10 PM & 8 AM: ramp from Greeley Avenue to I-5 southbound; ramp from I-405 northbound to I-5 southbound; ramps to / from I-5 southbound Exit 302A to/from Moda Center; I-5 southbound Exit 301 ramp to I-84 eastbound; I-84 southbound Exit 300B ramp to US26 / OR99E / OMSI / Oregon City; ramp from I-84 westbound to I-5 southbound; ramp from I-5 southbound to I-405 northbound; I-5 southbound Exit 299A ramp to OR43 southbound. In addition, effective September 19, 2015, the following ramps will be closed on Sunday to Thursday nights between the hours of 10 PM & 8 AM, Friday and Saturday nights between the hours of 10 PM & 12 noon: ramp from Greeley Avenue to I-5 southbound; ramp from N Weidler / N Wheeler / N Winning Way to I-5 southbound; ramp from i-405 northbound to I-5 southbound. Estimated date of completion is October 30, 2015.

I-5 NB Exit 299B ramp to I-405 NB and Naito Pkwy (Portland) -- NEW --

Effective June 15, 2015, the ramp from I-5 northbound to I-405 northbound and Naito Pkwy will be intermittently closed between the hours of 10 PM & 8 AM. Estimated date of completion is October 15, 2015.

I-5 MP 299.9 to MP 300.1 NB (Marquam Bridge - Portland) -- NEW --

Effective June 15, 2015, this section of I-5 northbound will be intermittently closed between the hours of 10 PM & 8 AM. Estimated date of completion is October 15, 2015.

I-5 MP 300.23 to MP 301.42 NB & SB (Portland)

Effective August 7, 2015, this section of I-5 will be intermittently closed between the hours of 10 PM & 5 AM. In addition, the following ramps will be closed during the same time: I-405 SB to I-5 NB; SW 5th Ave to I-405 SB; OR43 to I-5 NB; I-5 NB Exit 300 to I-84 EB; I-405 NB to I-5 SB; N Greeley Ave to I-5 SB; N Weidler / N Wheeler / N Winning Way to I-5 SB; I-84 WB to I-5 SB. Estimated date of completion is September 30, 2015.

I-5 SB ramp to I-405 NB (Portland)

Effective September 30, 2015, the I-5 southbound ramp to I-405 northbound will be restricted to 13 feet 00 in. in width between the hours of 10 PM & 5 AM. Estimated date of completion is October 1, 2015.

I-5 MP 300.32 to MP 301.13 NB (Portland)

Effective June 19, 2015, this section of I-5 northbound will be intermittently closed between the hours of 10 PM & 5 AM. Estimated date of completion is September 20, 2015.

I-5 NB Exit 300 ramp to I-84 EB (Portland)

Effective June 19, 2015, the ramp from I-5 northbound Exit 300 to I-84 eastbound will be intermittently closed between the hours of 10 PM & 5 AM. Estimated date of completion is September 20, 2015.

I-5 SB Exit 300B ramp to US26 / OR99E (Portland)

Effective March 2, 2015, the ramp from I-5 southbound Exit 300B to US26 / OR99E will be intermittently closed per the following schedule: Monday through Friday between the hours of 9 PM & 6 AM; Saturday and Sunday between the hours of 9 PM & 7 AM. Estimated date of completion is October 30, 2015.

I-5 SB Exit 300B ramp to US26 / OR99E (Portland)

Effective July 31, 2015, the ramp from I-5 southbound Exit 300B to US26 / OR99E will be intermittently closed between the hours of 9 PM & 6 AM. Estimated date of completion is October 30, 2015.

I-5 SB Exit 301 ramp to I-84 EB (Portland)

Effective August 28, 2015, the ramp from I-5 southbound Exit 301 to I-84 eastbound will be closed on the following nights between the hours of 10 PM & 6 AM: August 28, 2015; August 29, 2015; September 11, 2015; September 12, 2015. Estimated date of completion is September 13, 2015.

I-5 SB Exit 301 to I-84 EB (Portland)

Effective September 18, 2015, the I-5 southbound Exit 301 to I-84 eastbound will be closed between the hours of 9:30 PM & 6 AM. Estimated date of completion is September 19, 2015.

I-5 SB ramp from Weidler St / Wheeler Ave / Winning Way (Portland)

Effective March 2, 2015, the ramp from Weidler St / Wheeler Ave / Winning Way to I-5 southbound will be intermittently closed per the following schedule: Monday through Friday between the hours of 9 PM & 6 AM; Saturday and Sunday between the hours of 9 PM & 7 AM. Estimated date of completion is October 30, 2015.

I-5 SB ramp from Weidler St / Wheeler Ave / Winning Way (Portland)

Effective August 28, 2015, the ramp from Weidler St / Wheeler Ave / Winning Way to I-5 southbound will be closed on the following nights between the hours of 10 PM & 6 AM: August 28, 2015; August 29, 2015; September 11, 2015; September 12, 2015. Estimated date of completion is September 13, 2015.

I-5 SB on-ramp from Weidler St / Wheeler Ave / Winning Way (Portland)

Effective September 18, 2015, the ramp from Weidler St / Wheeler Ave / Winning Way to I-5 southbound will be closed between the hours of 10 PM & 6 AM. Estimated date of completion is September 19, 2015.

I-5 MP 302.1 to MP 302.8 NB & SB (Portland)

Effective September 7, 2015, this section of I-5 will be intermittently closed between the hours of 10 PM & 5 AM. In addition, the following ramps will be closed during the same time: I-84 WB ramp to I-5 NB; I-5 NB Exit 300 to I-84 EB; I-405 SB ramp to I-5 NB; SW 5th Ave ramp to I-405 SB; OR43 (Macadam Ave) ramp to I-5 NB; NE Broadway/N Williams to I-5 NB; I-405 NB ramp to I-5 SB; N Greeley Ave to I-5 SB. Estimated date of completion is October 10, 2015.

I-5 NB on-ramp from Broadway St (Portland)

Effective March 2, 2015, the ramp from Broadway St to I-5 northbound will be intermittently closed per the following schedule: Monday through Friday between the hours of 9 PM & 6 AM; Saturday and Sunday between the hours of 9 PM & 7 AM. Estimated date of completion is October 30, 2015.

I-5 SB Exit 303 ramp to Alberta St / Swan Island (Portland)

Effective March 2, 2015, the ramp from I-5 southbound Exit 303 to Alberta St / Swan Island will be intermittently closed per the following schedule: Monday through Friday between the hours of 9 PM & 6 AM; Saturday and Sunday between the hours of 9 PM & 7 AM. Estimated date of completion is October 30, 2015.

I-5 MP 304.60 to MP 305.20 SB (Portland)

Effective September 27, 2015, this section of I-5 southbound will be restricted to 12 feet 00 in. in width and 15 feet 11 in. in height between the hours of 5 AM & 8:30 AM. Estimated date of completion is September 27, 2015.

I-5 SB Exit 304 (Rosa Parks Way) on- and off-ramps (Portland)

Effective September 27, 2015, the I-5 southbound Exit 304 on- and off-ramps to/from Rosa Parks Way will be closed between the hours of 5 AM & 8:30 AM. Estimated date of completion is September 27, 2015.

I-5 SB Exit 304 ramp to Rosa Parks Way (Portland)

Effective March 2, 2015, the ramp from I-5 southbound Exit 304 to Rosa Parks Way will be intermittently closed per the following schedule: Monday through Friday between the hours of 9 PM & 6 AM; Saturday and Sunday between the hours of 9 PM & 7 AM. Estimated date of completion is October 30, 2015.

I-5 NB Exit 305A ramp to Lombard St (US30 Bypass) EB (Portland)

Effective March 2, 2015, the ramp from I-5 northbound Exit 305A to Lombard St (US30 Bypass) eastbound will be intermittently closed between the hours of 10 PM & 5 AM. Estimated date of completion is November 30, 2015.

I-5 SB on-ramp from EB US30 Bypass (Portland)

Effective September 27, 2015, the I-5 southbound on-ramp from eastbound US30 Bypass (Lombard St) will be closed between the hours of 5 AM & 8:30 AM. Estimated date of completion is September 27, 2015.

I-5 NB Exit 305B ramp to Lombard St (US30 Bypass) WB (Portland)

Effective March 2, 2015, the ramp from I-5 northbound Exit 305B to Lombard St (US30 Bypass) westbound will be intermittently closed between the hours of 10 PM & 5 AM. Estimated date of completion is November 30, 2015.

I-5 MP 307.00 to MP 308.38 NB (Portland)

Effective September 12, 2015, this section of I-5 northbound will be restricted to 12 feet 00 in. in width between the hours of 11 PM & 9 AM. Estimated date of completion is September 13, 2015.

I-5 NB on-ramp from Jantzen Beach (Portland)

Effective September 12, 2015, the ramp from Jantzen Beach to I-5 northbound will be closed between the hours of 11 PM & 9 AM. Estimated date of completion is September 13, 2015.

I-84 MP 0 to MP 2 EB (Portland)

Effective September 18, 2015, this section of I-84 eastbound will be restricted to 12 feet 00 in. in width and 15 feet 07 in. in height between the hours of 9:30 PM & 6 AM. Estimated date of completion is September 19, 2015.

I-84 MP 2 to MP 0 WB (Portland)

Effective September 18, 2015, this section of I-84 westbound will be restricted to 19 feet 00 in. in width and 14 feet 11 in. in height between the hours of 9:30 PM & 6 AM. Estimated date of completion is September 19, 2015.

I-84 WB ramp to City Center / OMSI / Morrison Bridge (Portland)

Effective March 2, 2015, the ramp from I-84 westbound to City Center / OMSI / Morrison Bridge will be intermittently closed per the following schedule: Monday through Friday between the hours of 9 PM & 6 AM; Saturday and Sunday between the hours of 9 PM & 7 AM. The ramp from I-84 WB to I-5 SB will remain open. Estimated date of completion is October 30, 2015.

I-84 EB on-ramp from OR99E (Grand Ave - Portland)

Effective September 18, 2015, the I-84 eastbound on-ramp from OR99E (Grand Ave) will be closed between the hours of 9:30 PM & 6 AM. Estimated date of completion is September 19, 2015.

I-84 EB on-ramp from Morrison Street Bridge (Portland)

Effective September 18, 2015, the I-84 eastbound on-ramp from the Morrison Street Bridge will be closed between the hours of 9:30 PM & 6 AM. Estimated date of completion is September 19, 2015.

I-84 WB on-ramp from Glisan St (Portland) -- NEW --

Effective September 26, 2015, the I-84 westbound on-ramp from Glisan St. will be closed between the hours of 9 PM & 10 AM. Estimated date of completion is September 27, 2015.

I-84 WB Exit 9 to I-205 SB (Portland) -- NEW --

Effective September 27, 2015, the I-84 westbound Exit 9 to I-205 southbound will be closed between the hours of 4 AM & 9 AM. Estimated date of completion is September 27, 2015.

I-84 EB Exit 17 to Troutdale

Effective September 1, 2015, the ramp from I-84 eastbound Exit 17 to Troutdale will be intermittently closed between the hours of 10 PM & 5 AM. Estimated date of completion is September 30, 2015.

I-84 WB on-ramp from N Sundial Frontage Road (Troutdale)

Effective July 29, 2015, the ramp from N Sundial Frontage Road (Troutdale) to I-84 westbound will be intermittently closed between the hours of 10 PM & 5 AM (NIGHTTIME). Estimated date of completion is September 25, 2015.

Marine Dr SB crossing under I-84 (Troutdale)

Effective June 26, 2015 at 10 PM, Marine Dr southbound crossing under I-84 will be closed. This closure is NOT on the I-84 mainline, and the I-84 eastbound and westbound Exit 17 ramps will remain open. Marine Dr will re-open by 5 AM on Monday, June 29, 2015.

I-84 MP 22 to MP 64 EB & WB (Corbett-Hood River)

Effective September 14, 2015, this section of I-84 will be restricted to 12 feet 00 in. in width between the hours of 8 PM & 6 AM. Estimated date of completion is September 16, 2015.

I-84 MP 45.60 to MP 64.50 EB & WB (Cascade Locks-Hood River)

Effective July 26, 2015, this section of I-84 will be restricted to 19 feet 00 in. in width from Midnight Sunday night to 12 Noon on Fridays. Estimated date of completion is November 30, 2016.

I-84 MP 62.05 WB (Crossing Under Exit 62/US30 - Hood River)

Effective July 26, 2015, I-84 westbound crossing under Exit 62 (US30) will be restricted to 15 feet 05 in. in height. Estimated date of completion is November 30, 2016.

I-84 MP 63.92 WB (Crossing Under Exit 63/2nd St - Hood River)

Effective July 26, 2015, I-84 westbound crossing under Exit 63 (2nd St) will be restricted to 15 feet 09 in. in height. Estimated date of completion is November 30, 2016.

I-84 MP 83.96 to MP 88.04 EB & WB (The Dalles)

Effective September 8, 2015, this section of I-84 will be restricted to 16 feet 00 in. in width. Estimated date of completion is November 24, 2015.

I-84 WB Exit 85 on- and off-ramps to / from The Dalles City Center

Effective September 8, 2015, the I-84 westbound Exit 85 on- and off-ramps to / from The Dalles City Center will be intermittently closed between the hours of 10 PM & 5 AM. Estimated date of completion is November 24, 2015.

I-84 WB crossing under Brewery Grade Interchange Exit 85 (The Dalles)

Effective September 8, 2015, this section of I-84 westbound will be restricted 16 feet 09 in. in height. Estimated date of completion is November 24, 2015.

I-84 EB Exit 87 ramp to US197 (The Dalles)

Effective August 14, 2015, the ramp from I-84 eastbound Exit 87 to US197 will be intermittently closed Monday through Friday between the hours of 10 PM & 5 AM. Estimated date of completion is September 3, 2015.

I-84 WB Exit 87 on- and off-ramps to / from US197 (The Dalles)

Effective September 8, 2015, the I-84 westbound Exit 87 on- and off-ramps to / from US197 will be intermittently closed between the hours of 10 PM & 5 AM. Estimated date of completion is November 24, 2015.

I-84 crossing under US197 Exit 87 EB & WB (The Dalles)

Effective September 8, 2015, this section of I-84 will be restricted to 16 feet 03 in. in height eastbound, and 16 feet 06 in. in height westbound. Estimated date of completion is November 24, 2015.

I-84 MP 95.80 to MP 110.46 EB & WB (east of The Dalles)

Effective May 1, 2015, this section of I-84 will be restricted to 11 feet 06 in. in width between the hours of 7 PM & 7 AM. Estimated date of completion is September 18, 2015.

I-84 MP 245.85 to MP 252.40 EB (west of La Grande)

Effective March 30, 2015, this section of I-84 eastbound will be restricted to 13 feet 00 in. in width, 80 feet 00 in. in trailer length (inclusive of tongue), and 120 feet 00 in. in overall length. Mobile homes with eaves are allowed, provided the base width does not exceed 13 feet 00 in. in width. Loads that do not exceed legal width (8 feet 06 in.) will be allowed up to 160 feet 00 in. in overall length, and the trailer length is not limited. Estimated date of completion is November 1, 2015.

I-84 MP 252.40 to MP 245.85 WB (west of La Grande)

Effective March 30, 2015, this section of I-84 westbound will be restricted to 15 feet 00 in. in width, 80 feet 00 in. in trailer length (inclusive of tongue), and 120 feet 00 in. in overall length. Mobile homes with eaves are allowed, provided the base width does not exceed 15 feet 00 in. in width. Loads that do not exceed legal width (8 feet 06 in.) will be allowed up to 160 feet 00 in. in overall length, and the trailer length is not limited. In addition, all overwidth loads (over 8 feet 06 in. in width) must stay in the right lane between MP 251.5-250 and MP 248-246; passing other vehicles through these areas is strictly prohibited. Estimated date of completion is November 1, 2015.

I-84 MP 271 to MP 270 WB (east of La Grande)

Effective May 11, 2015, this section of I-84 westbound will be restricted to 19 feet 00 in. in width. Estimated date of completion is October 31, 2015.

I-84 WB ramp from Ladd Creek Rd (east of La Grande)

Effective May 26, 2015, the ramp from Ladd Creek Rd to I-84 westbound will be closed. Estimated date of completion is October 31, 2015.

I-84 MP 270 to MP 271 EB (east of La Grande)

Effective May 11, 2015, this section of I-84 eastbound will be restricted to 16 feet 00 in. in width. Estimated date of completion is October 31, 2015.

I-84 MP 285.68 to MP 289.17 EB & WB (North Powder)

Effective June 9, 2015, this section of I-84 will be restricted to 20 feet 00 in. in width. Estimated date of completion is November 27, 2015.

I-84 MP 330 to MP 343 EB & WB (west of Ontario) -- NEW --

Effective April 27, 2015, this section of I-84 will be restricted to 12 feet 00 in. in width between the hours of 7 PM & 7 AM. This section of I-84 will be restricted to 16 feet 00 in. in width between the hours of 7 AM & 7 PM. Loads wider than 16 feet 00 in. in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permits Unit for information. In addition, the height will be restricted to 17 feet 10 in. in height eastbound, and 17 feet 03 in. in height westbound at all hours. Estimated date of completion is October 15, 2015.

I-84 MP 354 to MP 346 WB (west of Ontario)

Effective May 19, 2015, this section of I-84 westbound will be restricted to 12 feet 00 in. in width between the hours of 6 PM & 6 AM. In addition, this section of I-84 westbound will be restricted to 16 feet 00 in. in width between the hours of 6 AM & 6 PM. Loads wider than 16 feet 00 in. in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permits Unit for information. Estimated date of completion is October 1, 2015.

I-205 MP 3 to MP 21 NB & SB

Effective August 24, 2015, this section of I-205 will be restricted to 12 feet 00 in. in width per the following schedule: Sunday through Thursday nights between the hours of 10 PM & 5 AM; Friday nights between the hours of 11 PM & 7 AM; Saturday nights between the hours of 10 PM & 8 AM. Estimated date of completion is September 4, 2015.

I-205 MP 4.29 to MP 4.30 NB & SB (Crossing under Johnson Rd - Portland)

Effective August 24, 2015, I-205 northbound and southbound crossing under Johnson Rd will be restricted to 17 feet 11 in. in height per the following schedule: Sunday through Thursday nights between the hours of 10 PM & 5 AM, Friday nights between the hours of 11 PM & 7 AM, and Saturday nights between the hours of 10 PM & 8 AM. Estimated date of completion is September 4, 2015.

I-205 MP 8.69 SB (Crossing Under Broadway St - Portland)

Effective August 24, 2015, I-205 southbound crossing under Broadway St will be restricted to 16 feet 07 in. in height per the following schedule: Sunday through Thursday nights between the hours of 10 PM & 5 AM, Friday nights between the hours of 11 PM & 7 AM, and Saturday nights between the hours of 10 PM & 8 AM. Estimated date of completion is September 4, 2015.

I-205 NB on-ramp from OR43 SB (Lake Oswego)

Effective August 24, 2015, the ramp from OR43 southbound to I-205 northbound will be intermittently closed per the following schedule: Sunday through Thursday nights between the hours of 10 PM & 5 AM; Friday nights between the hours of 11 PM & 7 AM; Saturday nights between the hours of 10 PM & 8 AM. Estimated date of completion is September 4, 2015.

I-205 NB on-ramp from OR43 (Oregon City)

Effective September 20, 2015, the I-205 northbound on-ramp from OR43 will be closed between the hours of 4 AM & 11 AM. Estimated date of completion is September 20, 2015.

I-205 MP 12 to MP 14 NB & SB (Clackamas)

Effective April 7, 2014, this section of I-205 will be restricted to 12 feet 00 in. in width on Monday to Friday between the hours of 10 PM & 5 AM (NIGHTTIME). In addition, this section of I-205 will be restricted to 16 feet 11 in. in height on Monday to Friday between the hours of 8 PM & 5:30 AM. Estimated date of completion is October 31, 2015.

I-205 NB on-ramp from US26 / Powell Blvd (Portland)

Effective August 24, 2015, the ramp from US26 / Powell Blvd to I-205 northbound will be intermittently closed per the following schedule: Sunday through Thursday nights between the hours of 10 PM & 5 AM; Friday nights between the hours of 11 PM & 7 AM; Saturday nights between the hours of 10 PM & 8 AM. Estimated date of completion is September 4, 2015.

I-205 SB on-ramp from Washington St (Portland)

Effective August 24, 2015, the ramp from Washington St to I-205 southbound will be intermittently closed per the following schedule: Sunday through Thursday nights between the hours of 10 PM & 5 AM; Friday nights between the hours of 11 PM & 7 AM; Saturday nights between the hours of 10 PM & 8 AM. Estimated date of completion is September 4, 2015.

I-205 NB on-ramp from Glisan St (Portland) -- NEW --

Effective September 26, 2015, the I-205 northbound on-ramp from Glisan St will be closed between the hours of 9 PM & 10 AM. Estimated date of completion is September 27, 2015.

I-405 SB ramp to I-5 SB (Portland)

Effective June 7, 2015, the ramp from I-405 southbound to I-5 southbound will be intermittently closed between the hours of 10 PM & 8 AM. Estimated date of completion is October 2, 2015.

I-405 SB ramp to I-5 NB (Portland)

Effective June 19, 2015, the ramp from I-405 southbound to I-5 northbound will be intermittently closed between the hours of 10 PM & 5 AM. Estimated date of completion is September 20, 2015.

I-405 SB ramp from SW 5th Ave (Portland)

Effective June 19, 2015, the ramp from SW 5th Ave to I-405 southbound will be intermittently closed on Friday nights between the hours of 10 PM & 5 AM. Estimated date of completion is September 20, 2015.

I-405 SB on-ramp from Broadway St (Portland)

Effective September 20, 2015, the I-405 southbound on-ramp from Broadway St will be closed between the hours of 4 AM & 11 AM. Estimated date of completion is September 20, 2015.

U.S. Routes

US20 / US395 MP 131.44 to MP 131.92 EB & WB (Burns)

Effective September 12, 2015, this section of US20 / US395 will be closed between the hours of 9 AM & 11 AM for one day only.

US26 MP 47.20 to MP 57.45 EB & WB (Government Camp)

Beginning April 1, 2015, this section of US26 will be closed for approximately 30 minutes per the following schedule: In April, May, September, and October: 30-minute closures may occur Mon/Tues/Thurs nights between the hours of 5:30 PM & 6:30 PM. In June, July, and August: 30-minute closures may occur Mon/Tues/Thurs nights between 6:30 PM & 7:30 PM. In addition, there will also be intermittent traffic stops lasting up to 20 minutes at other times during construction work. No construction work will occur on holidays and Sundays. Effective April 6, 2015, this section of US26 will be restricted to 22 feet 00 in. in width at all hours. Estimated date of completion is October 31, 2015.

US26 MP 53.51 EB & WB (Government Camp)

Effective April 1, 2015, this section of US26 will be restricted to 17 feet 03 in. in height. Estimated date of completion is October 31, 2015.

US26 MP 61.06 EB & WB (Brookwood/Helvetia Rd Interchange - Hillsboro)

Effective May 14, 2014, this section of US26 will be intermittently closed Monday through Friday nights between the hours of 10 PM & 5 AM. All traffic can bypass the closure by taking Exit 61, then re-entering the highway. Estimated date of completion is October 31, 2015.

US30 Bypass MP 0 to MP 1.34 EB & WB (crossing the St John's Bridge - Portland)

Effective September 20, 2015, this section of US30 Bypass crossing the St John's Bridge will be restricted to 08 feet 06 in. in width (LEGAL WIDTH) between the hours of 5:30 AM & 1 PM for one day only for a race.

US30 (Historic Columbia River Highway) MP 0.03 EB & WB (crossing Sandy River Bridge - Troutdale)

Effective September 20, 2015, US30 crossing the Sandy River Bridge will be closed between the hours of 4 AM & 3 PM. Estimated date of completion is September 20, 2015.

US95 MP 2.16 to MP 29.92 NB & SB

Effective September 8, 2015, this section of US95 will be restricted to 14 feet 00 in. in width between the hours of 6 AM & 6 PM. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 in. in width. Loads over 14 feet 00 in. width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is October 15, 2015.

US97 MP 75.04 NB & SB (north of Madras) -- NEW --

Effective October 5, 2015, this section of US97 will be restricted to 14 feet 00 in. in width between the hours of 7 AM & 5 PM. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Loads wider than 14 feet 00 in. in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permits Unit for information. Estimated date of completion is October 8, 2015.

US101 Business MP 4.78 (Lewis & Clark River Bridge - Astoria)

Effective December 1, 2014, this section of US101 Business is closed. Estimated date of completion is September 8, 2015.

US101 MP 113.82 to MP 114.94 NB & SB (Lincoln City)

Effective September 19, 2015, this section of US101 will be restricted to 8 feet 06 in. in width (LEGAL WIDTH) between the hours of 8 AM & 1 PM for one day only.

US101 MP 191.5 to MP 188.5 NB (Florence) -- NEW --

Effective September 15, 2015, this section of US101 northbound will be restricted to 17 feet 00 in. in width. Estimated date of completion is November 20, 2015.

US101 MP 211.21 NB & SB (Reedsport)

Effective March 6, 2014, this section of US101 will be restricted to 16 feet 00 in. in width. Throughout the duration of the project, every 120 days there will be a 10-day period when no restrictions will be in place. Contact the Over-Dimension Permit Unit for specific dates. Estimated date of completion is September 30, 2015.

US101 MP 233.99 (McCullough Bridge - Coos Bay)

Effective October 15, 2013, this section of US101 will be restricted to 11 feet 00 in. in width between the hours of 9 PM & 5 AM. Estimated date of completion is November 1, 2018.

US199 MP 14.0 to MP 28.5 NB & SB (Cave Junction)

Effective April 22, 2015, this section of US199 will be restricted to 11 feet 00 in. in width between the hours of 7 PM & 7 AM. No restrictions will be in place from 3 PM Friday through 12:01 AM Monday. Estimated date of completion is September 3, 2015.

US395 MP 37.00 to MP 73.25 NB & SB (Christmas Valley)

Effective April 1, 2015, this section of US395 will be restricted to 12 feet 00 in. in width. Loads wider than 12 feet 00 in. in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permits Unit for information. Estimated date of completion is December 1, 2015.

OR Routes

OR8 MP 11.28 to MP 14.67 EB & WB (Hillsboro)

Effective June 11, 2015, this section of OR8 will be restricted to 14 feet 00 in. in width. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Estimated date of completion is September 25, 2015.

OR10 (Beaverton-Hillsdale Hwy) MP 1.41 to MP 1.51 EB & WB (Beaverton)

Effective March 16, 2015, this section of OR10 (Beaverton-Hillsdale Hwy) will be restricted to 9 feet 00 in. in width between the hours of 10 PM & 5 AM. Estimated date of completion is October 31, 2015.

OR34 MP 51.0 to MP 51.5 EB & WB (Alsea) -- NEW --

Effective March 15, 2015, this section of OR34 will be restricted to 16 feet 06 in. in width. Loads wider than 16 feet 06 in. in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permits Unit for information. Estimated date of completion is September 25, 2015.

OR42 MP 44.8 to MP 45.5 EB & WB (Remote)

Effective June 15, 2015, this section of OR42 will be restricted to 16 feet 00 in. in width. Estimated date of completion is September 30, 2015.

OR43 (Macadam Ave) NB ramp to I-5 NB (Portland)

Effective June 19, 2015, the ramp from OR43 (Macadam Ave) northbound to I-5 northbound will be intermittently closed between the hours of 10 PM & 5 AM. Estimated date of completion is September 20, 2015.

OR43 (Macadam Ave) NB ramp to I-5 NB (Portland) -- NEW --

Effective June 15, 2015, the ramp from OR43 (Macadam Ave) northbound to I-5 northbound will be intermittently closed between the hours of 10 PM & 8 AM. Estimated date of completion is October 15, 2015.

OR43 (Macadam Ave) MP 1.13 to MP 0.72 NB (Portland)

Effective September 13, 2015, this section of OR43 northbound will be restricted to 8 feet 06 in. in width (LEGAL WIDTH) between the hours of 6:45 AM & 10:30 AM for one day only.

OR43 MP 3.20 to MP 4.20 NB & SB (Lake Oswego)

Effective August 4, 2015, this section of OR43 will be restricted to 8 feet 06 in. in width (LEGAL WIDTH) between the hours of 8 PM & 5 AM Sunday through Thursday nights. Estimated date of completion is September 30, 2015.

OR43 MP 6.04 to MP 9.02 NB & SB (West Linn)

Effective October 15, 2014, this section of OR43 will be restricted to 14 feet 00 in. in width. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Estimated date of completion is June 30, 2016.

OR51 MP 6.29 to MP 6.34 NB & SB (Independence)

Effective September 12, 2015, this section of OR51 (Main St) in Independence will be closed between the hours of 9 AM & 11 AM for one morning only for a race.

OR58 MP 56.1 EB & WB (Salt Creek Tunnel - east of Oakridge)

Effective March 30, 2015, this section of OR58 will be restricted to 8 feet 06 in. in width (LEGAL WIDTH) and 15 feet 01 in. in height. Estimated date of completion is October 15, 2015.

OR62 WB ramp to I-5 SB (Medford)

Effective August 24, 2015, the ramp from OR62 westbound to I-5 southbound will be closed between the hours of 10 PM & 5 AM. Estimated date of completion is September 30, 2015.

OR99W (Denver Ave) MP -5.50 to MP -4.75 NB & SB (Portland)

Effective August 14, 2015, this section of OR99W (Denver Ave) will be intermittently closed between the hours of 9 PM & 5:30 AM. Estimated date of completion is 9/30/2015.

OR99W MP 10.26 to MP 10.70 NB & SB (Tigard)

Effective February 2, 2015, this section of OR99W will be restricted to 11 feet 00 in. in width between the hours of 8 PM & 6 AM. Estimated date of completion is October 2, 2015.

OR99W MP 12.15 to MP 12.25 SB (Tualatin River Bridge - King City)

Effective June 8, 2015, this section of OR99W southbound will be restricted to 13 feet 00 in. in width on Monday through Saturday between the hours of 6 AM & 2 PM. Estimated date of completion is September 30, 2015.

OR99W MP 13.95 to MP 14.04 SB (Tualatin)

Effective August 31, 2015, this section of OR99W southbound will be restricted to 20 feet 00 in. in width. Estimated date of completion is October 9, 2015.

OR99W MP 52.72 NB & SB (north of Rickreall)

Effective at 7 PM on September 11, 2015, this section of OR99W will be closed at all hours. The highway is estimated to re-open at 9 PM on September 13, 2015.

SB Garfield St to Westbound W 11th St (Eugene) -- NEW --

Effective September 14, 2015, traffic on southbound Garfield St to westbound W 11th St will be restricted to 8 feet 06 in. in width. Estimated date of completion is September 16, 2015.

OR130 (Little Nestucca Hwy) MP 4.50 to MP 5 EB & WB (crossing Bear Creek Bridge)

Effective at 7 AM on September 18, 2015, this section of OR130 (Little Nestucca Hwy) crossing the Bear Creek Bridge will be closed. The highway is estimated to re-open on September 21, 2015.

OR138 (Harvard Ave) MP -0.80 to MP 0.17 EB & WB (Roseburg)

Effective August 12, 2015, this section of OR138 (Harvard Ave) will be restricted to 13 feet 00 in. in width. Loads wider than 13 feet 00 in. in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permits Unit for information. Estimated date of completion is September 16, 2016.

OR140 MP 25 to MP 35 EB & WB (Bly Mountain)

Effective February 24, 2015, this section of OR140 will be restricted to 12 feet 00 in. in width. Estimated date of completion is December 31, 2016.

OR210 (Scholls Hwy) MP 9.02 to MP 9.21 EB & WB (Beaverton)

Effective March 16, 2015, this section of OR210 (Scholls Hwy) will be restricted to 9 feet 00 in. in width between the hours of 10 PM & 5 AM. Estimated date of completion is October 31, 2015.

OR214 EB & WB MP 36.24 to MP 37.87 (Woodburn)

Effective August 26, 2013, OR214 between Willow Ave (west of I-5) and Settlemeier Ave (east of I-5) will be restricted to 14 feet 00 in. in width. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Estimated date of completion is September 30, 2016.

OR217 SB Exit 4A ramp to Hall Blvd (Tigard)

Effective March 25, 2015, the ramp from OR217 southbound Exit 4A to Hall Blvd will be intermittently closed on Monday through Friday between the hours of 10 PM & 5 AM (NIGHTTIME). Estimated date of completion is October 31, 2015.

OR217 NB on-ramp from OR210 / Scholls Ferry Rd (Tigard)

Effective March 25, 2015, the ramp from OR210 / Scholls Ferry Rd to OR217 northbound intermittently closed on Monday through Friday between the hours of 10 PM & 5 AM (NIGHTTIME). Estimated date of completion is October 31, 2015.

OR217 SB on-ramp from Hall Blvd (Tigard)

Effective March 25, 2015, the ramp from Hall Blvd to OR217 southbound will be intermittently closed on Monday through Friday between the hours of 10 PM & 5 AM (NIGHTTIME). Estimated date of completion is October 31, 2015.

OR217 SB Exit 4B ramp to OR210 / Scholls Ferry Rd (Tigard)

Effective March 25, 2015, the ramp from OR217 southbound Exit 4B to OR210 / Scholls Ferry Rd will be intermittently closed on Monday through Friday between the hours of 10 PM & 5 AM (NIGHTTIME). Estimated date of completion is October 31, 2015.

OR217 NB Exit 4 ramp to OR210 / Scholls Ferry Rd (Tigard)

Effective March 25, 2015, the ramp from OR217 northbound Exit 4 to OR210 / Scholls Ferry Rd will be intermittently closed on Monday through Friday between the hours of 10 PM & 5 AM (NIGHTTIME). Estimated date of completion is October 31, 2015.

OR217 SB on-ramp from OR210 / Scholls Ferry Rd (Tigard)

Effective March 25, 2015, the ramp from OR210 / Scholls Ferry Rd to OR217 southbound will be intermittently closed on Monday through Friday between the hours of 10 PM & 5 AM (NIGHTTIME). Estimated date of completion is October 31, 2015.

OR219 MP 0.00 to MP 0.09 NB & SB (Hillsboro) -- NEW --

Effective August 3, 2015, this section of OR219 will be closed between the hours of 7 PM & 6 AM. Estimated date of completion is September 30, 2015.

OR219 MP 0.09 to MP 0.18 NB & SB (Hillsboro) -- NEW --

Effective August 10, 2015, this section of OR219 will be closed between the hours of 7 PM & 6 AM. Estimated date of completion is September 30, 2015.

82nd Dr crossing over I-205 Exit 13 (Clackamas)

Effective August 21, 2015, the 82nd Dr bridge crossing over I-205 Exit 13 will be closed. Estimated date of completion is September 20, 2015.

OR225 (McVay Hwy) MP 0.00 to MP 2.52 (Eugene/Springfield)

Effective June 15, 2015, this section of OR225 (McVay Hwy) will be closed. Estimated date of completion is September 30, 2015.

Lifted Restrictions

I-84 EB MP 44.1 (Cascade Locks)

Effective August 24, 2015, this section of I-84 eastbound will be restricted to 14 feet 00 in. in width between the hours of 8 AM & 3 PM. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Estimated date of completion is August 24, 2015.

I-84 WB MP 55.13 (Wyeth)

Effective August 25, 2015, this section of I-84 westbound will be restricted to 14 feet 00 in. in width between the hours of 8 AM & 3 PM. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Estimated date of completion is August 25, 2015.

I-205 SB on-ramp from US30 Bypass (Portland)

Effective June 8, 2015, the ramp from US30 Bypass to I-205 southbound will be intermittently closed between the hours of 9 PM & 5:30 AM. Estimated date of completion is August 30, 2015.

I-405 MP 1.04 to MP 1.92 NB (Portland)

Effective August 28, 2015, this section of I-405 northbound will be restricted to 13 feet 00 in. in width, and 17 feet 00 in. in height between the hours of 9 PM & 5 AM. Estimated date of completion is August 29, 2015.

US26 (Powell Blvd) MP 1.30 to MP 1.97 EB & WB (Portland)

Effective August 24, 2015, this section of US26 (Powell Blvd) will be restricted to 14 feet 00 in. in width. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. In addition, the height will be restricted to 15 feet 09 in. in height eastbound, and 16 feet 07 in. in height westbound. Estimated date of completion is August 29, 2015.

US26 MP 32.47 to MP 30.43 WB (Cherryville)

Effective August 28, 2015, this section of US26 will be restricted to 12 feet 00 in. in width between the hours of 8 AM & 11 PM for one day only.

US26 MP 49.0 to MP 52.2 EB & WB (Government Camp)

Effective August 6, 2015, motor carriers hauling loads wider than 12 feet 00 in. in width need to pull over and arrange to be escorted through the work zone between MP 49.0 and MP 52.2. Eastbound loads need to stop and call 971-236-6210 at the Brightwood Scales, MP 36.4; westbound loads need to stop and call the same number at the brake check area near Ski Bowl, MP 55.7. This restriction will be in place weekdays, Monday through Thursday, between 7 AM & 6 PM, and Friday between 7 AM & 3 PM. The estimated date of completion is September 3, 2015.

US30 MP 12.5 to MP 12.7 WB (south of Scappoose)

Effective August 28, 2015 at 8 PM, this section of US30 westbound will be restricted to 14 feet 00 in. in width. Estimated date of completion is August 29, 2015 at 1 AM.

OR51 MP 2.28 EB & WB (Independence)

Effective August 26, 2015, this section of OR51 will be closed. Estimated date of completion is September 2, 2015.

OR99E MP 11.19 NB & SB (south of Tangent)

Effective August 24, 2015, this section of OR99E will be restricted to the following weights between the hours of 9 AM & 4 PM: 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads. Estimated date of completion is August 27, 2015.

OR99E MP 20 to MP 22 NB & SB (Canby)

Effective December 1, 2014, this section of OR99E will be restricted to 10 feet 00 in. in width from 1/2 hr after sunset until 1/2 hr after sunrise (NIGHTTIME). Estimated date of completion is August 31, 2015.

OR99E MP 21.86 to MP 24.95 NB & SB (south of Canby)

Effective May 26, 2015, this section of OR99E will be restricted to 14 feet 00 in. in width between the hours of 8 AM & 8 PM. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. In addition, effective June 8, 2015, this section of OR99E will be restricted to 12 feet 00 in. in width between the hours of 8 PM & 8 AM. Estimated date of completion is August 28, 2015.

OR99E MP 24.67 NB & SB (Pudding River Bridge - Aurora)

Effective May 26, 2015, this section of OR99E will be restricted to 15 feet 03 in. in height in both directions of travel at all times. Estimated date of completion is August 28, 2015.

OR130 (Little Nestucca Hwy) MP 5 to MP 8 EB & WB

Effective August 28, 2015, this section of OR130 (Little Nestucca Hwy) will be closed between the hours of 7 AM & 7 PM. Estimated date of completion is August 30, 2015.

BRIDGE RESTRICTIONS

Interstate Routes

I-5 MP 104.85 Chadwick Ln crossing over I-5 (near Riddle)

Chadwick Ln crossing over I-5 is restricted to the following weights: 20,000 single axle, 34,000 lbs. tandem axle - 80,000 lbs. GVW. Weight Table 1.

I-5 MP 151.81 Wilson Rd crossing over I-5 (Yoncalla)

Wilson Rd crossing over I-5 is restricted to the following weights: 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.

I-84 MP 256.42 Upper Perry Interchange crossing over I-84 (Perry)

Upper Perry Interchange crossing over I-84 is restricted to the following weights: 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW, Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.

U.S. Routes

US20 (Corvallis-Newport Hwy) MP 23.38 (Yaquina River Bridge - Eddyville)

Effective May 19, 2006, the Yaquina River Bridge near Eddyville is restricted to the following weights: 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads. Vehicles exceeding these weights may cross the bridge if they straddle the centerline, do not exceed 25 MPH and are the only vehicle on the bridge. Certified flaggers are required to stop traffic.

US30 (Historic Columbia River Hwy) MP 0.03 (Sandy River Bridge - Troutdale)

US30 (Historic Columbia River Highway) crossing the Sandy River Bridge is restricted to 30 tons gross weight.

US30 (Huntington Hwy) MP 0.46 (Burnt River Bridge - Lime)

Effective June 16, 2011, the Burnt River Bridge near Lime just off I-84 is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.

US30 (Historic Columbia River Hwy) MP 13.14 (Shepperds Dell Bridge)

US30 (Historic Columbia River Hwy) crossing Youngs Creek (Shepperds Dell) Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, Weight Table 1.

US30 (Historic Columbia River Hwy) MP 17.68 (West Multnomah Falls Bridge)

US30 (Historic Columbia River Hwy) crossing West Multnomah Falls Bridge is restricted to 28,000 lbs. for solo vehicles, 44,000 lbs. for 3-2 combinations, and 56,000 lbs. for 3-3 combinations.

US30 (Historic Columbia River Hwy) MP 20.39 (Horsetail Creek Bridge)

US30 (Historic Columbia River Hwy) crossing Horsetail Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, Weight Table 1.

US30 MP 30.42 (Bridge of the Gods - Cascade Locks)

Effective December 24, 2013, the Bridge of the Gods at US30 MP 30.42 is restricted to 80,000 lbs. GVW, Weight Table 1. This bridge belongs to the Port of Cascade Locks.

US30 OR/WA Border at Rainier (Lewis & Clark Bridge)

The Columbia River (Lewis & Clark) Bridge between Rainier, OR and Longview, WA is restricted to 21,500 lbs. per axle, no gross weight restriction. Contact the State of Washington at (360) 704-6340 for current information regarding size restrictions for this bridge.

US101 Business MP 4.78 (Lewis & Clark River Bridge - Astoria)

US101 Business crossing Lewis & Clark River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 80,000 lbs. GVW, Weight Table 1.

US101 Business MP 6.89 (Old Youngs Bay Bridge - Astoria)

Effective November 10, 2009, US101 Business crossing the Old Youngs Bay Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW, Weight Table 2.

US101 MP 40.71 (Neahkahnie Mtn Chasm Bridge - near Manzanita)

Effective November 15, 2004, Neahkahnie Mtn Chasm Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2 for divisible loads.

US101 MP 141.67 (Yaquina Bay Bridge - Newport)

Effective March 1, 2013, the Yaquina Bay Bridge in Newport is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW, Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW, Weight Table 3 for non-divisible loads. Non-divisible loads exceeding these weights (up to Weight Table 5) may cross the bridge if they stop traffic/straddle the centerline and are the only vehicle on the bridge when crossing. Certified flaggers are required to stop both northbound and southbound traffic. The rolling stop method is not allowed.

US101 MP 190.98 (Siuslaw River Bridge - Florence)

Effective March 17, 2003, the Siuslaw River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW. Weight Table 3 for non-divisible loads.

OR Routes

OR18 MP 51.57 (Yamhill River Bridge - Dayton)

OR18 crossing Yamhill River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.

OR22 MP 10.49 (Louie Creek Bridge - Dolph)

OR22 crossing Louie Creek Bridge is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, Weight Table 3 only.

OR22 MP 10.66 (Louie Creek Bridge - Dolph)

OR22 crossing Louie Creek Bridge is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, Weight Table 3 only.

Santiam River Bridge - Mill City (not on OR22 mainline)

1st St crossing Santiam River Bridge in Mill City is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2. This restriction is NOT on the OR22 mainline.

OR27 MP 1.90 (Irrigation Ditch - Prineville)

OR27 crossing Irrigation Ditch at MP 1.90 is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle, Weight Table 4.

OR27 MP 2.88 (Irrigation Ditch - Prineville)

OR27 crossing Irrigation Ditch at MP 2.88 is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle, Weight Table 4.

OR27 MP 4.62 (Irrigation Ditch - Prineville)

OR27 crossing Irrigation Ditch at MP 4.62 is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle, Weight Table 4.

OR27 MP 27.23 (Bear Creek Bridge - south of Prineville)

OR27 crossing Bear Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs GVW, Weight Table 2.

Old OR34 EB MP 0.13 (Willamette River / Van Buren St Bridge - Corvallis)

Old OR34 eastbound crossing Willamette River (Van Buren St) Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 80,000 lbs. GVW., Weight Table 1.

OR35 crossing Columbia River (White Salmon) Bridge - Hood River

OR35 crossing the Columbia River (White Salmon) Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 80,000 lbs. GVW, Weight Table 1. Bridge belongs to Port of Hood River.

OR43 MP 11.43 (Willamette River Arch Bridge - Oregon City)

OR43 crossing the Willamette River Arch Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 80,000 lbs. GVW, Weight Table 1.

OR53 MP 5.98 (Jack Horner Creek Bridge)

OR53 crossing Jack Horner Creek Bridge is restricted to 20,000 lbs. single axle, 40,000 lbs tandem axle, Weight Table 3.

OR99W MP 12.20 SB (Tualatin River Bridge - King City)

OR99W southbound crossing Tualatin River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.

OR99 MP 19.09 SB (Ashland Creek Bridge - Ashland)

Effective June 12, 2015, OR99 southbound crossing Ashland Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.

OR104 Spur MP 4.62 (Skipanon River Bridge - Warrenton)

Effective April 4, 2011, OR104 Spur crossing the Skipanon River Bridge is restricted to 38,000 lbs. for solo trucks, 56,000 lbs. for 3-2 axle truck combinations, 64,000 lbs. for 3-3 axle (or more) truck combinations.

OR120 (Swift Hwy / Portland Rd) MP 0.38 (Columbia Slough Bridge - Portland)

OR120 (Swift Hwy / Portland Rd) crossing Columbia Slough Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.

OR126 Business MP 1.34 WB (Willamette River / Main St Bridge - Springfield)

OR126 Business westbound crossing Willamette River / Main St Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.

OR130 (Little Nestucca Hwy) MP 3.23 (Panther Creek Bridge)

OR130 (Little Nestucca Hwy) crossing Panther Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.

OR130 (Little Nestucca Hwy) MP 3.60 (Squaw Creek Bridge)

OR130 (Little Nestucca Hwy) crossing Squaw Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.

OR130 (Little Nestucca Hwy) MP 3.82 (Austin Creek Bridge)

OR130 (Little Nestucca Hwy) crossing Austin Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.

OR130 (Little Nestucca Hwy) MP 4.15 (Little Nestucca River Bridge)

OR130 (Little Nestucca Hwy) crossing Little Nestucca River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.

OR130 (Little Nestucca Hwy) MP 4.76 (Bear Creek Bridge)

OR130 (Little Nestucca Hwy) crossing Bear Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.

OR164 (Jefferson Hwy) MP 6.24 (Santiam River Bridge - Jefferson)

OR164 crossing the Santiam River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW. Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.

OR219 MP 23.46 (Willamette River Bridge - south of Newberg)

OR219 crossing Willamette River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle. 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.

OR234 MP 0.04 (Rogue River Bridge - west of Gold Hill)

OR234 crossing Rogue River Bridge west of Gold Hill is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW, Weight Table 2 for divisible Loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW, Weight Table 3 for non-divisible loads.

OR241 MP 0.51 (Isthmus Slough)

MP 0.51 Isthmus Slough (1/2 mile from US101) is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 80,000 lbs. GVW., Weight Table 1

OR339 (Freewater Hwy) MP 2.76 (West Crockett Branch Bridge - Milton-Freewater)

OR339 (Freewater Hwy) crossing West Crockett Branch Bridge is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle, Weight Table 4.

OR339 (Freewater Hwy) MP 3.16 (East Fork Little Walla Walla River Bridge - Milton-Freewater)

OR339 (Freewater Hwy) crossing East Fork Little Walla Walla River Bridge is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle, Weight Table 4.

OR339 (Freewater Hwy) MP 3.31 (West Fork Little Walla Walla River Bridge - Milton-Freewater)

OR339 (Freewater Hwy) crossing West Fork Little Walla Walla River Bridge is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle, Weight Table 4.

Other Jurisdictions

Old OR99 (DC388) Old Winchester Bridge (Roseburg)

Old Winchester Bridge on DC388 (Old 99) at MP12.21 is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW.- Weight Table 2 Divisible Loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW.- Weight Table 3 Non- Divisible Loads.

Request email notification when restrictions change.