Road Restrictions 8/26/2016

Print Road & Bridge Restrictions     Print Road Restrictions Only

ROAD RESTRICTIONS

Interstate Routes

I-5 MP 10.0 to MP 13.5 NB (Ashland)

Effective April 19, 2016, this section of I-5 northbound will be restricted to 20 feet 00 in. in width. Loads wider than 20 feet 00 in. in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is September 1, 2016.

I-5 NB MP 11.93 (crossing under railroad bridge - Ashland)

Effective April 19, 2016, I-5 northbound crossing under the railroad bridge at MP 11.93 will be restricted to 16 feet 04 in. in height. Estimated date of completion is September 1, 2016.

I-5 MP 17.40 to MP 27.71 NB & SB (Ashland to Medford)

Effective August 7, 2016, this section of I-5 will be restricted to 16 feet 00 in. in width Sunday through Thursday nights between the hours of 7 PM & 7 AM. Estimated date of completion is September 2, 2016.

I-5 MP 17.40 to MP 27.71 NB & SB (Ashland to Medford)

Effective August 7, 2016, this section of I-5 will be restricted to 17 feet 04 in. in height northbound, and 16 feet 04 in. in height southbound Sunday through Thursday nights between the hours of 7 PM & 7 AM. Estimated date of completion is September 2, 2016.

I-5 NB & SB Exit 19 ramps to/from S Valley View Rd (north of Ashland)

Effective August 7, 2016, the I-5 northbound and southbound Exit 19 ramps to/from S Valley View Rd will be intermittently closed Sunday through Thursday nights between the hours of 7 PM & 7 AM. Estimated date of completion is September 2, 2016.

I-5 NB & SB Exit 21 ramps to/from W Valley View Rd (Talent)

Effective August 7, 2016, the I-5 northbound and southbound Exit 21 ramps to/from W Valley View Rd will be intermittently closed Sunday through Thursday nights between the hours of 7 PM & 7 AM. Estimated date of completion is September 2, 2016.

I-5 SB ramps to/from the Suncrest Rest Area (Talent)

Effective August 7, 2016, the I-5 southbound ramps to/from the Suncrest Rest Area will be intermittently closed Sunday through Thursday nights between the hours of 7 PM & 7 AM. Estimated date of completion is September 2, 2016.

I-5 NB on-ramp from E Pine St (Central Point)

Effective September 11, 2016, the ramp from E Pine St to I-5 northbound will be closed between the hours of 7 PM & 6 AM. Estimated date of completion is September 12, 2016.

I-5 NB Exit 35 ramp to Blackwell Rd/OR99 (Central Point)

Effective September 11, 2016, the ramp from I-5 northbound Exit 35 to Blackwell Rd/OR99 will be closed between the hours of 7 PM & 7 AM. Estimated date of completion is September 12, 2016.

I-5 MP 128.92 NB & SB (N Umpqua River Bridge - Roseburg)

Effective May 17, 2016, this section of I-5 will be restricted to 12 feet 06 in. in width from 1/2 hr after sunset to 1/2 hr before sunrise. Estimated date of completion is August 31, 2016.

I-5 MP 154 to MP 163 NB & SB (Anlauf)

Effective January 4, 2016, this section of I-5 will be restricted to 16 feet 00 in. in width. Loads wider than 16 feet 00 in. in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Beginning May 20, 2016 through September 5, 2016 and November 23, 2016 through January 3, 2017 there will be no restrictions per the following schedule: Monday through Thursday between the hours of 10:00am and 5:00 pm; and no restrictions on the weekends from 10 am Friday through 8 pm Sunday. Estimated date of completion is November 22, 2017.

I-5 SB Exit 154 off-ramp to Scotts Valley / Elkhead Rd (south of Anlauf)

Effective September 5, 2016, the I-5 southbound Exit 154 off-ramp to Scotts Valley / Elkhead Rd will be intermittently closed. Estimated date of completion is November 23, 2016.

I-5 MP 155 NB & SB (south of Anlauf)

Effective September 9, 2016, this section of I-5 will be restricted to 14 feet 00 in. in width. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Estimated date of completion is November 23, 2016.

I-5 MP 156.65 NB & SB (crossing under Cox Rd - Anlauf)

Effective January 4, 2016, this section of I-5 will be restricted to 16 feet 07 in. in height. Beginning May 20, 2016 through September 5, 2016 and November 23, 2016 through January 3, 2017 there will be no restrictions per the following schedule: Monday through Thursday between the hours of 10:00am and 5:00 pm; and no restrictions on the weekends from 10 am Friday through 8 pm Sunday. Estimated date of completion is November 22, 2017.

I-5 SB Exit 159 on/off ramps to/from Elk Creek / Cox Rd (Anlauf)

Effective September 5, 2016, the I-5 southbound Exit 159 on/off ramps to/from Elk Creek / Cox Road will be intermittently closed. Estimated date of completion is November 23, 2016.

I-5 MP 161.0 to MP 162.3 NB & SB (Anlauf)

Effective July 6, 2016, all loads over 12 ft wide traveling on I-5 between MP 161-162.3 through the construction zone, must travel with a rear pilot vehicle. The rear pilot vehicle shall prevent traffic from passing the overwidth load at all times. Motor carriers not operating with a rear pilot vehicle on this section of I-5 will be provided free pilot vehicle escort service; vehicles traveling northbound must pull over and stage at MP 155.7, vehicles traveling southbound must pull over and stage at MP 166.3, then call 541-405-6934 and wait for pilot vehicle escort. Motor carriers already operating with a rear pilot vehicle do not need to pull over at the signed staging locations and wait for pilot vehicle escort. Convoying of loads may be allowed on a case-by-case basis for loads that are escorted by ODOT provided pilot vehicles. All trucks traveling on I-5 between MP 161-162.3 must stay in the right lane - passing other vehicles is prohibited. Estimated date of completion is September 15, 2016.

I-5 MP 161.0 to MP 162.3 NB & SB (Anlauf) -- NEW --

Effective September 16, 2016, all loads over 12 feet 00 in. in width must travel with a rear pilot vehicle through this section of I-5. Motor carriers will be responsible to provide for their own pilot vehicle, as ODOT will no longer be providing this service. Estimated date of completion is November 23, 2016.

I-5 SB on-ramp from OR38/OR99 EB (Drain)

Effective March 1, 2016, the ramp from OR38/OR99 eastbound to I-5 southbound will be closed. Estimated date of completion is September 30, 2016.

I-5 NB Exit 176 ramp to Saginaw (south of Creswell)

Effective September 11, 2016, the ramp from I-5 northbound Exit 176 to Saginaw will be closed between the hours of 8 PM & 5 AM. Estimated date of completion is September 13, 2016.

I-5 SB on-ramp from OR99 (south of Eugene) -- NEW --

Effective September 13, 2016, the ramp from OR99 to I-5 southbound will be closed between the hours of 8 PM & 5 AM. Estimated date of completion is September 15, 2016.

I-5 NB Exit 188A to OR58 EB (south of Eugene) -- NEW --

Effective September 11, 2016, the ramp from I-5 northbound Exit 188A to OR58 eastbound will be closed between the hours of 8 PM & 5 AM. Estimated date of completion is September 12, 2016.

I-5 NB Exit 188B to OR99 (south of Eugene) -- NEW --

Effective September 12, 2016, the ramp from I-5 northbound Exit 188B to OR99 will be closed between the hours of 8 PM & 5 AM. Estimated date of completion is September 13, 2016.

I-5 NB Exit 253 ramp to OR22 (Salem) -- NEW --

Effective September 22, 2016, the ramp from I-5 northbound Exit 253 to OR22 will be intermittently closed between the hours of 9 PM & 5 AM. Estimated date of completion is September 26, 2016.

I-5 SB on-ramp from OR22 WB (Salem) -- NEW --

Effective September 21, 2016, the ramp from OR22 westbound to I-5 southbound will be intermittently closed between the hours of 9 PM & 5 AM. Estimated date of completion is September 23, 2016.

I-5 NB on-ramp from OR22 WB (Salem) -- NEW --

Effective September 22, 2016, the ramp from OR22 westbound to I-5 northbound will be intermittently closed between the hours of 9 PM & 5 AM. Estimated date of completion is September 26, 2016.

I-5 SB Exit 253 ramp to OR22 (Salem) -- NEW --

Effective September 21, 2016, the ramp from I-5 southbound Exit 253 to OR22 will be intermittently closed between the hours of 9 PM & 5 AM. Estimated date of completion is September 23, 2016.

I-5 SB on-ramp from Chemawa Rd (Salem)

Effective September 1, 2016, the ramp from Chemawa Rd to I-5 southbound will be restricted to 12 feet 00 in. in width on Monday to Friday between the hours of 9 PM & 5 AM. Estimated date of completion is October 7, 2016.

I-5 SB on-ramp from Brooklake Rd (Brooks) -- NEW --

Effective September 20, 2016, the ramp from Brooklake Rd to I-5 southbound will be closed between the hours of 9 PM & 5 AM. Estimated date of completion is September 21, 2016.

I-5 SB Exit 278 off-ramp to Ehlen Rd (Aurora)

Effective September 19, 2016, the I-5 southbound Exit 278 off-ramp to Ehlen Road will be closed between the hours of 9 PM & 5 AM. Estimated date of completion is September 20, 2016.

I-5 NB Exit 292A ramp to OR217 NB (Tigard)

Effective July 30, 2016, the ramp from I-5 northbound Exit 292A to OR217 northbound will be intermittently closed per the following schedule: Saturday night at 9 PM through Monday morning at 5 AM. Estimated date of completion is September 5, 2016.

I-5 MP 294 to MP 301 NB & SB (Portland)

Effective August 19, 2016, this section of I-5 will be restricted to 12 feet 00 in. in width between the hours of 9 PM & 9 AM. Estimated date of completion is September 19, 2016.

I-5 MP 294 to MP 301 NB & SB (Portland)

Effective August 19, 2016, this section of I-5 will be restricted to 14 feet 10 in. in height northbound, and 15 feet 00 in. in height southbound, between the hours of 9 PM & 9 AM. Estimated date of completion is September 19, 2016.

I-5 SB on-ramp from Capitol Hwy (Portland)

Effective August 19, 2016, the ramp from Capitol Hwy to I-5 southbound will be intermittently closed per the following schedule: Sunday to Thursday nights between the hours of 9 PM & 5:30 AM, Friday nights between the hours of 9 PM & 8 AM, and Saturday nights between the hours of 9 PM & 9 AM. Estimated date of completion is September 19, 2016.

I-5 NB on-ramp from Capitol Hwy (Portland)

Effective August 19, 2016, the ramp from Capitol Hwy to I-5 northbound will be intermittently closed per the following schedule: Sunday to Thursday nights between the hours of 9 PM & 5:30 AM, Friday nights between the hours of 9 PM & 8 AM, and Saturday nights between the hours of 9 PM & 9 AM. Estimated date of completion is September 19, 2016.

I-5 NB Exit 295 ramp to Taylors Ferry Rd (Portland)

Effective August 22, 2016, the ramp from I-5 northbound Exit 295 to Taylors Ferry Rd will be intermittently closed between the hours of 8 PM & 6 AM. Estimated date of completion is August 30, 2016.

I-5 SB Exit 296A ramp to Barbur Blvd/OR99W (Portland)

Effective August 19, 2016, the ramp from I-5 southbound Exit 296A to Barbur Blvd (OR99W) will be intermittently closed per the following schedule: Sunday to Thursday nights between the hours of 8 PM & 5:30 AM, Friday nights between the hours of 8 PM & 8 AM, and Saturday nights between the hours of 8 PM & 9 AM. Estimated date of completion is September 19, 2016.

I-5 NB on-ramp from Spring Garden Rd (Portland)

Effective August 19, 2016, the ramp from Spring Garden Rd to I-5 northbound will be intermittently closed per the following schedule: Sunday to Thursday nights between the hours of 8 PM & 5:30 AM, Friday nights between the hours of 8 PM & 8 AM, and Saturday nights between the hours of 8 PM & 9 AM. Estimated date of completion is September 19, 2016.

I-5 SB Exit 296B ramp to Multnomah Blvd (Portland)

Effective August 19, 2016, the ramp from I-5 southbound Exit 296B to Multnomah Blvd will be intermittently closed per the following schedule: Sunday to Thursday nights between the hours of 8 PM & 5:30 AM, Friday nights between the hours of 8 PM & 8 AM, and Saturday nights between the hours of 8 PM & 9 AM. Estimated date of completion is September 19, 2016.

I-5 NB on-ramp from Multnomah Blvd (Portland)

Effective August 19, 2016, the ramp from Multnomah Blvd to I-5 northbound will be intermittently closed per the following schedule: Sunday to Thursday nights between the hours of 9 PM & 5:30 AM, Friday nights between the hours of 9 PM & 8 AM, and Saturday nights between the hours of 9 PM & 9 AM. Estimated date of completion is September 19, 2016.

I-5 NB on-ramp from Terwilliger Blvd (Portland)

Effective August 19, 2016, the ramp from Terwilliger Blvd to I-5 northbound will be intermittently closed per the following schedule: Sunday to Thursday nights between the hours of 9 PM & 5:30 AM, Friday nights between the hours of 9 PM & 8 AM, and Saturday nights between the hours of 9 PM & 9 AM. Estimated date of completion is September 19, 2016.

I-5 NB Exit 299A ramp to OR43 (Macadam Ave) - Portland

Effective August 14, 2016, the ramp from I-5 northbound Exit 299A to OR43 (Macadam Ave) will be closed. Estimated date of completion is August 29, 2016.

I-5 NB Exit 299A ramp to OR43/Macadam Ave (Portland)

Effective August 19, 2016, the ramp from I-5 northbound Exit 299A to Macadam Ave (OR43) will be intermittently closed per the following schedule: Sunday to Thursday nights between the hours of 9 PM & 5:30 AM, Friday nights between the hours of 9 PM & 8 AM, and Saturday nights between the hours of 9 PM & 9 AM. Estimated date of completion is September 19, 2016.

I-5 SB on-ramp from OR43/Hood Ave (Portland)

Effective August 19, 2016, the ramp from Hood Ave (OR43) to I-5 southbound will be intermittently closed per the following schedule: Sunday to Thursday nights between the hours of 9 PM & 5:30 AM, Friday nights between the hours of 9 PM & 8 AM, and Saturday nights between the hours of 9 PM & 9 AM. Estimated date of completion is September 19, 2016.

I-5 NB Exit 299B to I-405 NB (Portland)

Effective August 19, 2016, the ramp from I-5 northbound Exit 299B to I-405 northbound will be intermittently closed on Friday and Saturday nights between the hours of 10 PM & 9 AM. In addition, the ramp from I-5 northbound to Harbor Dr northbound will be closed during the same time. Estimated date of completion is September 19, 2016.

I-5 SB on-ramp from Harbor Dr (Portland)

Effective August 19, 2016, the ramp from Harbor Dr to I-5 northbound will be intermittently closed per the following schedule: Sunday to Thursday nights between the hours of 10 PM & 5 AM, Friday nights between the hours of 10 PM & 7 AM, and Saturday nights between the hours of 11 PM & 8 AM. Estimated date of completion is September 19, 2016.

I-5 SB Exit 300B ramp to Morrison Bridge / City Center (Portland)

Effective August 28, 2016, the ramp from I-5 southbound Exit 300B to Morrison Bridge / City Center will be closed between the hours of 6 AM & 7 PM. Estimated date of completion is August 28, 2016.

I-5 SB Exit 301 ramp to I-84 EB (Portland)

Effective September 16, 2016, the ramp from I-5 southbound Exit 301 to I-84 eastbound will be closed between the hours of 10 PM & 5 AM. Estimated date of completion is September 17, 2016.

I-5 SB Exit 302A to Moda Center (Portland)

Effective March 25, 2015, the ramp from I-5 southbound Exit 302A ramp to Moda Center will be restricted to 14 feet 00 in. in width on Sunday to Thursday nights between the hours of 8 PM & 5:30 AM, and on Friday nights between the hours of 8 PM & 8 AM. Estimated date of completion is August 31, 2016.

I-5 SB Exit 306 ramp to Interstate Ave (OR99W) - Portland

Effective September 6, 2016, the ramp from I-5 southbound Exit 306 to Interstate Ave (OR99W) will be intermittently closed between the hours of 7:30 PM & 5 AM. Estimated date of completion is September 30, 2016.

I-5 SB MP 308.38 SB (Interstate Bridge - Portland) -- NEW --

Effective September 15, 2016, this section of I-5 southbound will be closed between the hours of 10 PM & 5 AM. Effective September 16, 2016, this section of I-5 southbound will be closed between the hours of 10 PM & 8 AM. Estimated date of completion is September 17, 2016.

I-5 SB MP 308.38 NB (Interstate Bridge - Portland) -- NEW --

Effective September 14, 2016, this section of I-5 northbound will be closed between the hours of 11 PM & 6 AM. Estimated date of completion is September 15, 2016.

I-84 WB ramp to I-5 NB (Portland)

Effective September 9, 2016, the I-84 westbound ramp to I-5 northbound will be closed between the hours of 10 PM & 5 AM. Estimated date of completion is September 10, 2016.

I-84 WB ramp to I-5 SB (Portland)

Effective September 10, 2016, the I-84 westbound ramp to I-5 southbound will be closed between the hours of 10 PM & 5 AM. Estimated date of completion is September 11, 2016.

I-84 EB Exit 17 ramp to Troutdale

Effective February 15, 2016, the ramp from I-84 eastbound Exit 17 to Troutdale will be intermittently closed per the following schedule: Sunday to Thursday between the hours of 10 PM & 5:30 AM; Friday between the hours of 10 PM & 7 AM; Saturday between the hours of 10 PM & 8 AM. Estimated date of completion is August 31, 2016.

I-84 WB Exit 17 on-ramp from Troutdale

Effective February 15, 2016, the ramp from Troutdale to I-84 westbound at Exit 17 will be intermittently closed per the following schedule: Sunday to Thursday between the hours of 10 PM & 5:30 AM; Friday between the hours of 10 PM & 7 AM; Saturday between the hours of 10 PM & 8 AM. Estimated date of completion is August 31, 2016.

I-84 MP 17 to MP 32 EB & WB (Troutdale to Multnomah Falls)

Effective June 15, 2016, this section of I-84 will be restricted to 12 feet 00 in. in width per the following schedule: eastbound, between the hours of 7 PM & 7 AM; westbound, between the hours of 8 PM & 8 AM. Estimated date of completion is August 31, 2016.

I-84 EB & WB Exit 18 ramps to/from Jordan Rd (east of Troutdale)

Effective June 8, 2016, the I-84 eastbound and westbound Exit 18 ramps to/from Jordan Rd will be intermittently closed between the hours of 9 PM & 6 AM. Estimated date of completion is August 31, 2016.

I-84 EB Exit 22 to Corbett (east of Troutdale)

Effective June 14, 2016, the ramp from I-84 eastbound Exit 22 to Corbett will be intermittently closed between the hours of 9 PM & 6 AM. Estimated date of completion is August 31, 2016.

I-84 MP 22.1 WB (crossing under Corbett Rd Exit 22)

Effective June 7, 2016, I-84 westbound crossing under Corbett Rd Exit 22 will be restricted to 15 feet 06 in. in height between the hours of 8 PM & 8 AM. Estimated date of completion is August 31, 2016.

I-84 WB Exit 22 to Corbett (east of Troutdale)

Effective June 15, 2016, the ramp from I-84 westbound Exit 22 to Corbett will be intermittently closed between the hours of 9 PM & 6 AM. Estimated date of completion is August 31, 2016.

I-84 EB Exit 25 to Rooster Rock State Park (east of Troutdale)

Effective June 14, 2016, the ramp from I-84 eastbound Exit 25 to Rooster Rock State Park will be intermittently closed between the hours of 9 PM & 6 AM. Estimated date of completion is August 31, 2016.

I-84 MP 24.99 EB (crossing under Rooster Rock Exit 25)

Effective June 7, 2016, I-84 eastbound crossing under Rooster Rock Exit 25 will be restricted to 16 feet 07 in. in height between the hours of 7 PM & 7 AM. Estimated date of completion is August 31, 2016.

I-84 WB Exit 25 to Rooster Rock State Park (east of Troutdale)

Effective June 15, 2016, the ramp from I-84 westbound Exit 25 to Rooster Rock State Park will be intermittently closed between the hours of 9 PM & 6 AM. Estimated date of completion is August 31, 2016.

I-84 EB Exit 28 to Historic Columbia River Hwy/Bridal Veil (east of Troutdale)

Effective June 14, 2016, the ramp from I-84 eastbound Exit 28 to Historic Columbia River Hwy/Bridal Veil will be intermittently closed between the hours of 9 PM & 6 AM. Estimated date of completion is August 31, 2016.

I-84 WB Exit 29 to Dalton Point (east of Troutdale)

Effective June 15, 2016, the ramp from I-84 westbound Exit 29 to Dalton Point will be intermittently closed between the hours of 9 PM & 6 AM. Estimated date of completion is August 31, 2016.

I-84 EB Exit 30 to Benson State Rec Area (east of Troutdale)

Effective June 14, 2016, the ramp from I-84 eastbound Exit 30 to Benson State Rec Area will be intermittently closed between the hours of 9 PM & 6 AM. Estimated date of completion is August 31, 2016.

I-84 MP 44.1 EB (Cascade Locks Scale)

Effective August 30, 2016 at 10 AM, this section of I-84 eastbound will be restricted to 15 feet 00 in. in width. Estimated date of completion is August 30, 2016.

I-84 MP 45.60 to MP 64.50 EB & WB (Cascade Locks-Hood River)

Effective July 26, 2015, this section of I-84 will be restricted to 19 feet 00 in. in width from Midnight Sunday night to 12 Noon on Fridays. Estimated date of completion is November 30, 2016.

I-84 MP 45.60 to MP 64.50 EB & WB (Cascade Locks-Hood River)

Effective May 1, 2016, this section of I-84 will be restricted to 11 feet 00 in. in width between the hours of 8 PM & 8 AM. Estimated date of completion is October 21, 2016.

I-84 MP 55.13 WB (Wyeth Scale)

Effective August 31, 2016 at 9 AM, this section of I-84 westbound will be restricted to 15 feet 00 in. in width. Estimated date of completion is August 31, 2016.

I-84 MP 60 to MP 62 EB (Hood River) -- NEW --

Effective September 6, 2016, this section of I-84 eastbound will be restricted to 19 feet 00 in. in width. Estimated date of completion is November 22, 2016.

I-84 MP 62.05 WB (Crossing Under Exit 62/US30 - Hood River)

Effective July 26, 2015, I-84 westbound crossing under Exit 62 (US30) will be restricted to 15 feet 05 in. in height. Estimated date of completion is November 30, 2016.

I-84 MP 63 to MP 65 EB & WB (Hood River) -- NEW --

Effective September 7, 2016, this section of I-84 will be restricted to 14 feet 00 in. in width. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Loads wider than 14 feet 00 in. in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is September 8, 2016.

I-84 MP 63 to MP 65 EB (Hood River) -- NEW --

Effective September 7, 2016, this section of I-84 eastbound will be restricted to 16 feet 05 in. in height. Estimated date of completion is September 8, 2016.

I-84 MP 63.92 WB (Crossing Under Exit 63/2nd St - Hood River)

Effective July 26, 2015, I-84 westbound crossing under Exit 63 (2nd St) will be restricted to 15 feet 09 in. in height. Estimated date of completion is November 30, 2016.

I-84 MP 70.42 to MP 84.31 EB & WB (west of The Dalles)

Effective September 6, 2016, this section of I-84 will be restricted to 12 feet 00 in. in width on Sunday to Thursday nights between the hours of 7 PM & 7 AM. No restrictions will be in place from 11 AM Friday to 7 PM Sunday. Estimated date of completion is October 21, 2016.

I-84 MP 75.50 to MP 84.31 EB & WB (west of The Dalles)

Effective September 6, 2016, this section of I-84 will be restricted to 16 feet 00 in. in width. No restrictions will be in place from 11 AM Friday to 7 PM Sunday. Estimated date of completion is October 21, 2016.

I-84 EB & WB Exit 76 ramps to/from Rowena (west of The Dalles)

Effective September 6, 2016, the I-84 eastbound and westbound Exit 76 on- and off-ramps to/from Rowena will be intermittently closed between the hours of 10 PM & 5 AM. Estimated date of completion is October 21, 2016.

I-84 EB & WB Exit 82 ramps to/from Columbia Gorge Discovery Center (The Dalles)

Effective September 6, 2016, the I-84 eastbound and westbound Exit 82 on- and off-ramps to/from Columbia Gorge Discovery Center will be intermittently closed between the hours of 10 PM & 5 AM. Estimated date of completion is October 21, 2016.

I-84 crossing under River Rd Exit 82 (The Dalles)

Effective April 4, 2016, this section of I-84 will be restricted to 16 feet 10 in. in height eastbound, and 19 feet 09 in. in height westbound. No restrictions will be in place from 11 AM Friday to 7 PM Sunday. Estimated date of completion is October 21, 2016.

I-84 EB & WB Exit 83 ramps to/from W 6th St (The Dalles)

Effective September 6, 2016, the I-84 eastbound and westbound Exit 83 on- and off-ramps to/from W 6th St will be intermittently closed between the hours of 10 PM & 5 AM. Estimated date of completion is October 21, 2016.

I-84 EB & WB Exit 84 off-ramps to City Center (The Dalles)

Effective September 6, 2016, the I-84 eastbound and westbound Exit 84 off-ramps to The Dalles City Center will be intermittently closed between the hours of 10 PM & 5 AM. Estimated date of completion is October 21, 2016.

I-84 MP 83.96 to MP 88.04 EB (The Dalles) -- NEW --

Effective September 18, 2016, this section of I-84 eastbound will be restricted to 16 feet 00 in. in width. Mobile homes with eaves are allowed, provided the base width does not exceed 16 feet 00 in. in width. No restrictions will be in place from 11 AM Friday to 7 PM Sunday. Estimated date of completion is September 30, 2016.

I-84 MP 202.0 to MP 190.5 WB (west of Pendleton)

Effective July 27, 2016, this section of I-84 westbound will be restricted to 12 feet 00 in. in width between the hours of 6 PM & 6 AM. Estimated date of completion is August 31, 2016.

I-84 MP 203.65 to MP 217.75 EB & WB (Pendleton) -- NEW --

Effective August 10, 2016, this section of I-84 will be restricted to 13 feet 00 in. in width between the hours of 6 PM & 6 AM. Estimated date of completion is September 30, 2016.

I-84 MP 203.65 to MP 217.75 EB & WB (Pendleton) -- NEW --

Effective August 10, 2016, this section of I-84 will be restricted to 17 feet 08 in. in height eastbound, and 17 feet 09 in. in height westbound, between the hours of 6 PM & 6 AM. Estimated date of completion is September 30, 2016.

I-84 EB & WB Exit 207 on- and off-ramps to/from US30 (Pendleton) -- NEW --

Effective August 10, 2016, the I-84 eastbound and westbound Exit 207 on- and off-ramps to/from US30 will be intermittently closed between the hours of 10 PM & 4 AM. Estimated date of completion is September 30, 2016.

I-84 EB & WB Exit 209 on- and off-ramps to/from US395 (Pendleton) -- NEW --

Effective August 10, 2016, the I-84 eastbound and westbound Exit 209 on- and off-ramps to/from US395 will be intermittently closed between the hours of 10 PM & 4 AM. Estimated date of completion is September 30, 2016.

I-84 EB & WB Exit 210 on- and off-ramps to/from OR11 (Pendleton) -- NEW --

Effective August 10, 2016, the I-84 eastbound and westbound Exit 210 on- and off-ramps to/from OR11 will be intermittently closed between the hours of 10 PM & 4 AM. Estimated date of completion is September 30, 2016.

I-84 WB Exit 216 off-ramp to OR331 (east of Pendleton) -- NEW --

Effective August 10, 2016, the I-84 westbound Exit 216 off-ramp to OR331 will be intermittently closed between the hours of 10 PM & 4 AM. Estimated date of completion is September 30, 2016.

I-84 MP 277.1 to MP 307.1 EB & WB (Ladd Canyon-Baker City) -- NEW --

Effective August 22, 2016, this section of I-84 will be restricted to 16 feet 00 in. in width. Mobile homes with eaves are allowed, provided the base width does not exceed 16 feet 00 in. in width. Loads wider than 16 feet 00 in. in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is September 16, 2016.

I-84 EB crossing under Clover Creek Exit 278 (east of La Grande)

Effective May 9, 2016, I-84 eastbound crossing under Clover Creek Exit 278 will be restricted to 16 feet 08 in. in height. Estimated date of completion is September 30, 2016.

I-84 MP 285.68 to MP 289.17 EB & WB (North Powder)

Effective April 4, 2016, this section of I-84 will be restricted to 20 feet 00 in. in width. Estimated date of completion is October 14, 2016.

I-84 MP 327 to MP 332 EB & WB (Durkee)

Effective March 21, 2016, this section of I-84 will be restricted to 17 feet 06 in. in width. Loads wider than 17 feet 06 in. in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is November 4, 2016.

I-84 MP 332.70 to MP 333.20 WB (Durkee)

Effective September 6, 2016, this section of I-84 will be restricted to 14 feet 06 in. in width between the hours of 6 PM & 6 AM. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 06 in. in width. Loads wider than 14 feet 06 in. in width may be accommodated on case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is October 15, 2016.

I-84 MP 354 to MP 346 WB (west of Ontario)

Effective July 11, 2016, this section of I-84 westbound will be restricted to 12 feet 00 in. in width between the hours of 6 PM & 6 AM. In addition, this section of I-84 westbound will be restricted to 16 feet 00 in. in width between the hours of 6 AM & 6 PM. Loads exceeding these dimensions may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is August 26, 2016.

I-84 MP 347.85 WB (west of Ontario)

Effective July 11, 2016, this section of I-84 westbound will be restricted to 18 feet 09 in. in height. Estimated date of completion is August 26, 2016.

I-205 MP 3.2 to MP 5.4 NB & SB (Lake Oswego)

Effective August 26, 2016, this section of I-205 will be restricted to 14 feet 00 in. in width between the hours of 10 PM & 5 AM. Estimated date of completion is August 28, 2016.

I-205 NB Exit 13 off-ramp to OR213/82nd Ave & OR224 (Milwaukie)

Effective August 17, 2016, the northbound I-205 Exit 13 off-ramp to OR213/82nd Ave & OR224 will be restricted to 14 feet 00 in. in width between the hours of 9 PM & 5 AM. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 in. in width. Estimated date of completion is September 15, 2016.

I-205 NB on-ramp from Foster Rd (Portland)

Effective August 4, 2016, the ramp from Foster Rd to I-205 northbound will be intermittently closed per the following schedule: Sunday to Thursday nights between the hours of 8 PM & 5:30 AM; Friday nights between the hours of 8 PM & 8 AM; Saturday nights between the hours of 8 PM & 9 AM. Estimated date of completion is September 15, 2016.

I-205 MP 18.11 NB & SB (Portland)

Effective August 4, 2016, this section of I-205 will be restricted to 14 feet 00 in. in width per the following schedule: Sunday to Thursday nights between the hours of 8 PM & 5:30 AM; Friday nights between the hours of 8 PM & 8 AM; Saturday nights between the hours of 8 PM & 9 AM. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Estimated date of completion is September 15, 2016.

I-205 SB Exit 17 ramp to Foster Rd (Portland)

Effective August 4, 2016, the ramp I-205 southbound to Foster Rd will be intermittently closed per the following schedule: Sunday to Thursday nights between the hours of 8 PM & 5:30 AM; Friday nights between the hours of 8 PM & 8 AM; Saturday nights between the hours of 8 PM & 9 AM. Estimated date of completion is September 15, 2016.

I-405 SB ramp to I-5 SB (Portland)

Effective August 19, 2016, the ramp from I-405 southbound to I-5 southbound will be intermittently closed on Friday and Saturday nights between the hours of 10 PM & 9 AM. Estimated date of completion is September 19, 2016.

I-405 NB Exit 3 to US30 WB (Portland) -- NEW --

Effective September 23, 2016, the ramp from I-405 northbound Exit 3 to US30 westbound will be closed between the hours of 10 PM & 5 AM. Estimated date of completion is September 25, 2016.

I-405 SB ramp from N Cook St/N Kerby Ave (Portland)

Effective August 4, 2016, the ramp from N Cook St/N Kerby Ave to I-405 southbound will be intermittently closed per the following schedule: Sunday to Thursday nights between the hours of 8 PM & 5:30 AM; Friday nights between the hours of 8 PM & 7 AM; Saturday nights between the hours of 8 PM & 8 AM. These closures are NOT in on the I-405 mainline. Estimated date of completion is September 15, 2016.

U.S. Routes

US20 MP 13.27 to MP 13.45 EB (Lebanon)

Effective September 10, 2016, this section of US20 eastbound will be closed between the hours of 10 AM & 10 PM for one day only.

US20 MP 16.3 EB & WB (west of Eddyville)

Effective August 14, 2016, this section of US20 will be closed on Saturday to Thursday nights between the hours of 7:30 PM & 5:30 AM. Estimated date of completion is October 31, 2016.

US20/OR34 EB ramp to OR99W NB (Corvallis) -- NEW --

Effective September 12, 2016, the ramp from US20/OR34 eastbound to OR99W northbound will be intermittently closed on Monday to Friday between the hours of 7 PM & 6 AM. Estimated date of completion is September 21, 2016.

US20 MP 56.6 EB & WB (east of Sweet Home)

Effective August 1, 2016, this section of US20 will be closed. Estimated date of completion is September 27, 2016.

US26 MP 32.47 to MP 30.43 WB (east of Portland)

Effective August 26, 2016, this section of US26 westbound will be restricted to 12 feet 00 in. in width between the hours of 5 AM & 10 PM for one day only.

US26 MP 49.20 to MP 57.45 EB & WB (Government Camp)

Beginning April 1, 2016, this section of US26 will be closed for approximately 30 minutes on Mon/Tues/Thurs nights between the hours of 5:30 PM & 6:30 PM. Beginning June 1, 2016, the 30 minute closures will occur between 6:30 PM & 7:30 PM. In addition, there will also be intermittent traffic stops lasting up to 20 minutes at other times during construction work. No construction work will occur on holidays and Sundays. The estimated completion date is September 30, 2016.

Glencoe Rd crossing over US26 (North Plains)

Effective August 4, 2016, Glencoe Rd crossing over US26 will be intermittently closed per the following schedule: Sunday to Thursday nights between the hours of 10 PM & 5 AM; Friday nights between the hours of 10 PM & 7 AM; Saturday nights between the hours of 10 PM & 8 AM. This closure is NOT on the US26 mainline. Estimated date of completion is September 15, 2016.

US26 EB on-ramp from SB OR35 (Government Camp)

Effective August 29, 2016, the US26 eastbound on-ramp from southbound OR35 will be intermittently closed between the hours of 9:30 PM & 5 AM. Estimated date of completion is September 8, 2016.

US26 EB ramp to OR35 NB (Government Camp) -- NEW --

Effective August 28, 2016, the ramp from US26 eastbound to OR35 northbound will be restricted to 8 feet 06 in. in width from 1/2 hr after sunset to 1/2 hr before sunrise. Estimated date of completion is September 8, 2016.

US26 MP 57.85 WB (North Plains)

Effective August 4, 2016, this section of US26 westbound will be restricted to 14 feet 00 in. in width per the following schedule: Sunday to Thursday nights between the hours of 9 PM & 5 AM; Friday nights between the hours of 10 PM & 8 AM; Saturday nights between the hours of 10 PM & 9 AM. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. No restrictions will be in place on the following dates: August 5; August 6; August 7; August 26; August 27. Estimated date of completion is September 15, 2016.

US26 WB ramp from 185th Ave NB (Hillsboro)

Effective August 4, 2016, the ramp from 185th Ave northbound to US26 westbound will be intermittently closed per the following schedule: Sunday to Thursday nights between the hours of 9 PM & 5 AM; Friday nights between the hours of 9 PM & 7 AM; Saturday nights between the hours of 9 PM & 8 AM. This restriction is NOT on the US26 mainline. Estimated date of completion is September 15, 2016.

185th Ave crossing over US26 (Hillsboro)

Effective August 4, 2016, 185th Ave crossing over US26 will be restricted to 14 feet 00 in. in width per the following schedule: Sunday to Thursday nights between the hours of 9 PM & 5 AM; Friday nights between the hours of 9 PM & 7 AM; Saturday nights between the hours of 9 PM & 8 AM. This restriction is NOT on the US26 mainline. Estimated date of completion is September 15, 2016.

US30 MP 1.97 to MP 3.92 WB (Portland)

Effective June 20, 2016, this section of US30 westbound will be restricted to 14 feet 00 in. in width between the hours of 8 PM & 5 AM. Estimated date of completion is September 9, 2016.

US30 MP 5.76 to MP 5.82 EB & WB (Huntington)

Effective September 3, 2016, US30 between Lincoln Street and 1st Street will be closed between the hours of 7 AM & 5 PM for one day only for a classic car show.

US30 MP 6.51 to MP 13.10 EB & WB (west of Portland)

Effective June 30, 2016, this section US30 will be restricted to 14 feet 00 in. in width. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Loads wider than 14 feet 00 in. in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is October 31, 2016.

US30 MP 12.5 to MP 12.7 WB (south of Scappoose)

Effective August 26, 2016 at 8 PM, this section of US30 westbound will be restricted to 14 feet 00 in. in width. Estimated date of completion is August 27, 2016 at 3:30 AM.

US30 MP 50.5 to MP 61.0 EB & WB (west of Rainier)

Effective June 19, 2016, this section of US30 will be restricted to 12 feet 00 in. in width on Sunday to Thursday nights between the hours of 6 PM & 6 AM. Estimated date of completion is September 30, 2016.

US30 MP 79.45 to MP 87.75 EB & WB (Knappa)

Effective June 19, 2016, this section of US30 will be restricted to 12 feet 00 in. in width on Sunday to Thursday nights between the hours of 6 PM & 6 AM. Estimated date of completion is September 30, 2016.

US95 MP 20.7 to MP 25.6 NB & SB (Jordan Valley)

Effective August 8, 2016, this section of US95 will be restricted to 14 feet 00 in. in width on Monday through Friday between the hours of 6 AM & 9 PM. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Loads wider than 14 feet 00 in. in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is August 30, 2016.

US95 MP 57.70 to MP 58.05 NB & SB (Rome)

Effective August 8, 2016, this section of US95 will be restricted to 14 feet 00 in. in width on Monday through Friday between the hours of 6 AM & 9 PM. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Loads wider than 14 feet 00 in. in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is August 30, 2016.

US97 MP 141.86 to MP 149.22 NB & SB (south of Bend)

Effective August 15, 2016, this section of US97 will be restricted to 12 feet 00 in. in width on Sunday to Thursday nights between the hours of 7 PM & 7 AM. Estimated date of completion is September 23, 2016.

US97 MP 141.86 to MP 149.22 NB & SB (south of Bend)

Effective September 12, 2016, this section of US97 will be restricted to 16 feet 00 in. in width. Estimated date of completion is October 27, 2016.

US97 MP 142.70 NB & SB (crossing under BNSF trestle - south of Bend)

Effective September 12, 2016, this section of US97 will be restricted to 17 feet 02 in. in height. Estimated date of completion is October 27, 2016.

US97 MP 201.7 to MP 221.0 NB & SB (Chemult)

Effective August 8, 2016, this section of US97 will be restricted to 13 feet 00 in. width on Sunday to Thursday nights between the hours of 7 PM & 9 AM. Beginning September 3, 2016, the hours of restriction will be Sunday to Thursday nights between the hours of 1/2 hr after sunset to 1/2 hr before sunrise. Estimated date of completion is October 15, 2016.

US101 MP 211.21 NB & SB (Umpqua River Bridge - Reedsport)

Effective January 25, 2016, this section of US101 will be restricted to 11 feet 06 in. in width on Monday to Thursday nights between the hours of 7 PM & 7 AM. Estimated date of completion is September 1, 2017.

US101 MP 211.21 NB & SB (Umpqua River Bridge - Reedsport)

Effective January 25, 2016, this section of US101 will be restricted to 14 feet 00 in. in width on Monday to Thursday between the hours of 7 AM & 7 PM. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Loads wider than 14 feet 00 in. in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is September 1, 2017.

US101 MP 233.99 (McCullough Bridge - Coos Bay)

Effective October 15, 2013, this section of US101 will be restricted to 11 feet 00 in. in width between the hours of 9 PM & 5 AM. Estimated date of completion is November 1, 2018.

US101 MP 311.40 NB & SB (south of Port Orford)

Effective June 14, 2016, this section of US101 will be restricted to 14 feet 00 in. in width. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Estimated date of completion is August 31, 2016.

US101 MP 311.40 NB & SB (south of Port Orford)

Effective August 31, 2016, this section of US101 will be restricted to 10 feet 06 in. in width. No restrictions will be in place from 6 AM to 10 AM each day. Estimated date of completion is September 15, 2016.

US101 MP 347.78 NB & SB (Brookings)

Effective June 14, 2016, this section of US101 will be restricted to 14 feet 00 in. in width. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Estimated date of completion is September 23, 2016.

US101 MP 347.78 NB & SB (Brookings)

Effective September 23, 2016, this section of US101 will be restricted to 11 feet 06 in. in width. No restrictions will be in place from 6 AM to 10 AM each day. Estimated date of completion is October 14, 2016.

US199 MP 7 to MP 14 NB & SB (south of Grants Pass)

Effective May 23, 2016, this section of US199 will be restricted to 11 feet 00 in. in width on Sunday through Friday from 7 PM to 7 AM. Estimated date of completion is September 16, 2016.

OR Routes

OR8 MP 6.29 to MP 6.99 EB & WB (Aloha)

Effective November 10, 2015, this section of OR8 will be restricted to 14 feet 00 in. in width per the following schedule: Monday to Friday between the hours of 9 AM & 3 PM; Sunday to Thursday nights between the hours of 7 PM & 6:30 AM; Friday and Saturday nights between the hours of 7 PM & 9 AM. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Estimated date of completion is September 16, 2016.

OR18 Spur (Three Mile Ln) MP 46.75 NB & SB (McMinnville)

Effective September 13, 2016, this section of OR18 Spur (Three Mile Ln) will be restricted to 12 feet 00 in. in width on Monday to Friday between the hours of 7 AM & 6 PM. Estimated date of completion is September 20, 2016.

OR38 MP 0.96 to MP 8.10 EB & WB (east of Reedsport)

Effective August 1, 2016, this section of OR38 will be restricted to 12 feet 00 in. in width. No restrictions will be in place from 3 PM Friday through Sunday. Estimated date of completion is October 31, 2016.

OR38 MP 9.02 to MP 24.63 (near Scottsburg)

Effective August 1, 2016, this section of OR38 will be restricted to 10 feet 00 in. in width. No restrictions will be in place from 3 PM Friday through Sunday. Estimated date of completion is October 31, 2016.

OR38 MP 11.5 to MP 12.5 EB & WB (East of Reedsport)

Effective February 29, 2016, this section of OR38 will be restricted to 14 feet 00 in. in width. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Estimated date of completion is September 15, 2016.

OR38 MP 25.88 to MP 39.06 EB & WB (near Elkton)

Effective August 1, 2016, this section of OR38 will be restricted to 10 feet 00 in. in width. No restrictions will be in place from 3 PM Friday through Sunday. Estimated date of completion is October 31, 2016.

OR38 MP 40.58 to MP 42.59 EB & WB (west of Drain)

Effective August 1, 2016, this section of OR38 will be restricted to 12 feet 00 in. in width. No restrictions will be in place from 3 PM Friday through Sunday. Estimated date of completion is October 31, 2016.

OR43 NB ramp to City Center / I-5 SB / Ross Island Bridge (Portland)

Effective August 14, 2016, the ramp from OR43 northbound to City Center / I-5 SB / Ross Island Bridge will be closed. Estimated date of completion is August 29, 2016.

OR58 MP 70.0 to MP 86.5 EB & WB (near junction with US97) -- NEW --

Effective August 8, 2016, this section of OR58 will be restricted to 13 feet 00 in. width on Sunday to Thursday nights between the hours of 7 PM & 9 AM. Beginning September 3, 2016, the hours of restriction will be Sunday to Thursday nights between the hours of 1/2 hr after sunset to 1/2 hr before sunrise. Estimated date of completion is October 15, 2016.

OR99E MP -5.74 to MP -4.47 NB & SB (Portland)

Effective August 23, 2016, this section of OR99E will be restricted to 10 feet 00 in. in width from 1/2 hr after sunset to 1/2 hr before sunrise. Estimated date of completion is September 30, 2016.

OR99W MP 7.37 to MP 7.47 NB & SB (Portland)

Effective August 4, 2016, this section of OR99W will be restricted to 14 feet 00 in. in width per the following schedule: Sunday to Thursday nights between the hours of 8 PM & 5:30 AM; Friday nights between the hours of 8 PM & 7 AM; Saturday nights between the hours of 8 PM & 8 AM. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Estimated date of completion is September 15, 2016.

OR99W NB on-ramp to I-5 NB (Portland)

Effective August 18, 2016, the OR99W northbound on-ramp to I-5 northbound will be intermittently closed per the following schedule: Sunday through Thursday nights between the hours of 8 PM & 5:30 AM, Friday nights between the hours of 8 PM & 7 AM, and Saturday nights between the hours of 8 PM & 8 AM. Estimated date of completion is September 15, 2016.

OR99W MP 8.65 NB & SB (Tigard)

Effective July 29, 2016, this section of OR99W will be restricted to 14 feet 00 in. in width per the following schedule: Monday to Thursday nights between the hours of 8 PM & 6 AM; Friday nights between the hours of 8 PM & 9 AM; Saturday nights between the hours of 8 PM & 10 AM; Sunday nights between the hours of 9 PM & 6 AM. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Estimated date of completion is September 2, 2016.

OR99W MP 12.18 NB (King City)

Effective August 4, 2016, this section of OR99W northbound will be restricted to 14 feet 00 in. in width per the following schedule: Sunday to Thursday nights between the hours of 8 PM & 5:30 AM; Friday nights between the hours of 8 PM & 7 AM; Saturday nights between the hours of 8 PM & 8 AM. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Estimated date of completion is September 15, 2016.

OR99E MP 20.67 to MP 20.96 SB (Canby)

Effective August 17, 2016, this section of OR99E southbound will be restricted to 10 feet 00 in. in width Monday through Friday nights between the hours of 9 PM & 5 AM. Estimated date of completion is September 30, 2016.

OR99W NB ramp to OR34 (Corvallis Bypass) EB - Corvallis -- NEW --

Effective September 12, 2016, the ramp from OR99W northbound to OR34 (Corvallis Bypass) eastbound will be intermittently closed on Monday to Friday between the hours of 7 PM & 6 AM. Estimated date of completion is September 21, 2016.

OR138 (Harvard Ave) MP -0.80 to MP 0.17 EB & WB (Roseburg)

Effective August 12, 2015, this section of OR138 (Harvard Ave) will be restricted to 13 feet 00 in. in width. Loads wider than 13 feet 00 in. in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permits Unit for information. Estimated date of completion is September 16, 2016.

OR140 MP 25 to MP 35 EB & WB (Bly Mountain)

Effective February 24, 2015, this section of OR140 will be restricted to 12 feet 00 in. in width. Estimated date of completion is December 31, 2016.

OR211 MP 12.60 to MP 12.70 EB & WB (Molalla)

Effective August 22, 2016, this section of OR211 will be restricted to 16 feet 00 in. in width between the hours of 7:30 AM & 3:30 PM Monday through Friday. Loads wider than 16 feet 00 in. in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is September 1, 2016.

OR211 MP 13.5 to MP 16.4 EB & WB (Molalla)

Effective August 29, 2016, this section of OR211 will be restricted to 12 feet 00 in. in width between the hours of 7 AM & 7 PM. Loads wider than 12 feet 00 in. in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is September 30, 2016.

OR211 MP 26.0 to MP 31.2 EB & WB (Estacada)

Effective August 29, 2016, this section of OR211 will be restricted to 12 feet 00 in. in width between the hours of 8 AM & 7 PM. Loads wider than 12 feet 00 in. in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is September 30, 2016.

OR213 (NE 82nd Ave) MP 0.94 to MP 1.07 NB & SB (Portland) -- NEW --

Effective May 9, 2016, this section of OR213 (NE 82nd Ave) will be restricted to 14 feet 00 in. in width between the hours of 8 AM to 3 PM, and 10 PM to 6 AM. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Loads wider than 14 feet 00 in. in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is October 28, 2016.

OR213 (82nd Ave) MP 3.00 to MP 4.24 NB & SB (Portland)

Effective February 1, 2016, this section of OR213 (82nd Ave) will be restricted to 14 feet 00 in. in width. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Loads wider than 14 feet 00 in. in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is September 30, 2016.

Greenburg Rd crossing over OR217 (Tigard)

Effective August 4, 2016, Greenburg Rd crossing over OR217 will be intermittently closed per the following schedule: Sunday to Thursday nights between the hours of 8 PM & 5:30 AM; Friday nights between the hours of 8 PM & 7 AM; Saturday nights between the hours of 8 PM & 8 AM. This closure is NOT on the OR217 mainline. Estimated date of completion is September 15, 2016.

OR224 MP 0.38 EB & WB (Milwaukie)

Effective August 4, 2016, this section of OR224 will be restricted to 14 feet 00 in. in width per the following schedule: Sunday to Thursday nights between the hours of 8 PM & 5:30 AM; Friday nights between the hours of 8 PM & 8 AM; Saturday nights between the hours of 8 PM & 9 AM. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Estimated date of completion is September 15, 2016.

OR224 MP 13.65 to MP 13.86 EB & WB (Barton)

Effective June 2, 2016, this section of OR224 will be restricted to 14 feet 00 in. in width between the hours of 8 AM & 4 PM. Mobile homes with eaves are allowed, provided the base width does not exceed 14 feet 00 in. in width. Loads wider than 14 feet 00 in. in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. Estimated date of completion is September 20, 2016.

OR380 MP 0.08 to MP 0.15 EB & WB (Prineville)

Effective July 25, 2016, this section of OR380 will be restricted to 10 feet 00 in. in width. Estimated date of completion is December 31, 2016.

OR569 WB Exit 5 ramp to Barger Dr (Eugene)

Effective September 6, 2016, the ramp from OR569 westbound Exit 5 to Barger Dr will be intermittently closed on Monday through Friday between the hours of 8 PM & 6 AM. Estimated date of completion is September 23, 2016.

Lifted Restrictions

I-5 MP 110.86 NB (Booth Ranch Scale)

Effective August 18, 2016 at 9 AM, this section of I-5 northbound will be restricted to 15 feet 00 in. in width. Estimated date of completion is August 18, 2016.

I-5 MP 111.59 SB (Booth Ranch Scale)

Effective August 17, 2016 at 10 AM, this section of I-5 southbound will be restricted to 15 feet 00 in. in width. Estimated date of completion is August 17, 2016.

I-5 SB Exit 300B to OMSI / Oregon City (Portland)

Effective August 12, 2016, the ramp from I-5 southbound Exit 300B to OMSI / Oregon City will be closed between the hours of 10 PM & 6 AM. Estimated date of completion is August 13, 2016.

I-5 MP 301.7 SB (Portland)

Effective August 12, 2016, this section of I-5 southbound will be restricted to 16 feet 00 in. in width between the hours of 10 PM & 6 AM. Estimated date of completion is August 13, 2016.

I-5 SB on-ramp from Going St (Portland)

Effective August 9, 2016, the ramp from Going St to I-5 southbound will be closed between the hours of 9 PM & 5 AM. Estimated date of completion is August 16, 2016.

I-84 MP 54 to MP 55 EB (Starvation Creek)

Effective April 6, 2016, this section of I-84 eastbound will be restricted to 20 feet 00 in. in width. Estimated date of completion is June 30, 2016.

I-84 MP 353.34 WB (Farewell Bend Scale)

Effective August 24, 2016 at 12 noon, this section of I-84 westbound will be restricted to 15 feet 00 in. in width. Estimated date of completion is August 24, 2016.

I-84 MP 354.38 EB (Old's Ferry Scale)

Effective August 24, 2016 at 8 AM, this section of I-84 eastbound will be restricted to 15 feet 00 in. in width. Estimated date of completion is August 24, 2016.

I-405 MP 2.00 to MP 3.32 NB (Portland)

Effective July 29, 2016, this section of I-405 northbound will be restricted to 19 feet 00 in. in width between the hours of 10 PM & 5 AM on the following nights: July 29, 2016; July 30, 2016; August 26, 2016; August 27, 2016. Estimated date of completion is August 28, 2016.

I-405 MP 2.00 to MP 3.32 NB (Portland)

Effective July 29, 2016, this section of I-405 northbound will be restricted to 15 feet 08 in. in height between the hours of 10 PM & 5 AM on the following nights: July 29, 2016; July 30, 2016; August 26, 2016; August 27, 2016. Estimated date of completion is August 28, 2016.

I-405 NB Exit 3 to US30 (Portland)

Effective July 29, 2016, the ramp from I-405 northbound Exit 3 to US30 will be closed between the hours of 10 PM & 5 AM on the following nights: July 29, 2016; July 30, 2016; August 26, 2016; August 27, 2016. Estimated date of completion is August 28, 2016.

US97 NB & SB off-ramps to US97 Business (Klamath Falls)

Effective August 1, 2016, the US97 northbound and southbound off-ramps to US97 Business will be intermittently closed on Monday to Thursday between the hours of 6 AM & 4:30 PM. Estimated date of completion is August 18, 2016.

OR126 Business MP 1.69 to MP 2.46 EB & WB (Springfield)

Effective August 20, 2016, this section of OR126 Business will be closed between the hours of 5 PM & 11 PM for one day only.

BRIDGE RESTRICTIONS

Interstate Routes

I-5 MP 104.85 Chadwick Ln crossing over I-5 (near Riddle)

Chadwick Ln crossing over I-5 is restricted to the following weights: 20,000 single axle, 34,000 lbs. tandem axle - 80,000 lbs. GVW. Weight Table 1.

I-5 MP 151.81 Wilson Rd crossing over I-5 (Yoncalla)

Wilson Rd crossing over I-5 is restricted to the following weights: 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.

I-84 MP 256.42 Upper Perry Interchange crossing over I-84 (Perry)

Upper Perry Interchange crossing over I-84 is restricted to the following weights: 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW, Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.

U.S. Routes

US20 (Corvallis-Newport Hwy) MP 23.38 (Yaquina River Bridge - Eddyville)

Effective May 19, 2006, the Yaquina River Bridge near Eddyville is restricted to the following weights: 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads. Vehicles exceeding these weights may cross the bridge if they straddle the centerline, do not exceed 25 MPH and are the only vehicle on the bridge. Certified flaggers are required to stop traffic.

US30 (Historic Columbia River Hwy) MP 0.03 (Sandy River Bridge - Troutdale)

US30 (Historic Columbia River Highway) crossing the Sandy River Bridge is restricted to 30 tons gross weight.

US30 (Huntington Hwy) MP 0.46 (Burnt River Bridge - Lime)

Effective June 16, 2011, the Burnt River Bridge near Lime just off I-84 is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.

US30 (Historic Columbia River Hwy) MP 13.14 (Shepperds Dell Bridge)

US30 (Historic Columbia River Hwy) crossing Youngs Creek (Shepperds Dell) Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, Weight Table 1.

US30 (Historic Columbia River Hwy) MP 17.68 (West Multnomah Falls Bridge)

US30 (Historic Columbia River Hwy) crossing West Multnomah Falls Bridge is restricted to 28,000 lbs. for solo vehicles, 44,000 lbs. for 3-2 combinations, and 56,000 lbs. for 3-3 combinations.

US30 (Historic Columbia River Hwy) MP 20.39 (Horsetail Creek Bridge)

US30 (Historic Columbia River Hwy) crossing Horsetail Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, Weight Table 1.

US30 MP 30.42 (Bridge of the Gods - Cascade Locks)

Effective December 24, 2013, the Bridge of the Gods at US30 MP 30.42 is restricted to 80,000 lbs. GVW, Weight Table 1. This bridge belongs to the Port of Cascade Locks.

US30 OR/WA Border at Rainier (Lewis & Clark Bridge)

The Columbia River (Lewis & Clark) Bridge between Rainier, OR and Longview, WA is restricted to 21,500 lbs. per axle, no gross weight restriction. Contact the State of Washington at (360) 704-6340 for current information regarding size restrictions for this bridge.

US101 Business MP 4.78 (Lewis & Clark River Bridge - Astoria)

US101 Business crossing Lewis & Clark River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 80,000 lbs. GVW, Weight Table 1.

US101 Business MP 6.89 (Old Youngs Bay Bridge - Astoria)

Effective November 10, 2009, US101 Business crossing the Old Youngs Bay Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW, Weight Table 2.

US101 MP 40.71 (Neahkahnie Mtn Chasm Bridge - near Manzanita)

Effective November 15, 2004, Neahkahnie Mtn Chasm Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2 for divisible loads.

US101 MP 141.67 (Yaquina Bay Bridge - Newport)

Effective March 1, 2013, the Yaquina Bay Bridge in Newport is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW, Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW, Weight Table 3 for non-divisible loads. Non-divisible loads exceeding these weights (up to Weight Table 5) may cross the bridge if they stop traffic/straddle the centerline and are the only vehicle on the bridge when crossing. Certified flaggers are required to stop both northbound and southbound traffic. The rolling stop method is not allowed.

US101 MP 190.98 (Siuslaw River Bridge - Florence)

Effective March 17, 2003, the Siuslaw River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW. Weight Table 3 for non-divisible loads.

OR Routes

OR18 MP 51.57 (Yamhill River Bridge - Dayton)

OR18 crossing Yamhill River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.

OR22 MP 10.49 (Louie Creek Bridge - Dolph)

OR22 crossing Louie Creek Bridge is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, Weight Table 3 only.

OR22 MP 10.66 (Louie Creek Bridge - Dolph)

OR22 crossing Louie Creek Bridge is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, Weight Table 3 only.

Santiam River Bridge - Mill City (not on OR22 mainline)

1st St crossing Santiam River Bridge in Mill City is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2. This restriction is NOT on the OR22 mainline.

OR27 MP 1.90 (Irrigation Ditch - Prineville)

OR27 crossing Irrigation Ditch at MP 1.90 is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle, Weight Table 4.

OR27 MP 2.88 (Irrigation Ditch - Prineville)

OR27 crossing Irrigation Ditch at MP 2.88 is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle, Weight Table 4.

OR27 MP 4.62 (Irrigation Ditch - Prineville)

OR27 crossing Irrigation Ditch at MP 4.62 is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle, Weight Table 4.

OR27 MP 27.23 (Bear Creek Bridge - south of Prineville)

OR27 crossing Bear Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs GVW, Weight Table 2.

Old OR34 EB MP 0.13 (Willamette River / Van Buren St Bridge - Corvallis)

Old OR34 eastbound crossing Willamette River (Van Buren St) Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 80,000 lbs. GVW., Weight Table 1.

OR35 crossing Columbia River (White Salmon) Bridge - Hood River

OR35 crossing the Columbia River (White Salmon) Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 80,000 lbs. GVW, Weight Table 1. Bridge belongs to Port of Hood River.

OR43 MP 11.43 (Willamette River Arch Bridge - Oregon City)

OR43 crossing the Willamette River Arch Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 80,000 lbs. GVW, Weight Table 1.

OR53 MP 5.98 (Jack Horner Creek Bridge)

OR53 crossing Jack Horner Creek Bridge is restricted to 20,000 lbs. single axle, 40,000 lbs tandem axle, Weight Table 3.

OR99 MP 19.09 SB (Ashland Creek Bridge - Ashland)

Effective June 12, 2015, OR99 southbound crossing Ashland Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2. Effective January 14, 2016, 5-axle single unit vehicles will be limited to 58,000 lbs. GVW, 6-axle single unit vehicles will be limited to 64,000 lbs. GVW, 7-axle single unit vehicles will be limited to 72,000 lbs. GVW.

OR104 Spur MP 4.62 (Skipanon River Bridge - Warrenton)

Effective April 4, 2011, OR104 Spur crossing the Skipanon River Bridge is restricted to 38,000 lbs. for solo trucks, 56,000 lbs. for 3-2 axle truck combinations, 64,000 lbs. for 3-3 axle (or more) truck combinations.

OR120 (Swift Hwy / Portland Rd) MP 0.38 (Columbia Slough Bridge - Portland)

OR120 (Swift Hwy / Portland Rd) crossing Columbia Slough Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.

OR126 Business MP 1.34 WB (Willamette River / Main St Bridge - Springfield)

OR126 Business westbound crossing Willamette River / Main St Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.

OR130 (Little Nestucca Hwy) MP 3.23 (Panther Creek Bridge)

OR130 (Little Nestucca Hwy) crossing Panther Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.

OR130 (Little Nestucca Hwy) MP 3.60 (Squaw Creek Bridge)

OR130 (Little Nestucca Hwy) crossing Squaw Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.

OR130 (Little Nestucca Hwy) MP 3.82 (Austin Creek Bridge)

OR130 (Little Nestucca Hwy) crossing Austin Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.

OR130 (Little Nestucca Hwy) MP 4.15 (Little Nestucca River Bridge)

OR130 (Little Nestucca Hwy) crossing Little Nestucca River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.

OR130 (Little Nestucca Hwy) MP 4.76 (Bear Creek Bridge)

OR130 (Little Nestucca Hwy) crossing Bear Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2.

OR164 (Jefferson Hwy) MP 6.24 (Santiam River Bridge - Jefferson)

OR164 crossing the Santiam River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW. Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.

OR219 MP 23.46 (Willamette River Bridge - south of Newberg)

OR219 crossing Willamette River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle. 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.

OR234 MP 0.04 (Rogue River Bridge - west of Gold Hill)

OR234 crossing Rogue River Bridge west of Gold Hill is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW, Weight Table 2 for divisible Loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW, Weight Table 3 for non-divisible loads.

OR234 MP 16.01 (Rogue River Bridge - east of Gold Hill)

Effective June 21, 2016, OR234 crossing the Rogue River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 80,000 lbs. GVW, Weight Table 1.

OR241 MP 0.51 (Isthmus Slough)

MP 0.51 Isthmus Slough (1/2 mile from US101) is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 80,000 lbs. GVW., Weight Table 1

OR339 (Freewater Hwy) MP 2.76 (West Crockett Branch Bridge - Milton-Freewater)

OR339 (Freewater Hwy) crossing West Crockett Branch Bridge is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle, Weight Table 4.

OR339 (Freewater Hwy) MP 3.16 (East Fork Little Walla Walla River Bridge - Milton-Freewater)

OR339 (Freewater Hwy) crossing East Fork Little Walla Walla River Bridge is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle, Weight Table 4.

OR339 (Freewater Hwy) MP 3.31 (West Fork Little Walla Walla River Bridge - Milton-Freewater)

OR339 (Freewater Hwy) crossing West Fork Little Walla Walla River Bridge is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs. tri-axle, Weight Table 4.

Other Jurisdictions

Old OR99 (DC388) Old Winchester Bridge (Roseburg)

Old Winchester Bridge on DC388 (Old 99) at MP12.21 is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW.- Weight Table 2 Divisible Loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW.- Weight Table 3 Non- Divisible Loads.

Request email notification when restrictions change.